Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2020-21 Contract Works - COC -Lake Macdonald Drive, Cooroy

of 2

Page text shows just the words. Original shows the document exactly as it was published.

                                                              Tom Frisby | Senior Account Executive
                                                              Marsh Pty Ltd
                                                              ABN 86 004 651 512
                                                              111 Eagle Street
                                                              BRISBANE QLD 4000
                                                              GPO Box 2743
                                                              BRISBANE QLD 4001
                                                              +61 7 3115 4631 Fax +61 7 3115 4500
                                                              [email protected]
                                                              marsh.com.au




CERTIFICATE OF CURRENCY
CONTRACT WORKS ANNUAL PROJECT CONTRACTOR
CONTROLLED INSURANCE
 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE
 HOLDER. IT DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICY. IT IS
 PROVIDED AS A SUMMARY ONLY OF THE COVER PROVIDED AND IS CURRENT ONLY AT THE DATE OF
 ISSUE. FOR FULL PARTICULARS, REFERENCE MUST BE MADE TO THE CURRENT POLICY WORDING

INSURED
Shadforths Civil Pty Ltd, Shadforths Civil Engineering Contractors Pty Ltd, Dirtwise Pty Ltd, Shadforths Civil
Contractors Pty Ltd, Shadforths Plant Hire Pty Ltd, Ausroads Stabilisers Pty Ltd and/or affiliated and/or
subsidiary and/or controlled companies as defined in the Corporations Law of Australia now or previously
existing or hereafter formed or acquired.
All others as defined herein, all for their respective rights and interests.


PERIOD OF INSURANCE
From: 28 February 2020 at 4:00pm local time
To: 28 February 2021 at 4:00pm local time

Any subsequent period for which the Insured has requested and the Insurer has accepted.


INSURER
 NAME                                              POLICY NUMBER                           PARTICIPATION %

 Certain Underwriters at Lloyds of London           CONA0000218                                  100%



COVERING
Construction Period
Physical loss of, damage to or destruction of the Contract Works, from an event not otherwise excluded by
the Policy.

Maintenance/Defects Liability Period
Physical loss of, damage to or destruction of the Property Insured, from an event not otherwise excluded by
the Policy, as a result of the Insured complying with his/their obligations under the Maintenance/Defects
Liability provisions of the contract or agreement.
Log in to download the original file

2020-21 Contract Works - COC -Lake Macdonald Drive, Cooroy.pdf · 362 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.