Annex 10 - Code 8 - Coastal Development & Tidal Works

Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).

of 20

Page text shows just the words. Original shows the document exactly as it was published.

  Performance outcomes                                               Acceptable outcomes                    Response
                                                                                                            The proposed works are designed to minimise the
                                                                                                            potential for erosion of the park shoreline. On the
                                                                                                            contrary, it is expected that the works may enhance
                                                                                                            protection of the park shoreline by attenuating some
                                                                                                            wave action due to the high rugosity and positioning
                                                                                                            of the oyster reef patches, which will attenuate wave
                                                                                                            energy before it reaches the shoreline at all but the
                                                                                                            highest points of the tidal cycle (see Project
                                                                                                            Restoration Plan, Section 8.4. Erosion control).

                                                                                                            Note – Ecological information regarding the Goat Island
                                                                                                            restoration site was provide by Ecological Services
                                                                                                            Professionals. A full report is included as Annex 1 of the
                                                                                                            Project Restoration Plan. See also relevant plans – MSES
                                                                                                            (Annex 2), MQ1401 (Annex 3), Noosa River FHA (Annex 4)


Table 8.2.2: All operational work
  Performance outcomes                                               Acceptable outcomes                    Response
  Private marine development
  PO17 Private marine development does not require the               No acceptable outcome is prescribed.   Not applicable.
  construction of coastal protection work, shoreline or
                                                                                                            The works are not private marine development.
  riverbank hardening or dredging for marine access
  purposes.
  Disposal of solid waste or dredged material from artificial waterways
  PO18 Solid waste from land and dredged material from               No acceptable outcome is prescribed.   Not applicable.
  artificial waterways is not disposed of in tidal water unless it
                                                                                                            The works do not involve dredged material.
  is for beneficial reuse.
  Disposal of dredged material other than from artificial waterways
  PO19 Dredged material is returned to tidal water                   No acceptable outcome is prescribed.   Not applicable.
  where this is needed to maintain coastal processes                                                        The works do not involve dredged material.
  and sediment volume.
  PO20 Where it is not needed to maintain coastal                    No acceptable outcome is prescribed.   Not applicable.
  processes and sediment volume, the quantity of                                                            The works do not involve dredged material.

State Development Assessment Provisions – version 2.6
State code 8: Coastal development and tidal works                                                                                            Page 17 of 20
Log in to download the original file

Annex 10 - Code 8 - Coastal Development & Tidal Works.pdf · 223 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.