Council archive · source document
Attachment 8 - Interim Stormwater Management Plan - TOPO · 132005.638.06
Plans and drawings: the text below has words only, no drawings.
Very large file (19.4 MB): may take a few minutes to open.
11
12.0 12.5
.5
13.0
11.5
13.
0
13.5
BASIN
RL11.00
FOREBAY
RL11.50
13.0
13.0
11.5
11.5
12.5
13.0
12.5
11
.5
.5
13
11.5
12.0
12.0
11.5
13.0
.5
13
BASIN LINING LAYOUT PLAN
0 5 10 15 20 25m
SCALE 1:500
LEGEND:
13.0 EXISTING CONTOUR (0.25m INTERVAL)
PROPOSED TOPSOIL AND TURF
PROPOSED ACCESS PAVEMENT
LININGS QUANTITIES
PROPOSED CONCRETE WORKS
(PLAN AREA)
BATTER TURF AREA = 1,600m²
ACCESS PAVEMENT AREA = 1,020m² PROPOSED ROCK PROTECTION
CONCRETE AREA = 4,905m²
Monday, April 29, 2024 12:48:30
ROCK PROTECTION AREA= 200m²
SCALE CLIENT PROJECT
COPYRIGHT C NOOSA COUNCIL NOOSA LANDFILL SEDIMENT BASIN
AS SHOWN TOPO GROUP PTY LTD
DRAWN DESIGNED DATE DRAWING TITLE
CONCEPT
THIS DOCUMENT MAY NOT BE COPIED OR MD KR 25/04/24 BASIN LINING LAYOUT PLAN
TRANSMITTED IN ANY FORM OR BY ANY
A PRELIMINARY ISSUE KR 25/04/24 MEANS IN PART OR IN WHOLE WITHOUT THE RPEQ / SIGNATURE (IF REQUIRED)
NOR
TH A3 WRITTEN CONSENT OF TOPO GROUP PTY LTD
. PROJECT No DRAWING No REVISION
REVISION DESCRIPTION APPROVED BY DATE P001546 C03 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Interim Stormwater Management Plan - TOPO.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.