Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Approved Plans - OPW21/0103

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                    FOR CONTINUATION REFER TO CR01
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         EROSION & SEDIMENT CONTROL




                                                                                                                                                                                            | Y
                                                                                                                         > SW >




                                                                                                                                                                                                                                                                                                                                                                                                                    >
                                                                                                                                                                                                                                                                                                                                                                                                                                Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         GENERAL NOTES:




                                                                                                                                                                                    | Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                                                |




                                                                                                                                                                                                                                                                                                                                                                                                                                                     W
                                                                                                                                                                                                                                                                                                                                                                                                                                Y




                                                                                                                                                                                                                                                                                                                                                                                                                                                                 7
                                                                                                       S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         1.   THE SEQUENCE OF OPERATIONS SHALL BE AS FOLLOWS:




                                                                                                                                                                                                                                                                                                                                                                                                                                |
                                                                                                                                                                                                                                                                                                                                                                                                                            8.5
                                                                                                                                                                                                                                                                                                                                                                                                                            Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            a. DELINEATION OF BUFFER AREAS AND DRAINAGE RESERVES, ERECTION OF




                                                                                                                                                                                                                                                                                                                                                                                                            S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      8.50




                                                                                                                                                                            | Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                                    >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                BARRICADE FENCING.




                                                                                                                                                                                                                                                                                                                                                                                                                                |
                                                                                                                                                                                                                                                                                                                                                                                                                                Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            b. LOCATION OF TOPSOIL STOCKPILES AND ERECTION OF DOWNHILL SILT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                FENCE.




                                                                                                                                                                                                                                                                                                                                                                                                                                |




                                                                                                                                                                                                                                                                                                                                                                                                                                                     W
                                                                                                   S




                                                                                                                                                                                                                                                                                                                                                                                                                                Y
                                                                                                                     SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            c. CONSTRUCTION OF DIVERSION WORKS NECESSARY TO MINIMISE RUNOFF




                                                                                                                                                                    | Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                                                |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                FROM ENTERING THE SITE.




                                                                                                                        >




                                                                                                                                                                                                                                                                                                                                                                                                                                Y
                                                                                                                                                                                                                                                                                                                                                                                                                    >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            d. CONSTRUCTION OF TEMPORARY EROSION AND SEDIMENT CONTROL
                                                      PROPOSED SWALE TO ACT AS




                                                                                                                                                                                                                                                                                                                                                                                                                                |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                MEASURES (eg. SILT FENCES).




                                                                                                                                                                                                                                                                                                                                                                                                            S



                                                                                                                                                                                                                                                                                                                                                                                                                                Y
                                                      DIVERSION DRAIN DURING                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                e. LAND CLEARING AND TOPSOIL STRIPPING.




                                                                                                                                                            | Y | Y
                                                      CONSTRUCTION.




                                                                                                                                                                                                                                                                                                                                                                                                                                                     W
                                                                                                                                                                                                                                                                                                                                                                                                                                |
                                                                                               S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          PROPOSED SWALE TO ACT AS                                                                          f. CONSTRUCTION OF STORMWATER DRAINAGE FACILITIES.




                                                                                                                                                                                                                                                                                                                                                                                                                                Y
                                                                                                                      SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          DIVERSION DRAIN DURING                                                                            g. LAND SHAPING.




                                                                                                                                                                                                                                                                                                                                                                                                                                |
                                                                                                                    >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            h. CONSTRUCTION OF ROADS AND ACCESSWAYS,




                                                                                                                                                                                                                                                                                                                                                                                                                    >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     8.25 CONSTRUCTION.




                                                                                                                                                                                                                                                                                                                                                                                                                                Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                INSTALLATION OF SERVICES.




                                                                                                                                                    | Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                                                |




                                                                                                                                                                                                                                                                                                                                                                                                                                                                 8
                                                                                                                                     8.0
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            i. FINAL REHABILITATION AND LANDSCAPING.




                                                                                                                                                                                                                                                                                                                                                                                                                                Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            j. MAINTENANCE.




                                                                                                                                                                                                                                                                                                                                                                                                                                                     W
                                                                                                                                                                                                                                                                                                                                                                                                                                |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         2. ALL SILT FENCES ARE TO BE INSTALLED PARALLEL TO CONTOURS UNLESS




                                                                                                                                                                                                                                                                                                                                                                                                            S



                                                                                                                                                                                                                                                                                                                                                                                                                                Y
                                                                                                                >   SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              SHOWN OTHERWISE.




