Council archive · source document
180616-Response to Information Request. · MCU18/0135
Attached to the e-mail MCU18/0135 - Response to Information Request.
7.0 SEWERAGE RETICULATION
Refer to Engineering Drawing No. C6142/18/IWMP01 included within Appendix D for the
proposed sewer connection point.
An existing gravity sewer main is located within the Marcus Dunes Court verge to the
north of the site. An existing privately owner sewerage lift station is located at the north-
east corner of the site. It is assumed that this house connection branch will be located at
a suitable depth to service the proposed dwelling.
All internal sewer infrastructure will be designed by a suitably qualified Hydraulic
Consultant as part of a future plumbing application to Noosa Shire Council in conjunction
with Building Applications.
8.0 WATER SUPPLY
Refer to Engineering Drawing No. C6142/18/IWMP01 included within Appendix D for the
proposed water service connection point.
An existing water main and fire hydrant exists within the verge of Marcus Dunes Court to
the north of the site. The existing water meter should be located prior to/during
construction.
All internal water infrastructure will be designed by a suitably qualified Hydraulic
Consultant as part of a future plumbing application to Noosa Shire Council in conjunction
with future Building Applications.
9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
180616-Response to Information Request..pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.