Original source · versioned page text
2021-06-08 P&E Agenda - Item 6 - Attachment 1 - Noosa Bushland Reserve Strategic Management Plan 2021-2026
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn biodiversity value
retention.
Ongoing Management Requirements (costs and resource required)
Resourcing Effort Higher costs to 0 = Requires a large amount of resourcing over Expert Panel contributions informed by Noosa Local Government
enhance biodiversity an extended time (greater than 5 years) to historical resourcing levels and site Area Pest Management Plan
value equates to improve condition to pristine however has a knowledge. 2015-19
greater resource high risk of failure.
allocation required. 1 = Requires significant ongoing and targeted Noosa Biodiversity
intervention to manage invasive species to Conservation Plan 2017
improve reserve to pristine condition.
2 = Targeted moderate resource management
over 3 to 5 years will convert the reserve to
pristine condition.
3 = Requires regular monitoring and early
intervention activities to manage any invasive
species recruitment.
Active Volunteer Active Volunteer 0 - No volunteer group present NSC Staff allocation Noosa Biodiversity
Group present Groups provide 1 - low level active volunteer group present Conservation Plan 2017
volunteer labour to 2 - medium level active volunteer group
assist with the present
management of 3 - High level active group present
reserve.
Nature Refuge Status Nature Refuge status 1 - Not a Nature Refuge NSC Staff allocation Noosa Biodiversity
enables additional 2 - Is a nature Refuge Conservation Plan 2017
funding Queensland Government dataset
opportunities for Nature refuges – Queensland
management
resources.
Noosa Bushland Reserves Strategic Management Plan 2021 – 2026 Page 67
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.