Council archive · source document
Decision Notice MCU13-0261 and OPW13/1037 · MCU13/0261
Officer: Jack Lewis Direct Telephone: 07 5329 6236 Fax: 07 5329 6501 Our Reference: MCU13/0261 Your Reference: not provided 19 March 2014 Mr TC Stay C/- Murray Bell Planning Co. 2/57 Lamont Rd WILSTON QLD 4051 Dear Sir/Madam Decision Notice Sustainable Planning Act 2009 I refer to your application and advise that on 18 March 2014, Council decided to approve the application in full subject to conditions. Details of the decision are as follows: 1. APPLICATION DETAILS Application No: MCU13/0261 & OPW13/1037 Street Address: 5 Stevens St SUNSHINE BEACH QLD 4567 Real Property Description: Lot 731 RP 48111 Planning Scheme: The Noosa Plan (16 September 2013) 2. DECISION DETAILS The following type of approval has been issued: Development Permit for Material Change of Use for Multiple Housing Type 2 - Duplex (2 x 3 bedroom units) Development Permit for Operational Works (Stormwater, Drainage Works, Landscaping, Vehicle Crossover, Earthworks, Erosion & Sediment Control). 3. RELEVANT PERIOD OF APPROVAL The relevant period for the Material Change of Use is 4 years starting the day that this development approval takes effect. The relevant period for the Operational Works is 2 years starting the day that this development approval takes effect. 4. ASSESSMENT MANAGER CONDITIONS Material Change of Use for Multiple Housing Type 2 - Duplex (2 x 3 bed units) PLANNING When conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. Building Height The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground surface. Certification must be submitted to Council from a Licensed Surveyor which certifies that the buildings do not exceed the maximum height requirement of this Decision Notice. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with condition. Building Appearance All air conditioning units or other mechanical equipment must be located at ground level or otherwise fully enclosed or screen such that they are not visible from the street frontages nor adjoining properties. All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvers, glass panelling or the like. Fencing and Walls The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street. Clothes Drying Areas Each dwelling unit must be provided with access to an outdoor clothes line which is screened from public view. Community Management Statement Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment. Landscaping The development site must be landscaped prior to the commencement of use. The works must be undertaken in accordance the works shown on the Approved Plans, except where amended by these conditions. The existing Tuckeroo tree located at the rear boundary on the site must be retained and protected during the development works, where possible in accordance with AS 4970, Protection of trees on development sites. If the construction works results in unacceptable level of damage to the Tuckeroo, it must be replaced with a 200L Cupaniopsis anacardioides (Tuckeroo) in the rear of the site prior to the commencement of use. Adequate screening plantings must be provided to screen the majority of the pool wall associated with Unit 2. All vegetation to the front boundary setback area must be allowed to grow to provide vegetative screening of the articulated fence. All landscape works must be maintained generally in accordance with the approved design for the life of the development. All landscape works must be established and maintained in accordance with horticultural best practice with construction techniques that allow for healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form. ENGINEERING External Works Stevens Street must be upgraded for the length of its frontage to the subject site. The works must be undertaken in accordance with an Operational Works approval and must include in particular: construction of a 1.5m wide pedestrian footpath in accordance with the conditions of this Decision Notice. removal of the existing property access and reinstatement of the kerb, footpath and verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed. Site Access and Driveways A sealed access driveway must be provided from Stevens Street to all parking and manoeuvring areas of the development. The works must be undertaken generally in accordance with drawing numbers 23360-OW3 and 23360-OW4 prepared by SCG Consulting and must include in particular: a driveway crossover in accordance with IPWEAQ standard drawing SEQ R-050. grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any step or significant level difference. earthworks within the Stevens Street road reserve must be kept to a minimum. Car Parking A minimum of 3 car parking spaces must be provided on the site. The carparking and maneuvering areas must be generally in accordance with drawing number 23360-OW3 prepared by SCG Consulting and must include in particular: the carparking area must be constructed to comply with the provisions of AS/NZS 2890.1-2004 for user class 1A with allowance for vehicles to enter the site in a forward gear, access the space and leave the site in a forward gear in a total of 3 movements, a minimum head clearance (headroom) at any point of 2.2m All car parking areas and access driveways must be maintained exclusively for vehicle parking and maneuvering and kept in a tidy and safe condition at all times. