Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                      NOT FOR CONSTRUCTION                                                                                                                                                                                                                                                                                                                                                                                                         EARTHWORKS NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   1.      THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           SERVICES PRIOR TO COMMENCEMENT OF WORK. ALL EXISTING SERVICES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           AND STRUCTURES ARE TO BE MAINTAINED IN GOOD ORDER FOR THE




                                                                                                           BOUNDARY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           DURATION OF THE CONTRACT. ANY COSTS ASSOCIATED WITH REPAIRING




                                                                                               PROPERTY
                                                                                                                                                                        FIRST FLOOR RL 14.500                                                                                                                                                                                                                                                                              DAMAGE TO EXISTING SERVICES SHALL BE PAID FOR BY THE CONTRACTOR.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   2.      THE CONTRACTOR SHALL VERIFY BENCH MARK LEVELS AND ADVISE THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           SUPERINTENDENT OF ANY DISCREPANCY BEFORE COMMENCEMENT OF
                                                                                                                                          DESIGN SUIRFACE                                                                                                                                                                                                                                                                                                                  CONSTRUCTION.
                                          RENE STREET                                                                                                                                                                                                                                                                                                                                                                                                              3.      ALL LEVELS ARE TO A.H.D.
                                                                                                                                             CARPARK
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   4.      THE SITE OF THE PROPOSED WORKS SHALL BE CLEARED OF ALL
                                                                                                                                                                         GROUND FLOOR RL 11.500                                                                                                                                                                                                                                                                            UNDESIRABLE MATTER. THIS SHALL INCLUDE DEAD TIMBER, GRASS, OLD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           FOUNDATIONS, CONCRETE, REDUNDANT MASONRY REMAINS, GARBAGE,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           DEBRIS, AND ALL OTHER OBSTRUCTIONS TO THE WORKS. HOLES LEFT BY




                                                                                                                                                                                                                                                                                                                                                                                                                                 BOUNDARY
                                                                                                                                                                                                                                                                                                                                                                                                                      PROPERTY
                                                                                                                                                                                      EXISTING SURFACE                                                                                                                                                                                                                                                                     THE REMOVAL OF ANY OF THE ABOVE SHALL BE FILLED WITH APPROVED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           COMPACTED MATERIAL WITH PROPERTIES AT LEAST SIMILAR TO INSITU


                                                                                                                       1in
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           SOILS.

                                                                                                                          0.8
                                                                                                                             2
                                                                                                                                                                                                                                                                                                                                                                                                 REAR DRIVEWAY                              0.250                  5.      CLEARED MATERIAL AND EARTHWORKS SPOIL SHALL BE REMOVED FROM
                                                                                                                                                                         BASEMENT RL 8.050                                                                                                                                                                                                                                                                                 THE SITE.
                                                             EARTHWORKS TEMPORARY                                                                                                                                                                                                                                                                                                                                                                                  6.      THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY ALL
                                                             BATTER. CONTRACTOR TO                                                                                                                                                                                                                                                                                                                                                                                         EARTHWORKS AND CLEARING OPERATIONS.
                                                             SEEK GEOTECHNICAL                                                                                                                                                                                                                                                                                                                                                                                     7.      SITE EARTHWORKS GENERALLY, SHALL BE CARRIED OUT IN ACCORDANCE
                                                             ENGINEER FOR ADVICE (TYP.)                                          EARTHWORKS LEVEL                                                                                                                                                                                                                                                                                                                          WITH AUSTRALIAN STANDARD AS 3798, GUIDELINES ON EARTHWORKS FOR
                                                             POSSIBLE SHORING REQUIRED.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           COMMERCIAL AND RESIDENTIAL DEVELOPMENTS, UNLESS NOTED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           OTHERWISE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   8.      TOPSOIL WHERE ENCOUNTERED SHALL BE STRIPPED AND STOCKPILED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           PRIOR TO THE COMMENCEMENT OF ANY EARTHWORKS OPERATION. THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           LOCATION OF THE STOCKPILE ON SITE SHALL BE AS DIRECTED BY THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           SUPERINTENDENT.
                                                                                                                                                                                                                                                        SECTION                       A                                                                                                                                                                            9.      IF DURING EARTHWORKS OPERATIONS UNSUITABLE SUBGRADE MATERIAL
                                                                                                                                                                                                                                                         SCALE 1:100                                                                                                                                                                                                       IS ENCOUNTERED,THEN PRIOR TO ANY FILLING OPERATION THIS MATERIAL
                                                                                                                                                                                                                                                                                    CE11                                                                                                                                                                                   SHALL BE REMOVED AND REPLACED AS DIRECTED BY THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           SUPERINTENDENT WITH AN APPROVED SUITABLE MATERIAL.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   10.     FILL MATERIAL SHALL BE COMPACTED TO THE FOLLOWING STANDARD,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           WHERE DRY DENSITY RATIO IS DETERMINED IN ACCORDANCE WITH AS 1289
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           USING STANDARD COMPACTION METHODS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   -       100% DRY DENSITY RATIO IN COHESIVE MATERIAL OR 80% IN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           COHESIONLESS MATERIAL FOR ROAD SUBGRADE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   -       95% DRY DENSITY RATIO IN COHESIVE MATERIAL OR 65% IN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           COHESIONLESS MATERIAL FOR ALL AREAS OTHER THAN THE ROADWAY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           AND BUILDING PADS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   -       98% DRY DENSITY RATIO IN COHESIVE MATERIAL OR 70% IN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           COHESIONLESS MATERIAL FOR BUILDING PADS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   11.     THROUGHOUT THE EARTHWORKS OPERATION THE CONTRACTOR IS TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           ENSURE THAT THE SITE IS SELF DRAINING. DAMAGE RESULTING FROM THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           EXPOSURE SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   12.     FOR ANY TEMPORARY EARTHWORK BATTERS, APPROPRIATE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           STABILISATION, SLOPE AND LOCATION ONSITE IS TO BE SPECIFIED BY A
                                                                                                                                     FIRST FLOOR RL 14.500                                                                                                                                                                                                                                                                                                                 SUITABILITY QUALIFIED GEOTECHNICAL ENGINEER. WORKS SHALL NOT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           PROCEED UNTIL ALL REQUIRED INFORMATION HAS BEEN RECEIVED FOR THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           CONTRACTOR.
                                                 LOT 58
                                                                                   DESIGN SUIRFACE




