Council archive · source document
08/0170 - Approved Plans [As Published] · 132008.170
Plans and drawings: the text below has words only, no drawings.
Very large file (18.4 MB): may take a few minutes to open.
we °
ee
GPs |
600sq, $L24.100
~ It23;500~”
Detention and infiltration
chamber, standard, concrete
recast, 61050 internal, depth
350, with heavy duty lid
$L15.800 ‘|
1L15.000
V7 (
(L14.600
Vo
IL14,900
—__ Vv
ILt4.300
Coarse gravel
9 te
228 eperforated FvC. min size 80mm
wrapped in geotextile
STORMWATER ON SITE SILT TRAP, INFILTRATION & OVERFLOW SYSTEM SCALE: NTS
ORMWATER_ DRAINAGE
“S43 448
. So
~N
FOX BAFFLED GROSS POLLUTANT
LLECTION TRAP DETAIL WITH RISER
ATTACHED TO 450mm TRENCH GRATE
NTS
NOTES:
1,
Provide second stage treatment, first flush and
sitt trap chamber. #1050 concrete as per detail.
. Provide First stage treatment, baffled Gross
Pollutant trap (BGPT) Type; "FOX or
“CLEARMATE with 300mm riser, as per detail.
|. Provide a 450mm wide trafficable grated drain
and discharge to BGPT above strainer basket.
. Provide a new #1050 concrete standard SW
manhole over existing SW ond connect a #300
RCP. For details refer to Sunshine Coast
Regional Councii standard drawings.
. Provide a stormwater harvesting tank with o
minimum volurne of 15,000 litres.
BGPT SL15.900
OUTLET: {L15.500
See note—2
Sw—— Sw-_—__-sw
Levels subject to survey.
Saw cut at existing
Pavement refer
project documentation Pavement . .
for detail 50mm Asphattic paving
PRY Sg RRR
RR
Existi Beene) oS
isting EOS (GEER RE REA
Pavement Deep
lift asphaltic concrete
No fines concrete backfill
(8 parts 10mm NOM size
aggregate to 1 part cement)
Coarse or
fine bedding
XCAVATION, BEDDING AND BACKFILLING
OF STO ATER DRAINAGE PIPES
SCALE 1:20
Notes:
1. Selected backfill in al! cases shall be carried through to the wings and
continued 300 thick for the length and height of wings.
2. Bedding compaction (Compacted selected fill/sand bedding)
Cohesive moterial — 95% standard compaction
Non—cohesive material — density indes of 70min, refer AS1289.E5.1
Sond ~ compact by flooding ond use of vibrators.
3. Backfill compaction
Compacted gravel (300mm) layer under road pavement 95% standard compaction
Compacted ordinary fill/CBR15 Gravel 90% standard compaction — below 300mm zone.
Compacted backfill — at footpaths/private Property 90% standard compaction.
MAX, densities determined by standard compaction tests to AS1289.5.1.1.
4. Type U & Type H1 to conform to AS3725.
5. Dimension A can be reduced to 150min for non mechanical
compaction of backfill.
NSHINE COAST
REGIONAL COUNCIL
PPROVED
PLANS, AB P'
600mm DIA cast iron cover
‘and frame. Refer Note 11
Top of access chamber
100 above finish surface but
flush with povernents.
DETAIL MH 1/2
HITE
pf
Hf}
PT
Pe
= | Date |
[issue Notes
pproval] x [| 203-08 |
pop
er ee
>}
s Constructed
contact: Reinhold Koenning MigAust RPEQ No 7023
Budding ald 4575
juddina
email: [email protected] PH: 5444 8645
d. FX: 5444 8224
ALTUM CONSTRUCTIONS
SPARKS ARCHITECTS
PRovect: NEW DUPLEX RESIDENCE
8 EGRET STREET
PERIGIAN BEACH QLD
SITE STORMWATER
DRAINAGE
Nee cee ae eor-2 |
wna? 2|t901-2 |
RPD:— Lot 293 on plot 93112
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0170 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.