Appendix B
Stormwater Management Plan, Flood
Certificate & Form 15
Application for a Development Permit for
a Material Change of Use - Dual
Occupancy

55 Doonella Street, Tewantin
Lot 5 RP73672


Ashburton Pastoral Company A.C.N. 137 063 444
Log in to download the original file

Appendix B - SWMP, Flood Cert & Form 15.pdf · 4.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 46 pages

Page 2

     STORMWATER MANAGEMENT REPORT

     53-55 Doonella Street
     Tewantin, QLD 4565
     Project No.: 20210038

     Version: 1.0
     Version Date: 30/08/21




                                                                                                  Page 1 of


P +61 7 5211 1003   A 37 Mary St, Noosaville Qld 4566   E [email protected]   recorconsulting.com

Page 3

            PROJECT INFORMATION



            Client:                              Rowan Anderson

            Site Location:                       53 & 55 Doonella Street, Tewantin QLD 4565

            Lot & Plan:                          Lot 4 T16337 & Lot 5 RP73672

            Proposed Development: Residential duplex development




            RECOR Consulting

            Project Reference:                   20210038

            Contact Person:                      Benjamin Parry

            Contact Phone:                       (07) 5211 1003




            Document Control:




                      VERSION                        PREPARED             REVIEWED                DATE
                                                                          N. Wagstaff
                        1.0                             B. Parry                                30/08/2021
                                                                        (RPEQ: 26443)




                                                                                                                    Page i
P +61 7 5211 1003         A 37 Mary St, Noosaville Qld 4566        E [email protected]       recorconsulting.com

Page 4

            TABLE OF CONTENTS

            PROJECT INFORMATION .................................................................................................................................... I
            TABLE OF CONTENTS ........................................................................................................................................ II
            1. INTRODUCTION ............................................................................................................................................ 1
            2. SITE DETAILS ................................................................................................................................................. 1
               2. 1. E X I S T I N G S I T E D E S C R I P T I O N ................................................................................ 1
               2. 2. E X I S T I N G D R A I N A G E P A T T E R N S ............................................................................. 2
                 2.2.1 Stormwater Catchments .................................................................................................................... 2
               2. 3. P R O P O S E D D E V E L O P M E N T D R A I N A G E P A T T E R N .......................................................... 4
                 2.3.1 Stormwater Concept .......................................................................................................................... 4
                 2.3.2 Stormwater Catchments .................................................................................................................... 5
               2. 4. F L O O D C O N S I D E R A T I O N S .................................................................................... 6
               2. 5. A C I D S U L P H A T E S O I L S ........................................................................................ 6
            3. STORMWATER QUANTITY ............................................................................................................................ 7
               3. 1. P R E – P O S T C O M P A R I S O N ................................................................................... 7
            4. STORMWATER QUALITY ............................................................................................................................... 8
               4. 1. C O N S T R U C T I O N P H A S E ....................................................................................... 8
                 4.1.1 Erosion and Sediment Control Measures ........................................................................................... 8
               4. 2. O P E R A T I O N A L P H A S E ......................................................................................... 9
                 4.2.1 MUSIC Modelling ............................................................................................................................. 10
                 4.2.1.1.          Rainwater Tanks ................................................................................................................... 11
                 4.2.1.1.          Pit Inserts .............................................................................................................................. 12
                 4.2.1.1.          Bioretention Areas ................................................................................................................ 14
                 4.2.1.1.          Buffer Strip............................................................................................................................ 15
                 4.2.1.2.          MUSIC modelling results ....................................................................................................... 16
                 4.2.2 Operational Maintenance ................................................................................................................ 16
            5. CONCLUSION .............................................................................................................................................. 18
                                   PROPOSED DEVELOPMENT PLANS ........................................................................................ 19
                                   OCEAN PROTECT OCEAN GUARD LITTER BASKET DOCUMENTATION..................................... 20
                                   BIORETENTION INSPECTION CHECKLIST ................................................................................ 21




P +61 7 5211 1003                  A 37 Mary St, Noosaville Qld 4566                               E [email protected]                                 recorconsulting.com

Page 5

            1. INTRODUCTION
            RECOR has been commissioned to prepare a Stormwater Management Report to
            accompany a development application for a proposed residential duplex development in
            Doonella Street, Tewantin.

            This report examines the stormwater management considerations for the existing and
            proposed development site and assesses how the run-off from the site is to be managed in
            accordance with Noosa Shire Council requirements for stormwater drainage.


