Energex Referral Response - 63, 65, 67 & 68 Hofmann Dr, Noosaville · RAL25/0019

of 3

Text shows just the words. Original shows the document exactly as it was published.

24 December 2025


Chief Executive Officer
Noosa Council

Attention: Nadine Gorton
Via email: [email protected]

              cc      Stockwell Development Group Pty Ltd
                      Attention: Holly Lucas
                      Via email: [email protected]

Dear Sir/Madam,

Energex Advice Agency Response
Council Ref: RAL25/0019
Our Ref: ECM 36637435-36637214

This Referral Agency response is given under section 56 of the Planning Act 2016.

 Response
 Outcome                  Approved in full - subject to conditions
 Referral assessment      Advice
 capacity
 Matters referral         The purpose of the Electricity Act 1994 and Electricity
 assessment made          Safety Act 2002
 against (S55(2))
 Reasons for decision     The works do not conflict with:
 (S56(7)(b))
                                 the objectives set out within Part 2, Section 3 of the
                                  Electricity Act 1994
                                 the purpose of the Electricity Safety Act 2002 as set
                                  out within Part 1 Division 2 Section 4 & 5.
                          The works do not adversely impact on the safe, efficient,
                          and economically viable operation of the supply network.

 Development Details
 Applicant                   Stockwell Development Group Pty Ltd
 Assessment Manager          Noosa Council
 Council Application No.     RAL25/0019
 Street Address              63, 65, 67 & 68 Hofmann Dr Noosaville
 Real Property Description   Lot 3 SP 322201, Lot 4 SP 322201, Lot 5 SP 322201,
                             Lot 6 SP322201
 Development Type            Development Permit for Reconfiguring a Lot - Boundary
                             Realignment (4 Lots into 4 Lots)
 Referral Trigger            ☐ Schedule 10, Part 9, Division 2, Table 1, Item 1
                             (10.9.2.1.1) – Reconfiguring a lot subject to an easement
                             for the benefit of a distribution entity under the Electricity
                             Act for a supply network; or part of the lot is within 100m
                             of a substation site
Full text of the other 2 pages

Page 2

                                                   2




 Impacted Electrical              Easements EA, EB, EC ON SP322201 – U/G LV Cables
 Infrastructure

Energex provides the following response to the application in accordance with Section
56(1) of the Planning Act 2016:

 Component of                     Advice Agency direction
 Development
 ROL                              ☐ S56(1)(b)(i) – approval subject to stated development
                                  conditions


In accordance with Section 56(1) should the Assessment Manager decide to approve
the proposed Development Application, as an Advice Agency, Energex requires that
the assessment manager impose the below conditions. These conditions have been
imposed in response to the matters prescribed under Section 55 (2) of the Planning Act
2016.

                                         Table 1
                            Plans forming part of this Approval
 Title                    Plan No.            Issue                             Date
 Plan of Lots 3-6         SP357720            -                                 10.09.25
 Cancelling Lots 3-6
 on SP322201
 (sheet 1 of 5)

                                               Table 2
 Condition                               Timing                               Purpose/Reason
 1   Carry out the approved              At all times                         To ensure the
     development generally in                                                 development is
     accordance with the                                                      carried out generally
     approved plans and                                                       in accordance with
     documents outlined within                                                the plans of
     Table 1 of this approval                                                 development
     and the following:                                                       submitted within the
                                                                              application
              The specifications,
               facts and
               circumstances as
               set out in the
               development
               application
               submitted to
               Energex; and
              Where a
               discrepancy or
               conflict exists
               between the
               written conditions
               of the approval and
               the approved
               plans, the
               requirements of the

                                  Have you seen our fact sheets?
    See the ‘considerations when developing around electricity infrastructure’ section of our website
                                www.energex.com.au/referralagency

Page 3

                                                    3




                 written conditions
                 prevail
 2       Any alterations to the plans     At all times                         To ensure the
         and document(s) identified                                            development is
         within Table 1 of this                                                carried out generally
         response are to be                                                    in accordance with
         resubmitted to Energex for                                            the plans of
         comment                                                               development
                                                                               submitted within the
                                                                               application

General Advice:

        Compliance with the Electrical Safety Act 2002, including any Code of Practice
         under the Act and the Electrical safety Regulation 2013 including any safety
         exclusion zones defined in the Regulation is mandatory

         Should any doubt exist in maintaining the prescribed clearance to the overhead
         conductors and electrical infrastructure then the applicant is obliged under the
         Act to seek advice from Energex.

        Any costs incurred by Energex as a result of the works on the easement are to
         be met by the property Developer / owner.

        This response does not constitute an approval to commence any works within
         the easement. Consent to commence works relevant to the conditions of the
         easement is required. All works on easement (including but not limited to
         earthworks, drainage and detention basins, road construction, underground and
         overhead services installation) require detailed submissions, assessment, and
         consent (or otherwise) by Energex.

        All works proposed to be undertaken in close proximity to overhead or
         underground electrical lines are to be undertaken in accordance with Energex’s
         Works Practice Manual WP1323. This document refers to various standards,
         guidelines, calculations, legal requirements, technical details, and other
         information relevant to working near high voltage infrastructure. A copy of
         WP1323 can be found online via Energex’s document library (Document library
         | Energex).

Should you require any further information on the above matter, please contact Harriet
Veal on 0427 293 604 or via email at [email protected] faithfully,


Harriet Veal
Town Planner




                                   Have you seen our fact sheets?
     See the ‘considerations when developing around electricity infrastructure’ section of our website
                                 www.energex.com.au/referralagency

Used in these records

About this file

File size
123 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Energex Referral Response - 63, 65, 67 & 68 Hofmann Dr, Noosaville.pdf · 123 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.