Infrastructure Agreement (23689 DA) - Executed 18/7/2011 (Peet No.90 - Greenwood Grove) · 132004.240018

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

 

 

 

 

Rev B dated 18 November 2010 prepared by Worley | Stage 3 of
Parsons annexed hereto within Schedule 2. the
Approval
Temporary road widening is to constitute a minimum
8m wide carriageway and include the installation of
flood warning signs and water depth indicators on the
approaches to the creek crossing.
Sub-ltem 8.3. The Owner agrees at its own expense to lodge | Prior to
8.3 an application for a Development Permit for sealing the
Operational Works (and/or amend an existing plans of
Development Approval for Operational Works) to survey for
facilitate works identified in 8.1 & 8.2. Stage 3 of
the
Approval
Sub-ltem 8.4 | The Owner agrees at its own expense to Prior to
8.4 undertake and construct the full upgrade of Garnet sealing of
Street between Ch340 and Ch733 in accordance with | Plans per
Condition 65.1.2 and 65.1.3 of Development Permit stage 4 of
132004.240018.6 and as approved in Operational the
Works Permit 2007/1777. Approval. or
the due date
whichever
shall _ first
occur.
Sub-Item 8.5 The Owner agrees at its own expense to lodge
8.5 an application for a Development Permit for
Operational Works (and/or amend an existing
Development Approval for Operational Works) to
facilitate works identified in 8.4.
Sub-item 8.6 The Owner agrees to provide the Council with | Prior to
8.6 a cash bond, insurance bond or trading bank sealing of
guarantee in the amount of $2,840,931.00 being the Plans per
cost of the structure that is required over Cooroy stage 3 of
Creek as part of the works identified within 8.4. The the
bond, insurance bond or trading bank guarantee is to | Approval.

 

 

be provided to Council in accordance with Noosa
Council's Policy, in a form satisfactory to Council as
security for the performance of the works within the
Road Reserve. The security will be returned to the
owner when the external road works are “on
maintenance”.

 

 

6034162141

 

 

 

Used in these records

About this file

File size
402 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Infrastructure Agreement (23689 DA) - Executed 18_7_2011 (Peet No.90 - Greenwood Grove).pdf · 402 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.