Skip to the record
For the highest quality transcripts.

Council archive · source document

Attachment 8 - Interim Stormwater Management Plan - TOPO · 132005.638.06

of 60

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (19.4 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                11
                                                                                                                                                                 12.0                                                                                       12.5




                                                                                                                                .5
                                                                                                                                                          13.0




                                                                                                                                11.5




                                                                                                                                                                                                                                                          13.
                                                                                                                                                                                                                                                             0
                                                                                                                                                                                                                                                                                  13.5




                                                            BASIN
                                                            RL11.00
                                                                                                                                                                               FOREBAY
                                                                                                                                                                                      RL11.50




                                                                                                                                                  13.0




                                                                                                                                                                                                13.0
                                                                                                                   11.5
          11.5




                                                                                                                                                                                                        12.5
                                                                                                                                                                                 13.0


                                                                                                                                                                 12.5




                                                                                        11




                                                                                                                                                                                                                                    .5
                                                                                           .5




                                                                                                                                                                                                                                    13
       11.5




                                                                                                                                           12.0




                                                                                                                                                                               12.0
11.5




                                                                                                                                                                                                                   13.0




                                                                                                                                                                                                                                     .5
                                                                                                                                                                                                                                    13
                                                                                     BASIN LINING LAYOUT PLAN
                                                                                0        5      10      15    20          25m

                                                                                                SCALE 1:500

                                                                                                                                                                                                                LEGEND:
                                                                                                                                                                                                                             13.0            EXISTING CONTOUR (0.25m INTERVAL)

                                                                                                                                                                                                                                             PROPOSED TOPSOIL AND TURF


                                                                                                                                                                                                                                             PROPOSED ACCESS PAVEMENT

                                                                                                                                                         LININGS QUANTITIES
                                                                                                                                                                                                                                             PROPOSED CONCRETE WORKS
                                                                                                                                                         (PLAN AREA)
                                                                                                                                                         BATTER TURF AREA = 1,600m²
                                                                                                                                                         ACCESS PAVEMENT AREA = 1,020m²                                                      PROPOSED ROCK PROTECTION
                                                                                                                                                         CONCRETE AREA = 4,905m²




                                                                                                                                                                                                                                                                                                    Monday, April 29, 2024 12:48:30
                                                                                                                                                         ROCK PROTECTION AREA= 200m²

                                                                       SCALE                                                                                                   CLIENT                                                     PROJECT
                                                                                                                                                 COPYRIGHT C                                      NOOSA COUNCIL                                     NOOSA LANDFILL SEDIMENT BASIN
                                                                                     AS SHOWN                                                TOPO GROUP PTY LTD
                                                                                                                                                                               DRAWN                DESIGNED              DATE            DRAWING TITLE

                                                                                                                   CONCEPT
                                                                                                                                       THIS DOCUMENT MAY NOT BE COPIED OR               MD                  KR              25/04/24                       BASIN LINING LAYOUT PLAN
                                                                                                                                       TRANSMITTED IN ANY FORM OR BY ANY
                    A     PRELIMINARY ISSUE       KR        25/04/24                                                                   MEANS IN PART OR IN WHOLE WITHOUT THE   RPEQ / SIGNATURE (IF REQUIRED)


                                                                               NOR
                                                                                  TH            A3                                     WRITTEN CONSENT OF TOPO GROUP PTY LTD
                                                                                                                                                                           .                                                              PROJECT No               DRAWING No            REVISION
                 REVISION DESCRIPTION         APPROVED BY   DATE                                                                                                                                                                                       P001546                  C03          A

Used in these records

About this file

File size
19.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Interim Stormwater Management Plan - TOPO.pdf · 19.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.