                                                                                                                                                                                                                                                                                                                                    BOUNDARY
                                                                                                                                                                                                                                                                                                                         PROPERTY
                                                   ON
                                                                                                                                     GROUND FLOOR RL 11.500
                                                                                    BOUNDARY
                                                                        PROPERTY




                                                RP228905
                                                                                                                                                                                                                                                                                                                                               PROPOSED SWALE EAST. REFER TO
                                                                                                                                                                                                                                                                                                                                               DETAIL ON DRAWING S10979-CE12.
                                                                                                                                                                                                                       EXISTING SURFACE                                                                                                                                                                                                                                 STRUCTURAL NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ALL WALLS TO BE CONSTRUCTED AS SPECIFIED BY STRUCTURAL ENGINEER.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        STABILITY OF ALL EXISTING ADJACENT RETAINING WALLS AND STRUCTURES TO




                                                                                                                                                                                                                                                                                                                             .43
                                                                                                                                     BASEMENT RL 8.050                                                                                                                                                                                                                                                                                                                  BE ASSESSED BY A STRUCTURAL ENGINEER PRIOR TO COMMENCEMENT OF WORKS.
                                                                                                                      1in2




                                                                                                                                                                                                                                                                                                                         1in0
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        PROPOSED RETAINING WALL CONSTRUCTION METHODOLOGY, INCLUDING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        STABILIZATION OF EXISTING RETAINING WALLS AND STRUCTURES, TO BE
                                                                                                                                                                      EARTHWORKS LEVEL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        PROVIDED IN ACCORDANCE WITH STRUCTURAL ENGINEERS ADVICE.
                                                                                                          PROPOSED SWALE WEST.                                        (NO ALLOWANCE FOR PAD FOOTINGS)
                                                                                                          REFER TO DETAIL ON                                                                                                                                                                                                                   EARTHWORKS TEMPORARY BATTER.
                                                                                                          DRAWING S10979-CE12.                                                                                                                                                                                                                 CONTRACTOR TO SEEK GEOTECHNICAL
                                                                                                                                                                                                                                                                                                                                               ENGINEER FOR ADVICE (TYP.)                                                                                               DEMOLITION NOTE:
                                                                                                                                                                                                                                                                                                                                               POSSIBLE SHORING REQUIRED.                                                                                               THE PERSON RESPONSIBLE FOR THE DEMOLITION WORKS SHALL ENSURE THAT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ALL VEHICLES LEAVING THE SITE CARRYING DEMOLITION MATERIALS HAVE THEIR

