Original source · versioned page text
Response to infor request
Driveway Construction: We note Condition 18 of the REC Approval in relation to driveway construction. The owners intend to follow Cardno Plan 242001-001 Roadworks Plan and Longitudinal Section & 242001- 002 Driveway Cross Sections both dated 23-3-2012 with minor amendments as follows. We propose the following surface treatments to reduce construction costs and comply with the intent of REC Condition 18: Construct the driveway from CH15-122.9 (steepest section>12%) with: i. 125mm thick N32 concrete with SL72 mesh (provide 75mm minimum sub-base pavement under concrete if subgrade CBR value=<6) at 3m width with 0.5m shoulder on low side (3.5m total width) The remaining section at CHO-15 will be 150mm thick gravel (to match existing driveway construction, distance to nearest house is >40m). We consider that the proposed house site and driveway comply with the intent of Reconfiguration Approval REC2008/750 and sufficient information has been provided for Council to approve the Operational Works. Yours faithfully, Callaghan & Toth 2 ge eG Civil RPEQ MIEAust CPEng Please view www.callaghanandtoth.com.au for all information on our company profile and terms and conditions for services rendered X:OBSICT Projects in progress\1314 driveway & passing bays\Correspondence\Response to infor request.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.