Original source · versioned page text
DA Form 1 21 Myles St
Attached to the e-mail FW_ APPLICATION for approval for non standard secondary cross-over 21 Myles St Tewantin.msg.
(1) Heritage places ~ Local heritage places
Matters requiring referral to the Chief Executive of the distribution entity or transmission entity:
(CL Infrastructure-related referrals — Electricity infrastructure
Matters requiring referral to:
« The Chief Executive of the holder of the licence, if not an individual
« The holder of the licence, if the holder of the licence is an individual
(1 infrastructure-related referrals — Oil and gas infrastructure
Matters requiring referral to the Brisbane City Council:
C] Ports — Brisbane core port land
Matters requiring referral to the Minister responsible for administering the Transport Infrastructure Act 1994:
() Ports = Brisbane core port land (where inconsistent with the Brishane port LUP tor transport reasons)
[1] Ports — Strategic | port land
Matters requiring referral to the relevant port operator, if applicant i is not port operator:
() Ports — Land within Port of Brisbane's port limits (nefow high-wafar mark)
a ee
Matters requiring referral to the Chief Executive of the relevant port authority:
(1 Ports — Land within limits of another port (below high. weator mark)
Mattors requiring referral to the Gotd Coast Waterways Authority:
(CO Tidal works or work in a coastal management district {ar Gold Coast waters)
Matters requiring reforral to the Queensland Fire and Emergency Service:
(CF Tidal works or work in a coastal management district (involving a marina (more than six ves! berths))
CI Yes = referral reaponeets) received and listed below are attached to this aaenberand ‘soplicaton
L]No eA
Referral requirement Referral agency Dato of referral reeporieg }
identify and describe any changes made to the proposed development application that was the subject of the
referral response and this development application, or include details in a schedule to this developmerit application
(if appitcabie) a
PART 6 — INFORMATION REQUEST
[-}T agree to receive an information request if determined necessary for this development application
(J | do not agree to accept an information request for this development application |
Note: By not egreeing to accept an information request I, he applicant, acknowledge: |
* that this develonment application will be assessed and decided based on the information provided whan making this devalooment }
application and the assessment manager and any roferral agencies relevant to the development application are not abliguied under the DA |
Rules fo accept any additional information provided by the applicant for the development apptication uniass agreed fo by the refevant j
* = Part 2 of the DA Rules will stl apply if the sppiication Is an apwication listed under sxchori 17.3 of the DA Rutes
Further schiice about sornason requests & rontewred 67 te 28 Forme Guage A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.