Original source · versioned page text
Appendix D- SWMP
Very large file (13.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
29 September 2023
Table of Contents
EXECUTIVE SUMMARY 2
1 PURPOSE 5
1.1 Project Description 5
2 SITE CHARACTERISTICS 6
2.1 Site location 6
2.2 Topography and Existing Site Drainage 7
3 SITE DATA 7
4 STORMWATER 8
4.1 Flooding 8
4.2 Lawful Point of Discharge 8
4.3 Rainwater Reuse 8
4.4 Site Based Stormwater Management Plan 8
4.5 Operational Phase 8
4.6 Proposed Stormwater Quality Treatment Devices 15
4.7 Construction Phase (Sediment and Erosion Control) 16
5 CONCLUSION 19
6 LIMITATIONS OF REPORT 19
Excellence with Economy in Engineering 3
https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9900-
9999/9954/report/29-09-23 stormwater management plan_issue a.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.