Attachment 8 - Interim Stormwater Management Plan - TOPO · 132005.638.06

of 60

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (19.4 MB): may take a few minutes to open.

Log in to see the plans as drawn
DRAIN CALCULATIONS - 10% AEP

                                                                                                                                                                                                                                                                                                                       DEPTH
                   CATCH                                                TIME OF                                         LONG.                   SIDE SLOPE SIDE SLOPE                                                       MANNING
                                                                                                    FLOW - Q                            BASE                                                                                                  MAX PERM DESIGN VEL DEPTH OF                                             WITH        DRAIN TOP              OK /
DRAIN ID            AREA              ARI                 CARI           CONC            IARI                           SLOPE                        1               2                        LINING                         ROUGH
                                                                                                      (m3/s)                            WIDTH                                                                                                 VEL (m/s)                        (m/s)             FLOW (m)           F/BOARD        WIDTH (m)             NOT OK
                    (HA)                                                 (MINS)                                         (m/m)                     (1 in x)        (1 in x)                                                    COEFF
                                                                                                                                                                                                                                                                                                                          (m)

DW1 - START          0.3              10                    0.8            10            180            0.12             0.001            1          2               2                    Concrete                             0.015                   7                         0.54              0.17                   0.32         2.27                OK
DW1 - END             2               10                    0.8            10            180            0.80             0.001            1          2               2                    Concrete                             0.015                   7                         0.92              0.46                   0.61         3.42                OK
DW2                  2.8              10                    0.8            10            180            1.12             0.005            1          2               2                    Concrete                             0.015                   7                         1.81              0.36                   0.51         3.04                OK
DW3 - START          1.67             10                    0.8            10            180            0.67             0.005            1          2               2                    Concrete                             0.015                   7                         1.57              0.28                   0.43         2.70                OK
DW3 - END           3.67              10                    0.8            10            180            1.47             0.005            1          2               2                    Concrete                             0.015                   7                         1.95              0.41                   0.56         3.25                OK
DW4                  1.67             10                    0.8            10            180            0.67             0.005            1          2               2                    Concrete                             0.015                   7                         1.56              0.28                   0.43         2.70                OK
DW5 - START         0.63              10                    0.8            10            180            0.25             0.005            1          2               2                    Concrete                             0.015                   7                         1.17              0.16                   0.31         2.25                OK
DW5 - END            1.67             10                    0.8            10            180            0.67             0.005            1          2               2                    Concrete                             0.015                   7                         1.56              0.28                   0.43         2.70                OK

DRAIN CALCULATIONS - 1% AEP

                                                                                                                                                                                                                                                                                                                       DEPTH
                    CATCH                                               TIME OF                                         LONG.                   SIDE SLOPE SIDE SLOPE                                                       MANNING
                                                                                                    FLOW - Q                            BASE                                                                                                  MAX PERM DESIGN VEL DEPTH OF                                             WITH        DRAIN TOP              OK /
 DRAIN ID           AREA              ARI                   CARI         CONC            IARI             3
                                                                                                                        SLOPE                        1               2                        LINING                         ROUGH
                                                                                                       (m /s)                           WIDTH                                                                                                 VEL (m/s)                        (m/s)             FLOW (m)           F/BOARD        WIDTH (m)             NOT OK
                     (HA)                                                (MINS)                                         (m/m)                     (1 in x)        (1 in x)                                                    COEFF
                                                                                                                                                                                                                                                                                                                          (m)

