Minor Change Report - MCU17 0568 02 & OPW17 0602 02 (As Published)
Assessment of Request
As indicated in the table above, the revised parking provision of 15 spaces (including 1
disables space) complies with both the current as superseded planning schemes.
Recommendation
It is recommended existing MCU condition 16. be amended to read as follows:
16. A minimum of 15 car spaces, including 1 disabled space must be provided on
site, in accordance with the approved plans
4. Bicycle and End of Trip Facilities
In terms of bicycle parking, lockers and shower cubicles the following condition was included
on the previous minor change approval:
17. a minimum of 9 bicycle parking spaces, 2 lockers and 1 shower cubicle must be
provided on site.
The current application reduces the GFA of the development to 708m2. Based on Table
9.4.1.4 - Minimum parking requirements including end of trip facilities the bicycle parking
requirements are:
• 1 space/100m2 GFA up to 500m2; and
• 1 space/500m2 GFA above 500m2.
Therefore, based on the GFA 6 bicycle spaces are required.
The plans provided for this minor change do not indicate the provision of end-of-trip facilities.
Therefore, this condition will be retained as follows but the requirement reduced to reflect the
smaller GFA.
Recommendation
It is recommended existing condition 17. be amended to read as follows:
17. a minimum of 6 bicycle parking spaces, 2 lockers and 1 shower cubicle must
be provided on site.
4. CONSULTATION
4.1. Referral Agencies
Not applicable
5. CONCLUSION & REASONS FOR DECISION
The proposed development generally complies with the requirements of the planning scheme and
does not raise any significant issues that cannot be addressed by reasonable and relevant
conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 83(9) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No. MCU17/0568.02 to make a minor change to an existing approval
for
• Development Permit for Material Change of Use – Industrial Type 2 (Production alteration
repackaging & repairing)
• Operational Works (Earthworks, Stormwater Drainage, Vehicle Crossovers, Parking, Erosion
& Sediment Control and Landscaping)
Page 8 of 9
Document Set ID: 24936711
Version: 4, Version Date: 29/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.