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. All stormwater drainage must be collected and discharged so there is no net increase in stormwater runoff from the site. The stormwater drainage system must be constructed generally accordance with drawing number 23360-OW2 prepared by SCG Consulting dated Dec 2013 as amended herein. All site stormwater drainage must be by means of a gravity system. Electricity and Telecommunication Services Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Geotechnical Stability Earthworks carried out on site must not affect the structural integrity of any of the existing fences and/or buildings and/or structures and/or lands that border the development site. Fences that are affected must be replaced prior to the Building Certifier issuing the Certificate of Classification. The development must be carried out generally in accordance with the recommendations contained in Soil Test and Footing Report, Report No 23360 prepared by SCG Consulting dated 21 January 2014. The excavation of the site must be supervised by a Geotechnical Engineer or similar qualified expert. The Geotechnical Engineer or similar qualified expert must determine if any additional measures are required to protect the stability of adjoining buildings and/or structures and/or lands. Certification must be submitted to Council from a qualified person* which certifies that the development has been constructed in accordance with the recommendations contained in Soil Test and Footing Report, Report No 23360 prepared by SCG Consulting dated 21 January 2014 and will remain stable in the long term. *(Refer to advisory Note) Earthworks and Retaining Walls All fill and associated batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. Where the development involves excavation or filling over, or adjacent to, drainage, water supply or sewerage infrastructure, all access chamber surface levels must be adjusted to provide a freeboard of 100mm above the finished ground surface level. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Operational Works Stormwater, Drainage Works, Landscaping, Vehicle Crossover, Earthworks, Erosion & Sediment Control. Prior to the Commencement of Works Prior to requesting a prestart meeting the amended plans referred to in this approval must be submitted to and approved by Council. A prestart meeting must be organised with council’s delegate by calling 5329 6244 (giving at least five business days notice). The prestart meeting must be attended by the responsible persons for: Civil engineering works; Erosion and sediment control works; and Landscape works. A Construction Management Plan must be submitted to council prior to the prestart meeting and must specifically address the following: Traffic management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction. Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased. Proposed fencing to the site during the construction phase of the development. Adequate parking arrangements for construction workers. Maintenance and protection of water quality through the implementation of appropriate erosion and sediment control measures. Identification of complaint management procedures including contact details for the onsite manager. During Construction Where damage occurs to any council asset as a result of the development works, it must be repaired immediately where it creates a hazard that presents risk to person or property. Other damage must be repaired prior to completion of works. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works approval. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by council officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice All relevant council Planning Scheme Policies, standard drawings, standard specifications and guidelines. The latest version of Water Sensitive Urban Design Technical Design Guidelines for South East Queensland (Healthy Waterways) for all water quality devices to be constructed on site. Pavement Design Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ. Pathways All pathways must be constructed in accordance with the following requirements: All footpath/cycleway must comply with council’s Standard Drawing SEQ R-065. All paths must have a slip resistant surface. The required work includes any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard. Pathways must: Terminate in a manner that ensures smooth transition to existing surfaces for public safety. Be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS 1428, Design for access and mobility. Site Access and Driveways Any existing unnecessary or redundant property access must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100mm topsoil and grass seed or turf, and must be maintained by the developer until established. Earthworks A separate development permit for Operational Works must be granted for bulk earthworks prior to any works commencing, unless those works form part of approved building work on the land. A development permit for Operational Works must also be obtained for any site proposed to source fill for, or receive fill from, the development. The transport routes for the haulage of material between these two sites must be identified and approved by the Director of Infrastructure Services. All earthworks shall be undertaken in accordance with the provisions of AS 3798, Guidelines on earthworks for commercial and residential development. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (eg by blocking or interfering with natural overland flows). