Original source · versioned page text
DA Form 1 21 Myles St
Attached to the e-mail FW_ APPLICATION for approval for non standard secondary cross-over 21 Myles St Tewantin.msg.
11) Divi ste and into parts by w Many parts aro being created and what is the intended use of the
Other, please specify:
‘or each lot cor
= anc proposed &
Pe pea: Current tot
| Lot on plan description ae Area (me)
mpnising
Proposed lot
Lot on plan description LA
rozson for the boundary realignment?
Vnat is the
ure of any existing easements being changed and/or any proposed easement?
eels nd]
| Purpose of the easement? (eg. Identify the land/tot(s)
| pedestian sccess) benefitted by the easement
14 1) What is the nature of the operational work?
[J Stormwater (0 Water infrastructure
(C0 Earthworks CO Sewage infrastructure
CO Signage. ____F. Glearing vegetation
Secomdan
14.2) Is the operat i work necessary to facilitate the creation of new lots? (¢ 9 subdivision
Pe Sue cM She a 12) bate xt no ebro dia eee ok Ronan ta ee eee na
Pirate eels)
Peet aac eer eae stick teehee )\ eee tla for this development application?
_] Yes — a copy of the decision notice is attached to this development scolcelan
L) The focal government is taken to have agreed to the superseded planning scheme request — relevant Socuments |
attached
LCINo
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.