                                                                                                                                                                                                                                                        SECTION                       B                                                                                                                                                                                 LOADS COVERED AND DO NOT TRACK SOIL OR WASTE MATERIALS ONTO THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ROAD.
                                                                                                                                                                                                                                                         SCALE 1:100
                                                                                                                                                                                                                                                                                    CE11                                                                                                                                                                                ASBESTOS REMOVAL NOTE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        SHOULD ASBESTOS BE PRESENT, ITS REMOVAL SHALL BE CARRIED OUT IN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ACCORDANCE WITH THE NATIONAL OH&S COMMITTEE - CODE OF PRACTICE FOR
                                                                                                                                                                                                                              EARTHWORKS DESIGN ASSUMPTIONS:                                                                                                                                                                                                            SAFE REMOVAL OF ASBESTOS AND ITS CODE OF PRACTICE FOR THE MANAGEMENT
                                                                                                                                                                                                                              EARTHWORKS DESIGN BASED ON THE FOLLOWING ASSUMPTIONS                                                                                                                                                                                      AND CONTROL OF ASBESTOS IN THE WORKPLACE.
                                                                                                                                                                                                                                (1) 180mm BUILDING SLAB THICKNESS (130mm SLAB AND 50mm SAND BEDDING).
                                                                                                                                                                                                                                (2) ALLOWANCE FOR 150mm COMPACTED CLASS 1 GRANULAR MATERIAL UNDER
                                                                                                                                                                                                                                    BASEMENT SLAB.                                                        LEGEND                                                                                                                                                        WORKPLACE HEALTH AND SAFETY NOTE:
                                                                                                                                                                                                                                (3) 480mm DRIVEWAY SLAB THICKNESS (INCLUDING SUBGRADE COMPACTION DEPTH)                                                                EROSION & SEDIMENT CONTROL                                                                       ALL WORKS UNDERTAKEN BY THE CONTRACTOR SHALL COMPLY WITH THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        REQUIREMENTS OF THE QUEENSLAND WORK HEALTH AND SAFETY ACT 2011.
                                                                                                                                                                                                                                (4) NO ALLOWANCE FOR STRIPPING OR REMOVAL OF EXISTING PAVEMENT AND
                                                                                                                                                                                                                                    STRUCTURES TO EARTH LEVEL.                                                      EXISTING SURFACE LEVEL                             TRENCHING OPERATIONS:                                                                            CONTACT THE NEAREST OFFICE OF THE DIVISION OF WORKPLACE HEALTH AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        SAFETY FOR INFORMATION. PHONE No. 1300 362 128.
                                                                                                                                                                                                                                (5) NO ALLOWANCE FOR PAD FOOTINGS.
                                                                                                                                                                                                                                                                                                                                                                       THE CONTRACTOR SHALL FOLLOW THE PROCEDURES BELOW TO MINIMISE
                                                                                                                                                                                                                                                                                                                    PROPOSED SURFACE LEVEL
                                                                                                                                                                                                                                                                                                                                                                       SCOURING OF TRENCHES DURING RAINFALL EVENTS THAT OCCUR THROUGH THE
                                                                                                                                                                                                                                                                                                                                                                       CONSTRUCTION PHASE.                                                                              DIAL BEFORE YOU DIG:
                                                                                                                                                                                                                                        SITE STRIP = N/A                                                            PROPOSED EARTHWORKS LEVEL                           1.   OPEN ONLY AS MUCH GROUND AS REQUIRED TO UNDERTAKE THE WORK AT                              IT IS THE CONTRACTORS RESPONSIBILITY TO CONTACT 'DIAL BEFORE YOU DIG'
                                                                                                                                                                                                                                                                                                                                                                             HAND.                                                                                      PH.1100 FOR THE LOCATION OF EXISTING PUBLIC UTILITIES PRIOR TO EXCAVATION.
                                                                                                                                                                                                                                                                                                                    PROPOSED TEMPORARY                                  2. WHEREVER POSSIBLE CONSTRUCT LINES FROM UPSTREAM TO                                           ANY DAMAGE CAUSED TO EXISTING PUBLIC UTILITIES BY THE CONTRACTOR WILL
                                                       -                                                                                                                                                                                SITE CUT = 2037m³                                                           EARTHWORKS BATTER                                        DOWNSTREAM.                                                                                BE REPAIRED BY THE RELEVANT AUTHORITY AT THE CONTRACTOR'S EXPENSE.
                                                                                                                                                                                                                                                                                                                                                                        3. PLACE BEDDING MATERIAL AS SOON AS PRACTICAL AFTER OPENING
                                                                                                                                                                                                                                                                                                                                                                             TRENCH.
                                                NOOSA COUNCIL                                                                                                                                                                           SITE FILL = 32 m³                                                           PROPOSED FILL                                       4. CLOSE TRENCH AS SOON AS PRACTICABLE AFTER LAYING PIPE.
                                                                                                                                                                                                                                                                                                                                                                        5. INSTALL FILTER ROLLS IN TRENCHES AT 10m CENTRES WHENEVER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        EXISTING SERVICES NOTE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        THIS DESIGN HAS BEEN PREPARED BASED ON SERVICE AUTHORITY AS
                                               APPROVED PLAN                                                                                                                                                                            NET EXPORT = 2005 m³
                                                                                                                                                                                                                                                                                                                                                                             TRENCHES ARE PROPOSED TO BE LEFT OPEN AND UNATTENDED eg.
                                                                                                                                                                                                                                                                                                                                                                             OVERNIGHT.                                                                                 CONSTRUCTED INFORMATION. NO POT HOLING HAS BEEN UNDERTAKEN TO VERIFY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        EXISTING SERVICE LOCATIONS AND DEPTHS. IT IS THE CONTRACTORS
                                             OPW21/0103 13 JUL 2021                                                                                                                                                                                                                                                 PROPOSED CUT                                                                                                                                        RESPONSIBILITY TO UNDERTAKEN POT HOLING TO VERIFY THE DESIGN.
                                                                                                                                                                                                                            APPROXIMATE EARTHWORKS QUANTITIES
                                                                                                                                                                                                                                                                                                                                                                                0          1           2         3m                                 0          2               4           6m
                                                                                                                                                                                                                      (APPROXIMATE SOLID CUT/FILL VOLUMES. EXCLUDES TRENCH, FOOTING AND/OR                                                                                                                                                                                                         REAL PROPERTY DESCRIPTION
                                                                                                                                                                                                                                                                                                                                                              SCALE 1:50 (A1)                                           SCALE 1:100 (A1)
                                                                                                                                                                                                                   RETAINING WALL SPOIL). (NOT TO BE USED FOR TENDERING PURPOSES. TENDERER MUST                                                                                                                                                                                                    LOT 59 ON RP228906




