     STANDARD NOTES                                                                                                                                      ENVIRONMENTAL NOTES                                                                                                                     AS CONSTRUCTED INFORMATION
     1. GENERAL                                                                                                                                          VEGETATION PROTECTION                                                                                                                   AS-CONSTRUCTED INFORMATION INCLUDING ASSET REGISTERS IS A CRITICAL PART OF
         1.1.         NO WORK IS TO COMMENCE ON SITE UNTIL APPROVAL TO PROCEED HAS                                                                       1.     TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED
                                                                                                                                                                PRIOR TO CONSTRUCTION, OR REPLACED IF DESTROYED.                                                                                 AUTHORITY REQUIREMENTS FOR ASSET ACCEPTANCE:
                      BEEN GIVEN BY THE SUPERINTENDENT.
                                                                                                                                                         2.     WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD,
         1.2.         THE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE
                                                                                                                                                                GIRDLES SHALL BE CONSTRUCTED WITH 1.8m BATTENS CLOSELY                                                                           1. ALL ADAC PLANS, REDLINE MARKUPS OF DESIGN DRAWINGS, AUTHORITY ASSET REGISTERS, XML FILES, 12D XML REPORTS
                      SPECIFICATIONS AND STANDARD DRAWINGS LISTED. THE                                                                                          SPACED AND ARRANGED VERTICALLY FROM GROUND LEVEL.
                      SUPERINTENDENT WILL ON REQUEST RESOLVE ANY POINT OF CONFLICT.                                                                             GIRDLES SHALL BE STRAPPED TO TREES PRIOR TO CONSTRUCTIONS                                                                           AND ALL OTHER REQUIRED AUTHORITY REQUIRED AS-CONSTRUCTED INFORMATION IS TO BE SURVEYED, PREPARED AND
                      DIMENSIONS ARE NOT TO BE SCALED.                                                                                                          AND REMAIN UNTIL COMPLETION.                                                                                                        SIGNED BY A LICENSED SURVEYOR, ENGAGED BY THE CONTRACTOR.
         1.3.         WHERE A JUNCTION IS TO BE MADE TO EXISTING CONSTRUCTION THE                                                                        3.     TREE ROOTS SHALL BE TUNNELLED UNDER, RATHER THAN SEVERED.                                                                              a. BORNHORST + WARD IS NOT RESPONSIBLE FOR THE PREPARATION OF AS-CONSTRUCTED DOCUMENTS.
                      CONTRACTOR SHALL CONFIRM THE LOCATION AND LEVEL OF THIS                                                                                   IF ROOTS ARE SEVERED THE DAMAGED AREA SHOULD BE TREATED
                                                                                                                                                                                                                                                                                                       b. AS-CONSTRUCTED INFORMATION NOT SIGNED BY A LICENSED SURVEYOR WILL BE REJECTED.
                      CONSTRUCTION PRIOR TO COMMENCING WORK ON ANY CRITICAL                                                                                     WITH A SUITABLE FUNGICIDE. CONTACT THE LOCAL CITY COUNCIL
                                                                                                                                                                ARBORIST FOR FURTHER ADVICE.                                                                                                     2. COUNCIL SUBMISSION AND RPEQ SIGNATURES OF THE AS CONSTRUCTED INFORMATION WILL NOT BE COMPLETED UNTIL
                      SECTION. THE SUPERINTENDENT MAY VARY LEVELS AND GRADIENTS OF
                                                                                                                                                         4.     ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY                                                                                   A REVIEW OF THE INFORMATION HAS OCCURRED AND THE DOCUMENTS REQUIRE NO FURTHER REVISIONS ACCORDING
                      NEW WORKS TO ACHIEVE A SATISFACTORY CONNECTION.
                                                                                                                                                                APPROVED ARBORIST.                                                                                                                  TO THE CONSULTING ENGINEERS REVIEW.
         1.4.         ALL CONSTRUCTION WORK SHALL COMPLY WITH THE QUEENSLAND
                      WORKPLACE HEALTH AND SAFETY ACT. CONTACT YOUR NEAREST OFFICE                                                                                                                                                                                                               3. ALLOWANCE FOR A SINGLE ASSESSMENT OF THE AS CONSTRUCTED INFORMATION IS ALLOWED FOR BY BORNHORST +
                                                                                                                                                         SOIL
                      OF THE DIVISION OF WORKPLACE HEALTH AND SAFETY FOR                                                                                 1.     TOPSOIL AND SUBSOIL SHOULD BE STOCKPILED SEPARATELY.                                                                                WARD. FAILURE TO PROVIDE DOCUMENTS SUITABLE TO AUTHORITY STANDARDS (E.G. LESS THAN 5 MAJOR DEFECTS IN
                      INFORMATION. Ph: 1300 362 128                                                                                                      2.     CARE SHOULD BE TAKEN TO PREVENT SEDIMENT FROM ENTERING                                                                              THE SUPPLIED INFORMATION) WILL RESULT IN REJECTION OF THE DATA AND RE-ASSESSMENT FEES FROM BORNHORST +
         1.5.         THE CONTRACTOR SHALL TAKE ALL REASONABLE AND PRACTICAL                                                                                    THE STORMWATER SYSTEM. THIS MAY INVOLVE PLACING                                                                                     WARD WILL APPLY.
