Original source · versioned page text
Appendix D- SWMP
Very large file (13.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
29 September 2023 The existing car park will continue to drain to the remaining bioretention basins which will be retained as part of the Stage 2 retail development. The bioretention basins will be located to take direct downpipe discharge from the roof and car park areas in order to ensure the basins are shallow when situated within the surrounding natural ground. Stormwater treatment will be implemented to remove sediments, nutrients, gross pollutants and hydrocarbons in accordance with the requirements of Noosa Council and the State Planning Policy. Stormwater discharged from site is proposed to be consistent with the existing retail development discharge. The location of the new Stage 2 retail is over existing impervious area and as such will not increase the sites percentage impervious or peak runoff volume. The proposed conceptual stormwater drainage layout is depicted on MPN Plan 9954-DA03-06 attached in Appendix 2. 4.5.2 Stormwater Quantity Management Strategy The proposed development site will connect into the existing drainage system for the Noosa Civic Shopping Centre. The sites minor flows will run through the existing pipe system whilst the major overflows will overland flow down the internal roads prior to discharging to the creek to the south of the site in accordance with the overall Noosa Civic and Noosa Business Centre development. There will be no impacts to external properties as a result of the development flows through the internal site system. The Stage 2 retail development is located over existing impervious areas and as such will not increase the sites percentage impervious or peak runoff volumes. It is note proposed to include any detention systems as part of the new retail. Excellence with Economy in Engineering 9 https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9900- 9999/9954/report/29-09-23 stormwater management plan_issue a.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.