            2. SITE DETAILS
            2. 1. E X I S T I N G S I T E D E S C R I P T I O N

            The site is made up of two adjoining properties, Lot 4 on T16337 (no. 53) and Lot 5 on
            RP73672 (no. 55). The site and neighbouring properties to the east and west are zoned
            medium density residential. The site is bounded to the south by Lake Doonella.




                               Figure 2.1 - Site Locality Plan (Noosa Council Intramaps, 2021)

            Lot 4 on T16337 is accessed from the 14.77m frontage at 53 Doonella Street. The site has
            an area covering 642.4m² and currently houses a detached dwelling on the northern end of
            the site, and predominately grassed at the southern end of the site. The site has total
            impervious area of 200.2m², made up of 166.2m² of roof and 34m² of paved areas.



                                                                                                           Page 1 of 22
P +61 7 5211 1003            A 37 Mary St, Noosaville Qld 4566    E [email protected]     recorconsulting.com

Page 6

            Lot 5 on RP73672 has an 18.24m frontage which provides access to the property from 55
            Doonella Street. The site covers 649.4m² and contains a detached dwelling and small free-
            standing shed making up 240.6m² of roof area, along with 93.9m² of paved area. Ground
            cover at the rear of the property is predominately grass.

            2. 2. E X I S T I N G D R A I N A G E P A T T E R N S

            Data obtained from the Council’s interactive mapping does not identify any stormwater
            infrastructure within Doonella Street at the location of the site frontages, however the
            detailed survey has picked up two stormwater kerb inlet pits adjacent the driveways to each
            property. The pits were unable to be accessed, so invert levels and dimensions for the
            infrastructure are not known.

            The surface run-off from the site drains south on both properties towards Lake Doonella.
            Within Lot 4 on T16337, the site grades vary between up to 20% at the property access on
            the northern end of the site, to less than 5% at the southern end of the site. The northern
            end of Lot 5 on RP73672 falls at around 10% away from Doonella Street, towards grades of
            around 5% at the southern end of the site. No natural drainage channels nor internal
            stormwater infrastructure was identified by the survey, so it is believed that site run-off will
            drain as overland sheet flow towards the lake at the south of the site.

            The surface levels within the Doonella Street road reserve indicate that run-off from the
            upstream footpath and verge areas will typically drain into the properties as surface run-off.

            2.2.1 Stormwater Catchments

            A schematic layout plan of the existing drainage catchments as described in the previous
            sections is shown below in Figure 2.2 – Existing Catchments Plan




                                                                                                           Page 2 of 22
P +61 7 5211 1003           A 37 Mary St, Noosaville Qld 4566       E [email protected]   recorconsulting.com

Page 7

                                        Figure 2.2 – Existing Catchments Plan




                                                                                                    Page 3 of 22
P +61 7 5211 1003   A 37 Mary St, Noosaville Qld 4566        E [email protected]   recorconsulting.com

Page 8

            2. 3. P R O P O S E D D E V E L O P M E N T D R A I N A G E P A T T E R N

            2.3.1 Stormwater Concept

            Under existing conditions, the stormwater is discharged from the property as overland
            surface flows towards Lake Doonella to the south of the sites. It is proposed that this will
            remain the lawful point of discharge for the proposed development with the design
            required to demonstrate no worsening of the peak discharges for the design storms for the
            proposed development compared to the existing state.

            Roof run-off for each unit will be collected and flow via downpipes into a single 3kL slim-line
            rainwater tank. The tanks will be plumbed for internal reuse in toilets and laundry areas, with
            1.5kL of the tank allocated for reuse, and the remaining 1.5kL per tank dedicated to
            attenuating site run-off. To minimise pollutants entering the tank, first flush diverters will be
            installed to divert the initial capture of roof water to irrigation of the vegetated areas on site.

            The driveway run-off will be collected via grated trench drains that will filter through Ocean
            Protect Ocean Guard litter basket (or approved equivalent) to provide primary treatment of
            gross pollutants and larger particulates from the run-off.

            Run-off from the upstream footpath catchments will be intercepted at the driveway access
            to the site with a grated trench drain to control its flow through the site within the internal
            drainage network.

            Run-off from the rainwater tank overflows, driveway and upstream footpath areas will be
            discharged through a lined bioretention area at the south of each site to provide secondary
            treatment targeting the removal of phosphorus and nitrogen, ensuring the maximum run-
            off from the development will receive treatment prior to discharge.