                      MEASURES TO PREVENT OR REDUCE HARM TO THE ENVIRONMENT AS SET                                                                              APPROPRIATE SEDIMENT CONTROLS AROUND STOCKPILES.
                                                                                                                                                         3.     ACID SULPHATE SOILS EXIST IN THE WORKS AREA. THE OUTPUTS                                                                         4. LOCAL AUTHORITY RE-SUBMISSION FEES ARE THE RESPONSIBILITY OF THE CONTRACTOR.
                      OUT IN THE ENVIRONMENTAL PROTECTION ACT.
         1.6.         PLEASE NOTE THAT INSPECTIONS BY BORNHORST + WARD ARE PERIODIC                                                                             FROM THE RISK ASSESSMENT BASED ON THE QUEENSLAND ACID
                                                                                                                                                                SULPHATE SOIL TECHNICAL MANUAL REQUIRES THAT ACID
                      SITE INSPECTIONS TO SATISFY OURSELVES THAT WE CAN CERTIFY THAT
                                                                                                                                                                SULPHATE SOILS BE MANAGED AS FOLLOWS:
                                                                                                                                                                                                                                                                                                 QA INFORMATION
                      WORK BEING CARRIED OUT IS GENERALLY IN ACCORDANCE WITH OUR                                                                                                                                                                                                                 1.  QA INFORMATION IS A CRITICAL PART OF THE FINAL CERTIFICATION REQUIREMENTS AND AUTHORITY REQUIREMENTS
                      DESIGN INTENT.
                                                                                                                                                         CREEK CROSSINGS                                                                                                                            FOR ASSET ACCEPTANCE.
                                                                                                                                                         1.     SILTATION CONTROL MEASURES SHALL BE PLACED DOWNSTREAM                                                                                  a. QA INFORMATION REQUIRED FOR ASSET ACCEPTANCE AND FINAL CERTIFICATION IS OUTLINED BY THE PROJECT
     2. SERVICES NOTES                                                                                                                                          OF ANY EXCAVATION WORK.
                                                                                                                                                                                                                                                                                                           SPECIFICATION, AND INCLUDES, BUT IS NOT LIMITED TO, MATERIAL AND PRODUCT SUPPLY CERTIFICATES,
         2.1.         LOCATION & PROTECTION                                                                                                              2.     APPROPRIATE SEDIMENT CONTROLS SHALL BE USED TO PREVENT
                      THE LOCATION OF SERVICES SHOWN ON THESE PLANS HAS BEEN                                                                                    SEDIMENT FROM ENTERING THE CREEK.                                                                                                          CERTIFICATES FOR CONSTRUCTION VERIFICATION TESTING COMPLETED ON SITE AND CCTV.
                      APPROXIMATED FROM KNOWN POSITIONS OF VALVES,                                                                                       3.     NO SOIL SHALL BE STOCKPILED WITHIN 5m OF THE CREEK.                                                                                    b. THE SCOPE OF THE QA INFORMATION REQUIRED IS AS PER THE PROJECT SPECIFICATION AND LOCAL AUTHORITY
                      INSPECTION/ACCESS CHAMBERS, ETC AND INFORMATION SUPPLIED BY                                                                                                                                                                                                                          REQUIREMENTS. THIS SHALL ALSO BE COMPLETED AT FREQUENCIES OUTLINED BY THE LOCAL AUTHORITY
                      SERVICES AUTHORITIES. DETAILS OF SERVICES ARE PROVIDED FOR
                                                                                                                                                         REHABILITATION                                                                                                                                    STANDARDS.
                                                                                                                                                         1.     PREDISTURBANCE SOIL PROFILES & COMPACTION LEVELS SHALL BE
                      INFORMATION ONLY AND NO RESPONSIBILITY IS TAKEN FOR THE                                                                                                                                                                                                                    2. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SINGLE CONSOLIDATED PACKAGE OF ALL QA INFORMATION
                                                                                                                                                                REINSTATED.