 DW1 - START          0.3             100                   0.96           10            258            0.21             0.001            2          2               2                    Concrete                             0.015                   7                        0.56               0.16                   0.31         3.24               OK
 DW1 - END             2              100                   0.96           10            258            1.38             0.001            2          2               2                    Concrete                             0.015                   7                         1.01              0.46                   0.61         4.46               OK
 DW2                  2.8             100                   0.96           10            258            1.93             0.005            2          2               2                    Concrete                             0.015                   7                         1.97              0.36                   0.51         4.04               OK
 DW3 - START         1.67             100                   0.96           10            258            1.15             0.005            2          2               2                    Concrete                             0.015                   7                         1.68              0.27                   0.42         3.68               OK
 DW3 - END           3.67             100                   0.96           10            258            2.52             0.005            2          2               2                    Concrete                             0.015                   7                        2.14               0.42                   0.57         4.27               OK
 DW4                 1.67             100                   0.96           10            258            1.15             0.005            2          2               2                    Concrete                             0.015                   7                         1.68              0.27                   0.42         3.68               OK
 DW5 - START         0.63             100                   0.96           10            258            0.43             0.005            2          2               2                    Concrete                             0.015                   7                         1.22              0.15                   0.30         3.21               OK
 DW5 - END           1.67             100                   0.96           10            258            1.15             0.005            2          2               2                    Concrete                             0.015                   7                         1.68              0.27                   0.42         3.68               OK




                                                                                          CONCRETE
                                                                                          CONCRETE     LINED
                                                                                                   LINED                                                                                                                                                                             CONCRETE LINED




                                                             1 :2                       1:2                                                                                                                           1:2
                                                                                                                                                                                                                                                                               1:2
                                           0.5m




                                                                                                                                                                                                       0.5m
                                      VARIES                                                                                                                                                      VARIES

                                                                          1m
                                                                          0.6m                                                                                                                                                          m 2m           m



                                                   DIVERSION
                                                   10%       DRAIN
                                                       AEP DRAIN   - TYPICAL
                                                                 TYPICAL     DETAIL
                                                                          DETAIL                                                                                                                               DIVERSION DRAIN
                                                                                                                                                                                                                     1% AEP    - TYPICAL
                                                                                                                                                                                                                            DRAIN        DETAIL
                                                                                                                                                                                                                                   TYPICAL DETAIL
                                                                    DRAIN DEPTHS:                                                                                                                                                    DRAIN DEPTHS:

                                                                    DW1 START - 0.32m                                                                                                                                                DW1 START - 0.31m
                                                                    DW1 END - 0.61m                                                                                                                                                  DW1 END - 0.61m
                                                                    DW2 - 0.51m                                                                                                                                                      DW2 - 0.51m
                                                                    DW3 START - 0.43m                                                                                                                                                DW3 START - 0.42m
                                                                    DW3 END - 0.56m                                                                                                                                                  DW3 END - 0.57m
                                                                    DW4 - 0.43m                                                                                                                                                      DW4 - 0.42m
                                                                    DW5 START - 0.31m                                                                                                                                                DW5 START - 0.30m
                                                                    DW5 END - 0.43m                                                                                                                                                  DW5 END - 0.42m


                                                                                                                                                                                                                                              CLIENT                                                      PROJECT
                                                                                                                                                                                                                    COPYRIGHT C                                    NOOSA COUNCIL                                             NOOSA LANDFILL - RRA BASIN
                                                                                                                                                                                                                TOPO GROUP PTY LTD
                                                                                                                                                                                                                                              DRAWN                   DESIGNED            DATE            DRAWING TITLE

                                  B        REVISION FOLLOWING CLIENT COMMENTS                                      KR        29/04/24
                                                                                                                                                                             ISSUED FOR USE
                                                                                                                                                                                                         THIS DOCUMENT MAY NOT BE COPIED OR            KR                       KR           16/04/24               CONCEPT DRAINAGE AND BASIN
                                                                                                                                                                                                         TRANSMITTED IN ANY FORM OR BY ANY
                                  A        ORIGINAL ISSUE                                                          KR        16/04/24                                                                    MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                              RPEQ / SIGNATURE (IF REQUIRED)                                 DRAINAGE CALCULATIONS AND TYPICAL SECTIONS
                                                                                                                                                             A3                                          THE WRITTEN CONSENT OF TOPO GROUP                                                                PROJECT No                  DRAWING No                 REVISION
                               REVISION     DESCRIPTION                                                        APPROVED BY       DATE                                                                                  PTY LTD.                            CPESC - 5395, RPEQ - 15954                                  24-0078-C                   D04                B

Used in these records

About this file

File size
19.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Interim Stormwater Management Plan - TOPO.pdf · 19.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.