                                                                                                                                              Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                                    >8
                                                                                                                                                                                                                                                                                                                                                                                                                                |
                                                                                           S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         3. SILT FENCES ARE TO BE INSTALLED DOWNHILL AND DIVERSION BANKS




                                                                                                                                                                                                                                                                                                                                                                                                                            Y.0 |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     8.00
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              UPHILL OF TOPSOIL STOCKPILES.




                                                                                                                                                                                                                                                                                                                                                                                                                                  Y
                                          SILT FENCE, REFER TO                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           4. TOPSOIL STOCKPILES ARE TO BE MULCHED OR TEMPORARILY VEGETATED IF




                                                                                                                                                                                   |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       8.25




                                                                                                                                                                                                                                                                                                                                                                                                                                                     W
                                                                                                                                                                                     Y
                                          S12884-CE03 FOR DETAILS.




                                                                                                                                                                                                                                                                                                                                                                                                                            |
                                                                                                                                                                                                          MATERIAL STOCKPILE, LOCATION AND                                                                                                                                                                                                                                                                                                                                    THEY ARE TO REMAIN FOR MORE THAN 30 DAYS.




                                                                                                                                                                                                                                                                                                                                                                                                                        Y
                                                                                                                >

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         5. MOVEMENT OF CONSTRUCTION EQUIPMENT SHALL BE LIMITED TO THE AREA




                                                                                                                                                                                      |
                                                                                                                                                                                                          SIZE TO BE CONFIRMED ON SITE AT




                                                                                                                                                                                                                                                                                                                                                                                                                    >Y
                                                                                                                                                                                              | Y




                                                                                                                                                                                                                                                                                                                                                                                                                        |
                                                                                                                                                                                                          EACH STAGE OF CONSTRUCTION.                                                                                                                                                                                                                                                                                                                                         OF WORK AND EXISTING ROADS.
                                                                                         S




                                                                                                                                                                                                                                                                                                                                                                                                            S
                                                                                                                                                                                                          REFER TO S12884-CE02 FOR DETAILS.                                                                                                                                                                                                                                                                                                                              6. DISTURBED AREAS ARE TO BE GRASSED FOLLOWING FINAL TRIMMING, AREAS
                                                                                                                                                                                                                                                                                                                                      SILT FENCE, REFER TO




                                                                                                                                                                                        Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                                        |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ARE TO BE DISTURBED AND RESTORED PROGRESSIVELY.
                                                                                                                                                                                                                                                                                                                                      S12884-CE03 FOR DETAILS.




                                                                                                                                                                                                                                                                                                                                                                                                                    Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         7. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSPECTED
                                                                                                                         7.5




                                                                                                                                                                                                                                                                                                                                                                                                                                                     W
                                                                                                                                                                                                                                                                                                                                                                                                                        |
                                                                                                           SW




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              AND RE-INSPECTED AT THE END OF EACH DAY'S WORK DUE TO THE
                                                                                                            >




                                                                                                                                                                                                                                                                                                                                                                                                                    Y
                                                                                                                                                                                                                                                                                                                                                                                                                    >
                                                                                                                                                                                                  |




                                                                                                                                                                                                                                                                                                                                                                                                                                                                 9
                                                                        SW                                                                                                                                                                                                                                                                                                                                                                                            5                                                                                                       POSSIBILITY OF OVERNIGHT RAINS AND IMMEDIATELY PRIOR TO ANY
                                                                                        S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                          7.7
                                                                                                                                                                                                  Y




                                                                                                                                                                                                                                                                                                                                                                                                                        |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              POSSIBLE STORM EVENT.
                                                                                  SW                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     8. KERB AND/OR SURFACE INLET SEDIMENT TRAPS ARE TO BE PROVIDED AT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              EACH DRAINAGE PIT UNTIL ADJACENT DISTURBED AREAS ARE FULLY




                                                                                                                                                                                                                                                                                                                                                                                                            S




                                                                                                                                                                                                                                                                                                                                                                                                                                                     W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              RESTORED.
                                                                                                           >




                                             S[C]                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        9. FILTER ROLLS TO BE PROVIDED AT ALL STORMWATER INLET PITS.
                                                                                        S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         10. ANY DIRT/MUD/MATERIALS SPILT OR TRACKED ONTO THE COUNCIL'S ROADS
                                                                 S[C]                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         IS TO BE BROOMED UP AND COLLECTED - NOT WASHED DOWN INTO THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              STORM WATER DRAINS.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           8.0
                                                                                                                                                                                                                                                                                                                                                                                                                                                     W
                                                                                                                     S[C]                                    S[C]                                                                                                                                                                                                                                                                                                    7.50
                                                                                                       >