                      ACCURACY OR COMPLETENESS OF THE INFORMATION SUPPLIED. THE                                                                          2.     PREDISTURBANCE VEGETATION PATTERNS SHALL BE RESTORED.                                                                               NECESSARY TO ACHIEVE FINAL CERTIFICATION AND TO SATISFY LOCAL AUTHORITY REQUIREMENTS.
                      CONTRACTOR IS RESPONSIBLE FOR CONFIRMING THE LOCATION OF ALL                                                                                                                                                                                                               3. ALLOWANCE FOR A SINGLE ASSESSMENT OF THE QA INFORMATION IS ALLOWED FOR BY BORNHORST + WARD. FAILURE
                      SERVICES WITH THE RELEVANT AUTHORITIES PRIOR TO COMMENCING
                                                                                                                                                                                                                                                                                                    TO PROVIDE DOCUMENTS SUITABLE TO AUTHORITY STANDARDS (E.G. LESS THAN 5 MAJOR DEFECTS IN THE SUPPLIED
                      WORK AND PROVIDING ALL NECESSARY MEASURES TO PROTECT ALL
                      SERVICES DURING THE COURSE OF THE WORK.                                                                                                                                                                                                                                       INFORMATION) WILL RESULT IN REJECTION OF THE DATA AND RE-ASSESSMENT FEES FROM BORNHORST + WARD WILL
         2.2.         STRUCTURES TO BE MAINTAINED IN A STABLE CONDITION AND NO PART                                                                                                                                                                                                                 APPLY.
                      TO BE OVERSTRESSED DURING CONSTRUCTION.
         2.3.         AUTHORITY SERVICES CONFLICTS
                      SERVICE RELOCATIONS ARE SHOWN WHERE KNOWN. THE CONTRACTOR IS                                                                                ALL ENVIRONMENT PROTECTION MEASURES SHALL BE
                                                                                                                                                                                                                                                                                                 CIVIL ENGINEERING FINAL CERTIFICATION, PRACTICAL COMPLETION, LOCAL
                      TO LOCATE, AND IF NECESSARY, LEVEL ALL SERVICES IN THE AREA OF THE                                                                          IMPLEMENTED PRIOR TO ANY CONSTRUCTION WORK,                                                                                    AUTHORITY 'ON MAINTENANCE'
                      WORKS PRIOR TO CONSTRUCTION. THE SUPERINTENDENT IS TO BE                                                                                    INCLUDING CLEARING, COMMENCING.
                                                                                                                                                                                                                                                                                                 1. RPEQ COMPLETION CERTIFICATE FOR THE CIVIL WORKS AND/OR COUNCIL SUBMISSION APPLICATION FOR
                      ADVISED IMMEDIATELY OF ANY UNIDENTIFIED CONFLICTS.
                                                                                                                                                                                                                                                                                                    'ON-MAINTENANCE' WILL NOT BE PROCESSED BY THE CONSULTING ENGINEER UNTIL THE FOLLOWING HAS BEEN
         2.4.         TELECOMMUNICATION CABLE
                      NO WORK IS TO BE CARRIED OUT WITHIN 3.0m OF CABLE IN URBAN AREAS                                                                                                                                                                                                              PROVIDED:
                      AND 10.0m IN RURAL AREAS, WITHOUT FIRST CONSULTING THE RELEVANT                                                                                                                                                                                                                   a. ACCEPTABLE AS-CONSTRUCTED INFORMATION IN ACCORDANCE WITH THE ABOVE.
                      AUTHORITY. THE CONTRACTOR IS TO MANUALLY EXPOSE AND PROTECT                                                                                                                                                                                                                       b. ACCEPTABLE QA INFORMATION IN ACCORDANCE WITH THE ABOVE.
                      THE SERVICE WHEN EXCAVATING, OR WORKING, CLOSER TO                                                                                                                                                                                                                                c. ON-MAINTENANCE INSPECTIONS HAVE OCCURRED WITH BOTH THE CONSULTING ENGINEER AND LOCAL
                      TELECOMMUNICATION PLANT THAN THE ABOVE DISTANCES.                                                                                                                                                                                                                                     AUTHORITY, DEFECTS HAVE BEEN RECTIFIED AND ACCEPTED IN WRITING BY THE CONSULTING ENGINEER AND
                                                                                                                                                                                                                                                                                                            LOCAL AUTHORITY.
     3. TRAFFIC CONTROL                                                                                                                                                                                                                                                                                 d. QA INFORMATION HAS BEEN ACCEPTED IN WRITING BY THE LOCAL AUTHORITY.
