Council archive · source document
Attachment 8 - Interim Stormwater Management Plan - TOPO · 132005.638.06
Plans and drawings: the text below has words only, no drawings.
Very large file (19.4 MB): may take a few minutes to open.
R3341: NOOSA LANDFILL: RRA CONCEPT HES BASIN AND DRAINAGE DESIGN REPORT
1 YEAR ARI 24 HOUR TYPE A SEDIMENT BASIN
APPROX. DIMENSIONS
NUMBER APPROX.
APPROX.
SETTLING DECANT DECANT OF APPROX. APPROX. TOTAL
CATCH DESIGN MINIMUM MINIMUM ACTUAL EMPTY FULL LENGTH SETTLING
BASIN DEPTH IX yr, 24 hr GOVERN DFW MANUAL NUMBER HOLE DECANTS WIDTH AT DEPTH AT VOLUME
AREA EVENT Vs As VS SCOUR SCOUR AT VOLUME
ID DS (mm/hr) FACTOR (m) DFW (m) OF DIAMETER REQUIRED SPILLWAY SPILLWAY AT
(HA) (ARI) (m3) (m2) (m3) CHECK CHECK SPILLWAY (m3)
(m) HOLES (mm) FOR QA (m) (m) SPILLWAY
(m)
SELECTED (m3)
SW2 7.83 1.00 1 5.68 2891 846 VOLUME 2891 0.20 0.40 200 16 6.1 OK OK 99.1 33.0 1.6 2891 4613
Environment. Engineering. Education. PAGE 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Interim Stormwater Management Plan - TOPO.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.