            Outflows from the bioretention area will be via a surcharged pipe outlet with a one-way flap
            gate to prevent backflows entering the pipe. The outflows will be dispersed through a rock
            apron dissipator to break up the concentrated outflow and minimise the possibility of scour
            from the outlet.

            The roof and allotment drainage system for the proposed site shall be designed to comply
            with:

                    1. Noosa Shire Council Planning Scheme Policy (PSP) - Engineering Design Standards
                       – Roads, drainage and earthworks;

                    2. The Queensland Urban Drainage Manual (QUDM); and

                    3. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage.




                                                                                                                Page 4 of 22
P +61 7 5211 1003           A 37 Mary St, Noosaville Qld 4566            E [email protected]   recorconsulting.com

Page 9

            2.3.2 Stormwater Catchments

            A schematic layout plan of the proposed development and its drainage catchments as
            described in the previous sections is shown below in Figure 2.3 – Proposed Catchments
            Plan.




                                           Figure 2.3 – Proposed Catchments Plan


                                                                                                       Page 5 of 22
P +61 7 5211 1003       A 37 Mary St, Noosaville Qld 4566       E [email protected]   recorconsulting.com

Page 10

            2. 4. F L O O D C O N S I D E R A T I O N S

            The Noosa Shire Council Intramaps Flood Hazard Overlays show that the proposed
            development site may be subject to flooding or inundation, which will need to be
            considered when defining the minimum floor and surface levels for the development. The
            extent of the flooding as indicated by Intramaps is shown below in Figure 2.4 – Noosa Plan
            2020 Flood Hazard Overlay.




                                      Figure 2.4 – Noosa Plan 2020 Flood Hazard Overlay

            A Noosa Council flood certificate will be required for the proposed site that will define the
            2100 1% AEP storm event flood level and determine the required habitable floor levels for
            the dwellings on the site including freeboard above the flood level. A freeboard to habitable
            floor levels of typically 500mm above the 2100 1% AEP storm event is likely to be required.
            The levels of carparks and habitable floor levels will need to be confirmed during detailed
            design.

            2. 5. A C I D S U L P H A T E S O I L S

            Acid sulphate soil testing is typically required in areas with surface levels less than 5.0m
            Australian Height Datum (AHD) as stated in the State Planning Policy 2017. The
            requirements for acid sulphate testing will be confirmed by a geotechnical engineer prior
            to the detailed design stage of this proposed development.


                                                                                                         Page 6 of 22
P +61 7 5211 1003           A 37 Mary St, Noosaville Qld 4566    E [email protected]    recorconsulting.com

Page 11

            3. STORMWATER QUANTITY
            3. 1. P R E – P O S T C O M P A R I S O N

            The site has been modelled using the Autodesk Storm and Sanitary Analysis module in its
            existing and unmitigated proposed developed state. The catchment hydrology has been
            configured in accordance with the Bureau of Meteorology’s IFD curves for the locality, and
            a minimum time of concentration of 5 minutes for each catchment. All catchments for the
            proposed development and the internal drainage network and storage areas have been
            modelled as described in Figure 2.2 – Existing Catchments Plan and Figure 2.3 – Proposed
            Catchments Plan. The results of the modelling against the range of design storms for the
            development under the existing and proposed development conditions are shown in

                       Table 3.1 Existing and proposed unmitigated site peak discharge rates

                                        53 Doonella Street                    55 Doonella Street
                                                                                                               Total
                     A.E.P       Qexisting     Qproposed        Qchange   Qexisting   Qproposed     Qchange   Qchange
                                 (m³/s)        (m³/s)           (m³/s)    (m³/s)      (m³/s)        (m³/s)    (m³/s)

                    63.20% 0.009               0.014           0.005      0.012       0.015        0.003      0.008
                    50%         0.010          0.016           0.006      0.013       0.017        0.004      0.010
                    20%         0.014          0.021           0.007      0.019       0.023        0.004      0.011
                    10%         0.017          0.025           0.008      0.022       0.028        0.006      0.014
                    5%          0.020          0.029           0.009      0.026       0.032        0.006      0.015
                    2%          0.024          0.033           0.009      0.030       0.037        0.007      0.016
                    1%          0.026          0.037           0.011      0.034       0.040        0.006      0.017


            As the site has increased the total peak flows from the site, attenuation storage will be
            required to mitigate the outflows to ensure that the development does not exceed the
            predevelopment levels.