         3.1.         TRAFFIC CONTROL IS TO BE IN ACCORDANCE WITH THE QUEENSLAND                                                                                                                                                                                                                 2. IN CASES WHERE A PROVISIONAL/UNCOMPLETED CERTIFICATE IS PROVIDED, THE UN-COMPLETED CIVIL WORKS,
                      TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (CURRENT                                                                                                                                                                                                                  ON-MAINTENANCE AND AUTHORITY ACCEPTANCE MUST BE COMPLETED WITHIN 3 MONTHS OF THE PROVISIONAL
                      ISSUE). IF REQUESTED BY THE SUPERINTENDENT THE CONTRACTOR IS
                                                                                                                                                                                                                                                                                                    CERTIFICATE, FAILURE TO COMPLETE WITHIN THIS TIME FRAME WILL SEE WORKS CARRIED OUT BY AN INDEPENDENT
                      REQUIRED TO PROVIDE FOR APPROVAL TRAFFIC MANAGEMENT PLANS
                      DETAILING THE TRAFFIC MOVEMENTS TO BE PROVIDED, THEIR STAGING,                                                                                                                                                                                                                CONTRACTOR AT THE CONTRACTORS EXPENSE.
                      AND THE SIGNAGE ADOPTED IN EACH STAGE.                                                                                                                                                                                                                                     3. THE MAINTENANCE PERIOD WILL BE BOUND TO THE WRITTEN ON-MAINTENANCE ACCEPTANCE LETTER DATES ISSUED BY
                                                                                                                                                                                                                                                                                                    THE LOCAL AUTHORITY AND NOT THE PC LETTER DATES. UNTIL SUCH TIME THAT THE AUTHORITY ISSUES THE WRITTEN
                                                                                                                                                                                                                                                                                                    ON-MAINTENANCE LETTER, THE SITE IS CONSIDERED A CONSTRUCTION ZONE, IS CONSIDERED NOT ACCEPTED FOR
                          CONTRACTOR SHALL COORDINATE WITH ELECTRICAL,                                                                                                                                                                                                                              MAINTENANCE BY THE AUTHORITY AND IS TO BE MANAGED BY THE CONTRACTOR, INCLUDING ALL PUBLIC INDEMNITY
                          COMMUNICATIONS, FIRE, HYDRAULIC SERVICES AND
                          LANDSCAPE CONSULTANT'S DRAWINGS FOR                                                                                                                                                                                                                                       LIABILITY. THIS COULD RESULT IN A LONGER THAN TYPICAL (12 MONTH) DEFECTS PERIOD IF THE CONTRACTOR FAILS TO
                          LOCATIONS OF PROPOSED OR RETAINED SERVICES.                                                                                                                                                                                                                               COMPLETE THE AS CONSTRUCTED INFORMATION, QA INFORMATION, DEFECTS AND GENERALLY REQUIRED COMPLETION
                          NO PAVING OR KERB IS TO BE PLACED UNTIL ALL                                                                                                                                                                                                                               DOCUMENTS IN A TIMELY MANNER.
                          SERVICES UNDER HAVE BEEN PLACED AND TESTED.                                                                                                                                                                                                                            4. OFF-MAINTENANCE NOTES:
                                                                                                                                                                                                                                                                                                        a. 'OFF MAINTENANCE' WILL BE GRANTED BY THE LOCAL AUTHORITY, FOLLOWING COMPLETION OF THE
                                                                                                                                                                                                                                                                                                            MAINTENANCE PERIOD AND RECTIFICATION OF ALL DEFECTS. AT THE EARLIEST, 'OFF-MAINTENANCE'
                                                                                                                                                                                                                                                                                                            ACCEPTANCE WILL OCCUR AT THE DATES INDICATED BY THE LOCAL AUTHORITY 'ON-MAINTENANCE' ACCEPTANCE
                                                                                                                                                                                                                                                                                                            LETTER (IRRELEVANT OF THE PC DATES). THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE
                                                                                                                                                                                                                                                                                                            ASSET UNTIL THIS TIME.
                                                                                                                                                                                                                                                                                                        b. PRIOR TO THE LOCAL AUTHORITY INSPECTION, THE CONSULTING ENGINEER AND CONTRACTOR SHALL INSPECT
                                                                                                                                                                                                                                                                                                            THE SITE TO IDENTIFY ANY DEFECTS THAT HAVE OCCURRED THROUGHOUT THE MAINTENANCE PERIOD.
