Original source · versioned page text
Architectural Plans
Plans and drawings: the text below has words only, no drawings.
Very large file (168 MB): may take a few minutes to open.
M N
5720
1 1
site boundary
site boundary
400.09 400.10
roof
RL56.450
NGL + 8.0m
tsh01
con01 tsh01 tsh01
stn01 gls01 gls01
3 Storey Weatherboard
& Block House
wc kitchen dining living
upper level - L2
RL51.450
con01
gls01
tbs01 2 Storey Weatherboard
NGL + 2.0m & Block House
laundry corridor pdr corridor
middle level - L1
RL48.125
NGL
tmv01
storage games room
lower level - L0
RL44.800
1 Section 12
200.00 1 : 100
general notes general items legend
RL 60.200 spot level L1 (level) window code. refer to window component code. 20 step up code. note step line
1. all works to be carried out in accordance with the general construction 6. levels and services locations for civil works may vary from those shown -
notes in coversheets of this package. verify all levels and services locations prior to commencement of tos = top of step w01 (window ref) elevations + door/window dp01 (refer material code for similar) occurs on low side of level
2. all works to be carried out in accordance with the DA (if required) and BA construction. bos = bottom of step hardware schedules lvl lvl - 20 mm change
including drawings & conditions. 7. concrete profile and blockwork setout is provided on 220 (series) of RL = lvl at point (AHD typ)
3. handrails are required to all stairways where a change of level of drawings, refer to these for setout. licensed surveyor to establish grids.
RL xx.xxx top of wall (surface) level door/gate code. refer to window ceiling code hose cock. refer serivces
1000mm or greater occurs as per BCA 2013 Part 3.9.2.4. where discrepancies occur the 220 series drawings are to take L1 (level)
d01 elevations + door/window 2700 * heights are relative to assocaited schedule. client to confirm
4. where boundary locations are not clear, the builder shall arrange for precedent. (door/gate ref) height* hc
hardware schedules Ipb01 finish** finished floor locations
survey to locate the boundaries and complete an identification survey 8. Trees and landscaping shown on DA drawings (elevations and sections)
* refer finishes schedule
prior to setting out the new work. are indicative only. SSL xx.xxx structural slab level
5. contours shown are existing and do not represent finished levels. 9. Footings shown on DA drawings (elevations and sections) are indicative
only. material code. refer finishes J0.1 joinery code. refer to cabinetry (cos) check on site
Ipb01 Ipb01 schedule (typical). elevations on 820 (series) and (mir) mirrored detail
FFL xx.xxx finished floor level (refer also to sanitary/ applicances/
level joinery
details on 830 (series) drawings (sim) similar detail
reference
lighting/services as appropriate) (part) partial detial
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0453
A 06/03/2025 client review 3 Allambi Rise, - section drawings SD 400.11 C SCALE 1 : 100
B 07/04/2025 SD issue for pricing Noosa Heads QLD 4567
A3
section 12
C 08/04/2025 DA issue
schematic design 1:1 @
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.