Annex 10 - Code 8 - Coastal Development & Tidal Works
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
State code 8: Coastal development and tidal works
Table 8.2.1: All development
Performance outcomes Acceptable outcomes Response
Development in the erosion prone area
PO1 Development does not occur in the erosion prone area No acceptable outcome is prescribed. Complies with PO1
unless the development:
Works are coastal dependent development and
1. is one of the following types of development: cannot be feasibly located elsewhere.
a. coastal-dependent development; or
b. temporary, readily relocatable or able to
be abandoned; or
c. essential community infrastructure; or
d. redevelopment of an existing permanent
building or structure that cannot be
relocated or abandoned; and
2. cannot feasibly be located elsewhere.
PO2 Development other than coastal protection work: No acceptable outcome is prescribed. Complies with PO2 (processes still occur, but the
1. avoids impacting on coastal processes; and works may result in reduced erosion).
2. ensures that the protective function of landforms 1) The purpose of the works is not to provide
and vegetation is maintained.
erosion protection, but to restore rock oyster
Note: In considering reconfiguring a lot applications, the
state may require land in the erosion prone area to be ecosystems throughout the Noosa River.
surrendered to the State for coastal management purposes
The design of the works extends to Mean High
under the Coastal Protection and Management Act 1995.
Water Springs and the reef substrate will be
Where the planning chief executive receives a copy of a
land surrender requirement or proposed land surrender overtopped by high tides, storm surge, flooding,
notice under the Coastal Protection and Management Act wave action and vessel wake. As such, the works
1995, this must be considered in assessing the application. do not prevent erosion or natural processes from
occurring but may influence these processes.
Three concept module layouts have been
developed (Refer ICM Drawing NROR-2021-02).
The suitability of each module for different
conditions has been broadly defined and there are
State Development Assessment Provisions – version 2.6
State code 8: Coastal development and tidal works Page 1 of 20