R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN




TABLE OF CONTENTS
1    INTRODUCTION                                                                                                1
2    CATCHMENT AND STAGING                                                                                       1
3    DRAINAGE DESIGN                                                                                             1
     3.1. DIVERSION DRAIN TO BASIN                                                                               1
     3.2. INLET DRAIN FOR DOSING                                                                                 1
     3.3. LEVEL SPREADER WEIR                                                                                    1
     3.4. DECANT STRUCTURE                                                                                       1
     3.5. EMERGENCY SPILLWAY                                                                                     1
     3.6. CLEAN WATER DIVERSION DRAIN                                                                            2
          3.6.1. MANNINGS ROUGHNESS SENSITIVITY ANALAYSIS                                                        2
4    BASIN VOLUME AND SIZE                                                                                       2
     4.1. EA REQUIREMENT                                                                                         2
     4.2. ASSESSMENT APPROACH                                                                                    2
     4.3. HISTORIC RAINFALL PERIOD                                                                               2
     4.4. CATCHMENT                                                                                              2
     4.5. CATCHMENT LOSSES                                                                                       3
          4.5.1. 10 YEAR 24 HOUR TRADITIONAL BASIN                                                               3
          4.5.2. TYPE A HES BASIN                                                                                3
     4.6. BASIN OPERATION APPROACH                                                                               3
          4.6.1. 10 YEAR 24 HOUR TRADITIONAL BASIN                                                               3
          4.6.2. TYPE A HES BASIN                                                                                3
     4.7. RESULTS                                                                                                3
5    HYDROLOGIC & HYDRAULIC MODELLING                                                                            3
     5.1. RAINFALL                                                                                               4
     5.2. PEAK FLOW RATE                                                                                         4
     5.4. PEAK FLOW DEPTHS                                                                                       6
6    OPERATION & MAINTENANCE                                                                                     7
     6.1. DOSING SYSTEM                                                                                          7
     6.2. MONITORING SYSTEM                                                                                      7
     6.3. SEDIMENT BASIN                                                                                         7
          6.3.1. FOREBAY                                                                                         7
          6.3.2. MAIN CELL                                                                                       8
     6.4. DESIGN EVENT & COMPLIANCE                                                                              8
APPENDIX A – CATCHMENTS & STAGING                                                                                9
APPENDIX B – BASIN CALCULATIONS                                                                                  10




Environment. Engineering. Education                                                                               PAGE ii

Used in these records

About this file

File size
19.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Interim Stormwater Management Plan - TOPO.pdf · 19.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.