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3.2:1998. Erosion and Sediment Control. Prior to the completion of the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium- to long-term (refer to E&SC Advisory Note 1). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Following Construction Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works approval. Landscaping The trees identified for retention in the conditions of this Decision Notice must be maintained in good health. Planting of vine species within in the road reserve is not authorised due to trip hazard issues. Landscaping must be located in a position that will not adversely affect Council infrastructure or access to municipal infrastructure. Landscape works must not interfere with vehicle and pedestrian sight distances. Grassed areas must be: rolled, top dressed and joined smoothly with adjoining surfaces. of species sustainable for local and design conditions and do not require irrigation. free of disease, pest, weeds, rock and debris. New street tree planting must: meet NATSPEC Guidelines: Specifying Trees requirements for quality. be pruned in accordance with AS 4373, Pruning of Amenity Trees. be of the approved plan species. be pest and disease free. Prior to felling or pruning, all trees are to be checked for wildlife. If wildlife is present, the tree must not be felled or pruned until the wildlife has left the tree. Vegetation removal or pruning must be undertaken in an environmentally sensitive manner to avoid damaging surrounding vegetation, trees and habitat. Removed vegetation is to be processed by one of the following methods: Processing through a wood-chipper. Disposed of in a council approved refuse tip Used for landscaping purposes 5. REFERRAL AGENCIES Not Applicable. 6. APPROVED PLANS The following plans are Approved Plans for the development: Approved Plans Plan No. Rev. Plan Name Date WD.201 A Subfloor Plan prepared by Kidd+Co Designers 22/01/2014 WD.202 A Ground Floor Plan prepared by Kidd+Co Designers 22/01/2014 WD.203 A First Floor Plan prepared by Kidd+Co Designers 22/01/2014 WD.501 A Elevations prepared by Kidd+Co Designers 22/01/2014 WD.502 A Elevations prepared by Kidd+Co Designers 22/01/2014 WD.601 A Sections prepared by Kidd+Co Designers 22/01/2014 WD.602 A Sections prepared by Kidd+Co Designers 22/01/2014 WD.603 A Sections prepared by Kidd+Co Designers 22/01/2014 23360-OW4 Driveway Longitudinal Section, prepared by SCG Consulting Engineers December 2013 23360-OW3 Site Earthworks, prepared by SCG Consulting Engineers December 2013 131204 03 d Planting Plan prepared by Seed Landscape Design 12/02/14 131204 01 d Concept Plan prepared by Seed Landscape Design 07/02/14 131204 02 a Details prepared by Seed Landscape Design 12/02/14 Plans Requiring Amendment Plan No. Rev. Plan Name Date 23360-OW2 Site Drainage, prepared by SCG Consulting Engineers December 2013 Amendments The stormwater outlet from GP2 adjacent to the north eastern corner of the site must be discharged directly to the kerb and channel within the prolongation of the boundary line, provided that the discharge rate does not exceed 25l/sec. 7. REFERENCED DOCUMENTS Document No. Rev. Document Name Date 23360(S) Soil Test and Footing Report, prepared by SCG Consulting Engineers 21 January 2014 8. ADVISORY NOTES The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any obligations under the ACH Act. Infrastructure Charges This Development Permit will trigger an “Adopted Infrastructure Charge Notice” to be issued in accordance with Council’s “Adopted Infrastructure Charges Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the Sustainable Planning Act 2009. Qualified Person For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability for the development, a qualified person is considered to be a person who: is a Registered Professional Engineer of Queensland (RPEQ); and has a degree in civil engineering or engineering geology; and has a minimum of 5 years experience in the field of geotechnical engineering or engineering geology. Preparation of a Preliminary Construction Management Plan A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the conditions. General Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Erosion and Sediment Control As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the completion of the works: Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. 9. PROPERTY NOTES Not Applicable. 10. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable. 11. FURTHER DEVELOPMENT PERMITS REQUIRED Development Permit for Building Work 12. SELF ASSESSABLE CODES Not Applicable. 13. SUBMISSIONS Not Applicable. 14. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable. 15. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. 16. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. Yours faithfully Jack Lewis cc Unitywater Enc: Adopted Infrastructure Charge Notice Approved Plans/Documents Appeal Rights Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] Page 14 of 14 [word/footer2.xml] Page 1 of 14 [word/header1.xml] MCU13/0261 [Attachment: image4.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice MCU13-0261 and OPW13/1037Related documentApplication case desk ↗
Decision Notice MCU13-0261 and OPW13/1037Related documentApplication case desk ↗
About this file
- File size
- 160 KB (small file)
- File type
- DOCX
No other editions are linked here.