Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Attachment 8 - Interim Stormwater Management Plan - TOPO · 132005.638.06

of 60

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (19.4 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                    HES BASIN
                                                                                                                                                                                                                                                                                                      (SW5)


                                                                               )
                                                                             W2
                                                                           (S
                                                                      IN
                                                                    AS
                                                                  SB
                                                                HE




LEGEND
         MAJOR CONTOURS (5 m)
         MINOR CONTOURS (1 m)
         CADASTRAL BOUNDARIES
         UNDERGROUND DRAINAGE
         OPEN DRAINS
         DIVERSION BUNDS
         ROCK-LINED BATTER CHUTES

                                                                                                                                                                                                   CLIENT                                                                    PROJECT
                                                                                                              0                         70                               COPYRIGHT C                                     NOOSA COUNCIL                                                    NOOSA RESOURCE RECOVERY CENTRE
                                                                                                                                                                     TOPO GROUP PTY LTD
                                                                                                                                                                                                   DRAWN                   DESIGNED              DATE                        DRAWING TITLE
                                                                                                                       SCALE 1: 3500                          THIS DOCUMENT MAY NOT BE COPIED OR            SC                        SC             22-09-2026                              STORMWATER MANAGEMENT PLAN
                                                                                                                                             ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
                                       A       ORIGINAL ISSUE                          SC        22-09-2026                                                   MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                   RPEQ / SIGNATURE (IF REQUIRED)                                                                  DRAINAGE PLAN
                                                                                                                                       A3
                                                                                                                   H




                                                                                                                                                              THE WRITTEN CONSENT OF TOPO GROUP                                                                              PROJECT No                  DRAWING No         REVISION
                                                                                                                  RT
                                                                                                              O




                                    REVISION   DESCRIPTION                         APPROVED BY    DATE                                                                                                                                                                                    26-0293                     D02        A
                                                                                                              N




                                                                                                                                                                            PTY LTD.                                                       CPESC NO. 6,599 RPEQ NO. 15,545

Used in these records

About this file

File size
19.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Interim Stormwater Management Plan - TOPO.pdf · 19.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.