                                                                                                                                                                                                              S[C]                   S[C]               S[C]                 S[C]              S[C]




                                                                                                                                                                                                                                                                                                                                                                                                            S
                                                                                                                                                                                                                                                                                                          S[C]                 S[C]                 S[C]                S[C]               S[C]                                                                                                                                                                          EROSION & SEDIMENT CONTROL
                                                                                                                                                                                                                                                                                                                                                                                                                                      S[C]                                                                                                                               TRENCHING OPERATIONS:




                                                                                                                                                                                                                                                                                                                                                                                                                                                     W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         THE CONTRACTOR SHALL FOLLOW THE PROCEDURES BELOW TO MINIMISE
                                                                                    S[C]




                                                                                                            7.0




                                                                                  7.0                                                                                                                                                                                                                                                                                                                                                                                S[C]                                                                                                SCOURING OF TRENCHES DURING RAINFALL EVENTS THAT OCCUR THROUGH THE
                                                                                                                0




                                                                                                                                       7.25




                                                                                     0




                                                                                                                                                                                                                                                                                                                                                                                                   Y || Y




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |
                                                                                                                                                                                                                                                                             SP 163309
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    7.25                                                                                 CONSTRUCTION PHASE.




                                                                                                                                                                                                                                                                              LOT 902




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          1.   OPEN ONLY AS MUCH GROUND AS REQUIRED TO UNDERTAKE THE WORK AT
                                                                                                                                                                                                               7.50




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       S[C
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               ]                                                               HAND.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Y
                                                                                                                                                                                                                                                                                                                                                                                                    |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          2. WHEREVER POSSIBLE CONSTRUCT LINES FROM UPSTREAM TO




                                                                                                                                                                                                                                                                                                                                                                                                   Y




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       |
                                                                                                                                                                                                                                                                                                                     7.50
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               DOWNSTREAM.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Y
                                                                                        NOTE:                                                                                                                                                                                                                                                                                                                                                                                                                                     S[C




                                                                                                                                                                                                                                                                                                                                                                                                    |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     ]                                    3. PLACE BEDDING MATERIAL AS SOON AS PRACTICAL AFTER OPENING




                                                                                                                                                                                                                                                                                                                                                                                                   Y
                                                                                                                                                                                                                                                                                                                                                                                       7.25




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       |
                                                                                        REFER TO DRAWING                                                                                                                                                                                                                                                                                                    |
                                                                                                                                                                                                                                                                                                                                                                                                                Y   |
                                                                                                                                                                                                                                                                                                                                                                                                                            Y   |
                                                                                                                                                                                                                                                                                                                                                                                                                                      Y      |                                                                                                                                 TRENCH.
                                                                                                                                                                                                                                                                                                                                                                                                                                                 Y   |
                                                                                                                                                                                                                                                                                                                                                                                                                                                         Y   |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Y    |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Y    |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Y     |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Y   |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Y
                                                                                        S12884-CE01 FOR LEGEND.                                                                                                                                                                                                                                                                                                                                                                                                                                                           4. CLOSE TRENCH AS SOON AS PRACTICABLE AFTER LAYING PIPE.
                                                                                                                                                                                                                                                                                                                                                           CONTRACTOR TO SEEK PERMISSION                                                                                                                                                             S[C]
                                                                                                                                                                                                                                                                                                                                                           FROM LAND OWNER OF LOT 902 ON                                                                                                                                                                                  5. INSTALL FILTER ROLLS IN TRENCHES AT 10m CENTRES WHENEVER
                                                                                                                                                                                                                                                                                                                                                           RP163309 TO ERECT SILT FENCE                                                                                                                                                                                        TRENCHES ARE PROPOSED TO BE LEFT OPEN AND UNATTENDED eg.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               OVERNIGHT.