            To determine the attenuation required, the model for the developed site was updated to
            include the proposed stormwater attenuation devices to be provided for the development.
            Rainwater attenuation tanks were modelled as storage nodes with 2 3kL tanks provided per
            development. An attenuation portion equal to half the capacity of the tank was modelled,
            with a low flow outlet of 25mm and high flow outlet of 100mm. The reuse portion of the tank
            was assumed to be full at the time of the storm so only the attenuation portion contributes
            to flow mitigation.

            Each bioretention area was modelled as a storage node consisting of the bioretention filter
            media and the extended detention depth. A porosity of 0.3 was considered as the water
            holding capacity for the filter media, with the low flow pipe consisting of the slotted
            drainage pipe and the high flow weir overflow for flows overtopping the pit.

            Using this mitigated development model, the proposed developed flows were again
            compared to the existing state as shown below in


                                                                                                                             Page 7 of 22
P +61 7 5211 1003          A 37 Mary St, Noosaville Qld 4566               E [email protected]              recorconsulting.com

Page 12

                         Table 3.2 Existing and proposed mitigated site peak discharge rates

                                        53 Doonella Street                    55 Doonella Street               Total
                      A.E.P      Qexisting     Qproposed        Qchange   Qexisting   Qproposed     Qchange   Qchange
                                 (m³/s)        (m³/s)           (m³/s)    (m³/s)      (m³/s)        (m³/s)    (m³/s)

                    63.20% 0.009               0.010           0.001      0.012       0.011        -0.001     0.000
                    50%         0.010          0.011           0.001      0.013       0.012        -0.001     0.000
                    20%         0.014          0.013           -0.001     0.019       0.015        -0.004     -0.005
                    10%         0.017          0.015           -0.002     0.022       0.017        -0.005     -0.007
                    5%          0.020          0.016           -0.004     0.026       0.018        -0.008     -0.012
                    2%          0.024          0.018           -0.006     0.030       0.020        -0.010     -0.016
                    1%          0.026          0.023           -0.003     0.034       0.027        -0.007     -0.010


            As the total peak flows are equal to or below the existing site conditions, the development
            suitably controls the peak flow storm events from the development.

            4. STORMWATER QUALITY
            The following sections discuss the stormwater quality considerations for the construction
            and operational phase of the development. Refer to Appendix A Proposed Development
            Plans for the proposed stormwater drainage layout plan.


            4. 1. C O N S T R U C T I O N P H A S E

            4.1.1 Erosion and Sediment Control Measures

            During construction, it will be necessary to manage stormwater run-off to avoid potential
            contamination of downstream waterways from sediments and other pollutants from the site.
            Best practice erosion and sediment controls shall be installed to minimise the discharge of
            potential contaminants from the site, in accordance with the objectives of Appendix 2 of the
            SPP (DERM, July 2017) shown below in Figure 4.1.




                                                                                                                             Page 8 of 22
P +61 7 5211 1003          A 37 Mary St, Noosaville Qld 4566               E [email protected]              recorconsulting.com

Page 13

               Figure 4.1 SPP 2017 Construction Phase Stormwater Management Design Objectives

            A site-specific erosion and sediment control plan shall be prepared as part of a future
            submission for Operational Works approval. Suitable erosion and sediment controls for the
            site may include:

                    1. Sediment fencing along all downstream boundaries of the site to capture sediment
                       from leaving the site.

                    2. A shakedown area is to be installed at the construction entry/exit to the site to
                       minimise sediment being transported to and from the site.

                    3. Ensuring stockpiles and construction materials are contained using sediment
                       fencing downstream of these areas.

                    4. Turfed diversion swales may be provided at upstream boundaries to divert surface
                       run-off around exposed earthwork areas.

            4. 2. O P E R A T I O N A L P H A S E

            The development is to comply with the Noosa Council Water Quality and Drainage Code,
            AO6.2 which states:



                                                                                                        Page 9 of 22
P +61 7 5211 1003           A 37 Mary St, Noosaville Qld 4566   E [email protected]    recorconsulting.com

Page 14

            “All stormwater runoff is treated to achieve maximum removal of nutrients, gross pollutants
            and suspended solids as determined by cost to efficiency ratios. (e.g., bioretention basins
            must be sized to achieve at least 80% reduction in total suspended solids, 60% reduction in
            total phosphorous, 45% reduction in total nitrogen and 90% reduction in gross pollutants
            >5mm).”

