Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Attachment 8 - Interim Stormwater Management Plan - TOPO · 132005.638.06

of 60

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (19.4 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                  LEGEND

                                                                                                                                                                                                                                                                     EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                     CATCHMENT BOUNDARY


                                                                                                                                                                                                                                                           1         CATCHMENT LABEL


                                                                                                                                                                                                                                                                     FLOW DIRECTION


                                                                      BIO                                                                                                                                                                                            FLOWPATH


                                                                                                                                                                                                                                                                     PROPERTY BOUNDARY




                                  OFFICE
                                  POND                                                                     SW4




                                                                                            SW4                                    BYPASS -
                                                                                                                                    STABLE




                                                       CLEAN -
                                                                                                              HES
                                                      INTERNAL
                                                                                                             BASIN




                                                                                                                     CELL 2.2 TO
                                            CLEAN -                                                                  LEACHATE
                                           EXTERNAL




                                                                                                                                                                SW5




                                                                                                                                                                                   CLIENT                                                  PROJECT
   D       CELL NUMBER REVISION                           KR        20/09/21     0                    80                                                 COPYRIGHT C                               NOOSA SHIRE COUNCIL                      NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                            KR        03/06/21                                                                         TOPO GROUP PTY LTD
                                                                                                                                                                                   DRAWN                   DESIGNED      DATE              DRAWING TITLE
   B       NEW ATC DESIGN                                 KR        12/04/21
                                                                                       SCALE 1:4000                                           THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR          31/03/21                       CONCEPT STORMWATER STAGING
                                                                                                                     ISSUED FOR USE           TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                                 KR        31/03/21                                                                  MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                   RPEQ / SIGNATURE (IF REQUIRED)                                                OVERALL CATCHMENT PLAN
                                                                               NORTH
                                                                                                      A3                                      THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                  PROJECT No                   DRAWING No          REVISION
REVISION   DESCRIPTION                                APPROVED BY   DATE                                                                                    PTY LTD.                                                                                       20-0211            CONCEPT-01         D

Used in these records

About this file

File size
19.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Interim Stormwater Management Plan - TOPO.pdf · 19.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.