Earthworks Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: Sept 2020
Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
Effects of Works
Drainage AO1 RO1
PO1 Filled or excavated areas have a minimum Bulk earthworks will be designed to prevent
Finished surface levels ensure land is free gradient of 0.5% and drain to Council’s ponding on site and on neighbouring land.
draining. stormwater infrastructure where available, All stormwater surface runoff and subsoil
or where stormwater infrastructure is not flows will be directed to the lawful point of
available, toward the street. discharge. Refer NSC Water Quality and
Drainage Code.
Hydraulics No acceptable outcome provided. RO2
PO2 The existing drainage characteristics of the
Change to the levels on site do not have site and surrounding area has been
an adverse impact on the flooding and considered. The proposal ensures that
drainage characteristics off-site. surrounding properties and downstream
stormwater infrastructure and waterways
are not adversely impacted by the
proposed development.
Geotechnical considerations AO3.1 RO3.1
PO3 Filling works are undertaken in accordance All filling will be undertaken in accordance
Earthworks do not result in geotechnical with Council’s Planning Scheme Policy with Council’s PSP6 – Engineering Design
instability on-site or to nearby premises. PSP6 Engineering design standards - Standards – Roads and Drainage &
roads, drainage and earthworks. Earthworks. All excavation will be
undertaken with no adverse impact on
neighbouring properties or surrounding
infrastructure.
AO3.2 RO3.2
Where the filling is for residential, Refer to RO3.1.
commercial or industrial purposes the
works comply with Australian Standard -
Guidelines for earthworks on commercial &
residential development.
Local amenity AO4.1 RO4.1
PO4 The following measures are implemented – Water trucks shall be used to minimise
Undertaking earthworks does not (a) regular water spraying of exposed dust emissions. An ESC plan is to be
adversely impact on the amenity of the areas to suppress dust; prepared for the construction phase.
local area by way of dust, noise or visual (b) provision of dust stabilised or sealed
1
Solution: Acceptable Solution Page 1 of 4
A/S Alternative Solution D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\ESA\Working\Appendices\20169 - NSC Earthworks Code 2020.docx
N/A Not applicable to this proposal Job: 20169
Rev: 0
Site Address: 101-105 Eumundi Noosa Road, Noosaville 30/11/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.