            It is proposed that the following measures to be implemented will provide the required
            level of stormwater quality improvement to minimise impacts to the downstream network:

                    •   First-flush divertors will be installed for roof-water drainage to divert initial run-off
                        capture to irrigation of the vegetated areas on site.
                    •   4 x 3,000L Slimline Rainwater tanks will be used to capture roof run-off, with 50% of
                        the tank volume allocated to reuse, and 50% to attenuation storage.
                    •   Ocean Protect Ocean Guard Litter baskets (or similar) to be provided to the
                        driveway inlet pits minimise sediment and gross pollutants from entering the
                        drainage line. Refer to Appendix B Ocean Protect Ocean Guard Litter Basket for
                        details.
                    •   2 x 6m² Bioretention areas will be used to treat and detain stormwater run-off from
                        prior to discharge from the site.

            4.2.1 MUSIC Modelling

            The proposed development and the above treatment train have been modelled in MUSIC
            (Model for Urban Stormwater Improvement Conceptualisation) software in accordance
            with the Water by Design MUSIC Guidelines 2018.

            The climatic data has been modelled using the rainfall and PET data at station 40059
            (Cooroy Composite) in 6-minute timesteps. The rainfall run-off parameters have been set
            as defined for the Southeast Queensland region, shown below in Figure 4.2 - Rainfall run-
            off parameters for SEQ.




                                                                                                                 Page 10 of 22
P +61 7 5211 1003             A 37 Mary St, Noosaville Qld 4566     E [email protected]         recorconsulting.com

Page 15

                                        Figure 4.2 - Rainfall run-off parameters for SEQ

            The source nodes have been created using a split catchment approach, with the roof,
            driveway and other ground areas separated with stochastic pollutant generation for each
            of the surface types as per Table 4.1 - Urban Residential Split Node Pollutant Generation
            Parameters. The area and impervious fractions for each catchment are actual values based
            on the design plans.


                    Table 4.1 - Urban Residential Split Node Pollutant Generation Parameters

             Flow Type      Surface          TSS LOG¹º                TP LOG¹º VALUES               TN LOG¹º VALUES
                            Type             Mean      St. Dev        Mean       St. Dev            Mean      St. Dev
             Baseflow  Roof                     N/A            N/A      N/A            N/A            N/A        N/A
                       Driveway                 1.00           0.34    -0.97           0.31           0.20       0.20
                       Ground                   1.00           0.34    -0.97           0.31           0.20       0.20
             Stormflow Roof                     1.30           0.39    -0.89           0.31           0.26       0.23
                       Driveway                 2.43           0.39    -0.30           0.31           0.26       0.23
                       Ground                   2.18           0.39    -0.47           0.31           0.26       0.23

            The proposed treatment train has been modelled as shown in Figure 4.3 - MUSIC
            Stormwater Treatment Train. The details of the treatments are described in the following
            sections




                                        Figure 4.3 - MUSIC Stormwater Treatment Train



                         4.2.1.1.       Rainwater Tanks

            The rainwater tanks connected to the source nodes representing their drained catchments.
            Each of the tanks to be provided is modelled as a 3kL storage volume, with 1.5kL allocated
            for re-use (assumed to be full at beginning of the modelling) and the remaining portion
            being for attenuation capacity.



                                                                                                                         Page 11 of 22
P +61 7 5211 1003          A 37 Mary St, Noosaville Qld 4566           E [email protected]              recorconsulting.com

Page 16

                                              Figure 4.4 – Typical Tank node configuration

            The tanks will be plumbed for internal reuse which has been modelled in accordance with
            the Water by Design MUSIC Modelling guidelines. The reuse demands have been
            determined as follows:

                    -   Internal Reuse

                           o     All homes are assumed to be fitted with full water saving devices,

                                           26L/Person/day for laundry

                                           21L/Person/day for toilets

                           o     3-bedroom townhouses:

                                           2.3 persons per unit

                                           2.3 * 47L = 108.1L/day/unit

            4.2.1.1. Pit Inserts

            The grated inlet pits in the driveway are to be fitted with Ocean Protect Ocean Guard Litter
            baskets (or approved equivalent). The inserts are modelled using generic treatment nodes,
            with a high flow bypass of 20L/s per insert and concentration-based capture efficiency set
            in accordance with the manufacturers specifications shown below in Figure 4.5 to Figure
            4.8. Refer to Appendix B Ocean Protect Ocean Guard Litter Basket for further details on
            the devices.