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     © MILANOVIC NEALE CONSULTING ENGINEERS
                                                                                                                                                                                                                                                                                                                                                                                (SCALE BEFORE REDUCTION)                                            (SCALE BEFORE REDUCTION)
                                                                                                                                                                                                                       SATISFY THEMSELVES OF EARTHWORKS VOLUMES BASED ON DESIGN LEVELS).
ALL SCALES ARE AS SHOWN (A1)
DO NOT SCALE FROM DRAWING




                               REV.                       DESCRIPTION                                             DATE            INIT.                                                                                                     CONTACT DETAILS            CLIENT                                      PROJECT                                                                            TITLE                                                                                     DRAWN             DESIGNED           DATE
                                A     FOR CLIENT REVIEW                                                          23.02.21          SM                                                                                                       E [email protected]                                                                                                                                                                                                                                          SM               SM              FEB 2021
                                B     FOR APPROVAL                                                               09.04.21          SM                                                                                                       W www.mnce.com.au
                                C     COUNCIL RFI                                                                31.05.21          SM
                                D     COUNCIL RFI RE-ISSUE                                                       25.06.21          SM                                                                                                                                                                                   STORE LOCAL - NOOSAVILLE                                                                                                                                                CHECKED           APPROVED

                                                                                                                                                                                                                                                                                   STORELOCAL PTY LTD                                                                                                      BULK EARTHWORKS SECTIONS                                                                     DH

                                                                                                                                             BRISBANE                IPSWICH
                                                                                                                                                                                                                                                                                                                                STAGE 3                                                                                                                                                         DRAWING No.                                 REV.
                                                                                                                                                                                             SYDNEY                   GOLD COAST
                                                                                                                                             PH No. (07) 3255 1877   PH No. (07) 3281 6603   PH No. 1300 827 901      PH No. 1300 827 901                                                                                                                                                                                                                                                         S12884 - CE12                                D
Log in to download the original file

Approved Plans - OPW21_0103.pdf · 5.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.