                                                                                                                                                                                                                                                                                                        c. THE OFF-MAINTENANCE INSPECTION CAN ONLY BE BOOKED ONCE THE CONTRACTOR HAS RECTIFIED ALL DEFECTS,
                                                                                                                                                                                                                                                                                                            SUPPLIED ALL AUTHORITY REQUIRED SUBMISSIONS (E.G. CCTV) AND THE SITE IS DEEMED READY FOR SUCH AN
                                                                                                                                                                                                                                                                                                            INSPECTION (E.G. IS THE SITE WELL MAINTAINED ETC).




                       PROJECT SETOUT
                       1.      ALL PROJECT SETOUT (HORIZONTAL AND VERTICAL) IS TO BE
                               UNDERTAKEN BY THE CONTRACTOR FROM A DIGITAL SURFACE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              THIS DRAWING IS BEST
                               MODEL (12D OR 3D-DWG) PROVIDED BY BORNHORST & WARD,                                                                                                                                                                                                                                                                                                                                                                                           VIEWED IN COLOUR AND
                               RELATIVE TO PERMANENT SURVEY MARKS OR OTHER SURVEY                                                                                                                                                                                                                                                                                                                                                                                           ON AN ELECTRONIC DEVICE




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              J:\2023\23169\05_DRAWINGS\DRG\C0003.DWG
                               CONTROL PROVIDED BY THE PRINCIPAL. THE CONTRACTOR IS TO
                               ALERT THE SUPERINTENDENT IF SUITABLE CONTROL IS NOT
                               AVAILABLE.                                                                                                                                                                                                                                                                                                                                                                                                                                     IT IS THE CONTRACTORS RESPONSIBILITY
                       2.      CONTRACTOR IS TO CONFIRM TIE-IN LEVELS TO EXISTING                                                                                                                                                                                                                                                                                                                                                                                                 TO UNDERTAKE A DBYD PRIOR TO
                               FEATURES PRIOR TO CONSTRUCTION                                                                                                                                                                                                                                                                                                                                                                                                                  COMMENCEMENT OF CONSTRUCTION.
                       3.      SURFACE LEVELS OF STORMWATER & SEWER MANHOLES AND                                                                                                                                                                                                                                                                                                                                                                                             VISIT: WWW.DIALBEFOREYOUDIG.COM.AU
                               OTHER SERVICE PITS ARE TO SUIT THE FINISHED SURFACE (LEVEL                                                                                                                                                                                                                                                                                                                                                                                       DIAL: 1100 BETWEEN 8AM AND 5PM
                               AND GRADIENT), WHICH MAY BE SLIGHTLY DIFFERENT TO ANY
                               CENTER OF STRUCTURE LEVELS PROVIDED.                                                                                                                                                                                                                                                                                                                                                                                           STATUS


                                                                                                                                                                                                                                                                                                                                                                                                                                                                 FOR APPROVAL
                                                                                                                                                                                               DWN       DES       CHK       APP                                                                                                                                                        CLIENT                   PROJECT                  SUBJECT                                            PROJECT No.
    SCAN QR CODE TO
                                                                                     REV         DATE         DESCRIPTION
                                                                                                                                                                                                                                        ASSOCIATED CONSULTANTS                                          APPROVED                CHECKED




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              11/04/2025 3:40:27 PM
                                                                                       C      10.04.25         ISSUE FOR OPERATIONAL WORKS APPROVAL                                            AR       KHN        SG       NR                                                                                                                                                          QUEENSLAND VENUE         120 POINCIANA AVE,       STANDARD NOTES                                      23169
    CONFIRM CURRENT                                                                    B      04.02.25         IFC PART 1                                                                      AR       KHN        SG       NR
                                                                                                                                                                                                                                                                                                                                                                                        COMPANY PTY LTD          TEWANTIN, QLD                                                               DRAWING No.        REVISION
    DRAWING REVISION                                                                   A      17.10.24         ISSUE FOR CO-ORDINATION                                                         AR       KHN        SG
    http://docs.bornhorstward.com.au/revision/                                                                                                                                                                                                                                                                                                                                          ----                     ----                                                                        C0003                  C
                                                                                                                                                                                                                                                                                                      DATE 11/04/25           DATE 11/04/25
COPYRIGHT © - This document is and shall remain the property of Bornhorst & Ward Pty. Ltd. The document may only be used for the purpose for which it was commissioned and in accordance with the terms of engagement. Unauthorised use of this document in any form whatsoever is prohibited.
                                                                                                                                                                                                                                                                                                                                                                                                                                      0       10    20   30     40     50                      100         ORIGINAL SIZE A1
Log in to download the original file

Combined_Civil_Drawings_-_Royal_Mail_Hotel.pdf · 13.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.