Energex Referral Response - 63, 65, 67 & 68 Hofmann Dr, Noosaville · RAL25/0019
24 December 2025
Chief Executive Officer
Noosa Council
Attention: Nadine Gorton
Via email: [email protected]
cc Stockwell Development Group Pty Ltd
Attention: Holly Lucas
Via email: [email protected]
Dear Sir/Madam,
Energex Advice Agency Response
Council Ref: RAL25/0019
Our Ref: ECM 36637435-36637214
This Referral Agency response is given under section 56 of the Planning Act 2016.
Response
Outcome Approved in full - subject to conditions
Referral assessment Advice
capacity
Matters referral The purpose of the Electricity Act 1994 and Electricity
assessment made Safety Act 2002
against (S55(2))
Reasons for decision The works do not conflict with:
(S56(7)(b))
the objectives set out within Part 2, Section 3 of the
Electricity Act 1994
the purpose of the Electricity Safety Act 2002 as set
out within Part 1 Division 2 Section 4 & 5.
The works do not adversely impact on the safe, efficient,
and economically viable operation of the supply network.
Development Details
Applicant Stockwell Development Group Pty Ltd
Assessment Manager Noosa Council
Council Application No. RAL25/0019
Street Address 63, 65, 67 & 68 Hofmann Dr Noosaville
Real Property Description Lot 3 SP 322201, Lot 4 SP 322201, Lot 5 SP 322201,
Lot 6 SP322201
Development Type Development Permit for Reconfiguring a Lot - Boundary
Realignment (4 Lots into 4 Lots)
Referral Trigger ☐ Schedule 10, Part 9, Division 2, Table 1, Item 1
(10.9.2.1.1) – Reconfiguring a lot subject to an easement
for the benefit of a distribution entity under the Electricity
Act for a supply network; or part of the lot is within 100m
of a substation site
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
2
Impacted Electrical Easements EA, EB, EC ON SP322201 – U/G LV Cables
Infrastructure
Energex provides the following response to the application in accordance with Section
56(1) of the Planning Act 2016:
Component of Advice Agency direction
Development
ROL ☐ S56(1)(b)(i) – approval subject to stated development
conditions
In accordance with Section 56(1) should the Assessment Manager decide to approve
the proposed Development Application, as an Advice Agency, Energex requires that
the assessment manager impose the below conditions. These conditions have been
imposed in response to the matters prescribed under Section 55 (2) of the Planning Act
2016.
Table 1
Plans forming part of this Approval
Title Plan No. Issue Date
Plan of Lots 3-6 SP357720 - 10.09.25
Cancelling Lots 3-6
on SP322201
(sheet 1 of 5)
Table 2
Condition Timing Purpose/Reason
1 Carry out the approved At all times To ensure the
development generally in development is
accordance with the carried out generally
approved plans and in accordance with
documents outlined within the plans of
Table 1 of this approval development
and the following: submitted within the
application
The specifications,
facts and
circumstances as
set out in the
development
application
submitted to
Energex; and
Where a
discrepancy or
conflict exists
between the
written conditions
of the approval and
the approved
plans, the
requirements of the
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
Page 3
3
written conditions
prevail
2 Any alterations to the plans At all times To ensure the
and document(s) identified development is
within Table 1 of this carried out generally
response are to be in accordance with
resubmitted to Energex for the plans of
comment development
submitted within the
application
General Advice:
Compliance with the Electrical Safety Act 2002, including any Code of Practice
under the Act and the Electrical safety Regulation 2013 including any safety
exclusion zones defined in the Regulation is mandatory
Should any doubt exist in maintaining the prescribed clearance to the overhead
conductors and electrical infrastructure then the applicant is obliged under the
Act to seek advice from Energex.
Any costs incurred by Energex as a result of the works on the easement are to
be met by the property Developer / owner.
This response does not constitute an approval to commence any works within
the easement. Consent to commence works relevant to the conditions of the
easement is required. All works on easement (including but not limited to
earthworks, drainage and detention basins, road construction, underground and
overhead services installation) require detailed submissions, assessment, and
consent (or otherwise) by Energex.
All works proposed to be undertaken in close proximity to overhead or
underground electrical lines are to be undertaken in accordance with Energex’s
Works Practice Manual WP1323. This document refers to various standards,
guidelines, calculations, legal requirements, technical details, and other
information relevant to working near high voltage infrastructure. A copy of
WP1323 can be found online via Energex’s document library (Document library
| Energex).
Should you require any further information on the above matter, please contact Harriet
Veal on 0427 293 604 or via email at [email protected] faithfully,
Harriet Veal
Town Planner
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
Used in these records
Energex Referral Response - 63, 65, 67 & 68 Hofmann Dr, Noosaville.pdfRelated documentApplication case desk ↗
About this file
- File size
- 123 KB (small file)
- File type
No other editions are linked here.