                                                                                                                                                                                                                                                                                                                  PLAN                                                                                                                                                                                                                                                   EROSION STAGING NOTE:
                                                                                                                                                                                                                                                                                                                 SCALE 1:100                                                                                                                                                                                                                                             THE EROSION MEASURES SHOWN ON THIS DRAWING ARE TO BE ADJUSTED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         THROUGHOUT THE COURSE OF CONSTRUCTION TO SUIT INTERIM STAGING OF THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         BUILDING WORKS. ANY TEMPORARY SITE WORKS SHALL BE MANAGED IN A WAY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         NOT TO CAUSE ANY NUISANCE DRAINAGE IMPACTS TO ADJOINING OR
                                            LEGEND                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       DOWNSTREAM PROPERTIES. CONTACT CONSULTING ENGINEER FOR FURTHER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         DETAILS AS REQUIRED.
                                                         OH[C]               EXISTING ELECTRICAL OVERHEAD                                                                                                                     PROPOSED FILL

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         SAFE ACCESS NOTE:
                                                         T[C]                EXISTING TELECOMMUNICATION                                                                                                                                                                                                                                                                                                                                                                                                                                                                  CONTRACTOR TO CLOSE FOOTPATH AND BARRICADE STABILISED ENTRY/EXIT.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         PROVIDE SAFE PEDESTRIAN ACCESS IN ACCORDANCE WITH THE MANUAL FOR
                                                                                                                                                                                                                              PROPOSED CUT
                                                         SW[C]               EXISTING STORMWATER DRAINAGE                                                                                                                                                                                                                                                                                                                                                                                                                                                                UNIFORM TRAFFIC CONTROL DEVICE.


                                                          S[C]               EXISTING SEWERAGE MAIN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         DEMOLITION NOTE:
                                                                             EXISTING SEWERAGE MAIN TO BE                                                                                                                     STABILISED ENTRY/EXIT POINT                                                                                                                                                                                                                                                                                                                THE PERSON RESPONSIBLE FOR THE DEMOLITION WORKS SHALL ENSURE THAT
                                                          S[C]                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           ALL VEHICLES LEAVING THE SITE CARRYING DEMOLITION MATERIALS HAVE THEIR
                                                                             DISUSED BY METHOD OF GROUT FILLED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         LOADS COVERED AND DO NOT TRACK SOIL OR WASTE MATERIALS ONTO THE
                                                                             EXISTING SEWERAGE MAIN TO BE                                                                                                                                                                                                                                                                                                                                                                                                                                                                ROAD.
                                                                 S
                                                                             ABANDONED AND REMOVED                                                                                                                            SILT FENCE

                                                         W[C]                EXISTING WATER MAIN
                                                                                                                                                                                                                              TEMPORARY DIVERSION DRAIN                                                                                                                                                                                                                                                                                                                  ASBESTOS REMOVAL NOTE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         SHOULD ASBESTOS BE PRESENT, ITS REMOVAL SHALL BE CARRIED OUT IN
                                             10.000                          EXISTING MAJOR CONTOURS                                                                                                                                                                                                                                                                                                                                                                                                                                                                     ACCORDANCE WITH THE NATIONAL OH&S COMMITTEE - CODE OF PRACTICE FOR
                                                                                                                                                                                                                              PROPOSED ROCK CHECK DAM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         SAFE REMOVAL OF ASBESTOS AND ITS CODE OF PRACTICE FOR THE MANAGEMENT
                                                          SW                 PROPOSED STORMWATER DRAINAGE                                                                                                                                                                                                                                                                                                                                                                                                                                                                AND CONTROL OF ASBESTOS IN THE WORKPLACE.

                                                                                                                                                                                                                              PROPOSED INLET SOCK PROTECTION
                                                           >                 PROPOSED SWALE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         WORKPLACE HEALTH AND SAFETY NOTE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         ALL WORKS UNDERTAKEN BY THE CONTRACTOR SHALL COMPLY WITH THE
                                                           S                 PROPOSED SEWERAGE MAIN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         REQUIREMENTS OF THE QUEENSLAND WORK HEALTH AND SAFETY ACT 2011.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         CONTACT THE NEAREST OFFICE OF THE DIVISION OF WORKPLACE HEALTH AND
                                                           W                 PROPOSED WATER MAIN                                                                                                                                                                                                                                                                                                                                                                                                                                                                         SAFETY FOR INFORMATION. PHONE No. 1300 362 128.

                                                                             PROPOSED BASEMENT OUTLINE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         DIAL BEFORE YOU DIG:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           -                                                                                             IT IS THE CONTRACTORS RESPONSIBILITY TO CONTACT 'DIAL BEFORE YOU DIG'
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         PH.1100 FOR THE LOCATION OF EXISTING PUBLIC UTILITIES PRIOR TO EXCAVATION.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    NOOSA 
Log in to download the original file

Approved Plans - OPW21_0103.pdf · 5.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.