                                                                                                                Page 12 of 22
P +61 7 5211 1003              A 37 Mary St, Noosaville Qld 4566         E [email protected]   recorconsulting.com

Page 17

                    Figure 4.5 – Ocean Guard Total Suspended Solid Removal Efficiency




                     Figure 4.6 - Ocean Guard Total Phosphorous Removal Efficiency




                        Figure 4.7 - Ocean Guard Total Nitrogen Removal Efficiency




                                                                                                  Page 13 of 22
P +61 7 5211 1003    A 37 Mary St, Noosaville Qld 4566   E [email protected]     recorconsulting.com

Page 18

                           Figure 4.8 - Ocean Guard Gross Pollutant Removal Efficiency




            4.2.1.1. Bioretention Areas

            Two 6m² bioretention areas are to be provided within each property to capture and treat
            surface run-off from the driveways as well as overflows from attenuation tanks. The
            bioretention areas are modelled in accordance with the Water by Design MUSIC Guidelines
            2018 with the node configuration for one of the areas shown below in Figure 4.9 –
            Bioretention Node details.




                                            Figure 4.9 – Bioretention Node details

            Table 4.2 – Bioretention Area Plantings below (based on the Brisbane City Council Water
            Sensitive Urban Design Engineering Guidelines) presents a sample of suitable plants that
            shall be used to provide effective nutrient removal in the bioretention areas.



                                                                                                         Page 14 of 22
P +61 7 5211 1003       A 37 Mary St, Noosaville Qld 4566         E [email protected]   recorconsulting.com

Page 19

                                              Table 4.2 – Bioretention Area Plantings

                                                                                                                             Planting
                       Scientific Name                              Common Name                   Form       Height (mm)      Density
                                                                                                                             (Qty/m²)
             Myoporum parvifolium                              Creeping Boobialla               Prostrate       150             4-6
             Cymbopogon refractus                              Barbed Wire Grass                Tufted          300            8-10
             Cyperus polystachyos                              Bunchy Sedge                     Tufted          600             6-8
             Dianella brevipendunculata                        Flax Lily                        Tufted          500             4-6
             Dianella caerulea cv ‘Breeze’                     Blue Flax-lily                   Tufted          600             4-6
             Dianella caerulea cv ‘Little Jess’                Blue Flax-lily                   Tufted          400             4-6
             Dianella longifolia var. longifolia               Pale Flax-lily                   Tufted          550             6-8
             Dichelachne crinita                               Long Haired Plume Grass          Tufted          200             6-8
             Erograstis elongata cv ‘Elvera’                   Elvera                           Tufted          300             6-8
             Imperata cylindrica                               Blady Grass                      Tufted          500             4-6
             Lepidosperma laterale                             Variable Sword Sedge             Tufted          750            8-10
             Lomandra confertifolia                            Matting Lomandra                 Tufted          300             4-6
             Lomandra confertifolia subs pallida               Mat Rush                         Tufted          400             4-6
             Lomandra longifolia                               Matt Rush                        Tufted          1000            4-6
             Lomandra longifolia cv 'Tanika'                   Tanika                           Tufted          500             4-6
             Poa labillardiere cv ‘Eskdale’                    Eskdale                          Tufted          450             6-8
             Themeda australis                                 Kangaroo Grass                   Tufted          400             6-8
             Themeda australis cv ‘Mingo                       Mingo                            Tufted          200            8-10

            4.2.1.1. Buffer Strip

            A 2m wide grassed buffer strip has been modelled as treating surface run-off from the rear
            of the proposed development as it passes as overland sheet flows towards Lake Doonella.
            The rear of the site is predominately grassed, with a sewer drainage line running along the
            southern boundary ensuring the strip assumed for treatment will not be developed. The
            parameters applied to the buffer strip are presented in




                                              Figure 4.10 – Buffer strip characteristics


                                                                                                                                 Page 15 of 22
P +61 7 5211 1003          A 37 Mary St, Noosaville Qld 4566                    E [email protected]             recorconsulting.com

Page 20

            4.2.1.2. MUSIC modelling results

            The proposed treatment train for each site can achieve the required water quality
            improvements as shown below in Table 4.3 - MUSIC Modelling results and Table 4.4 -
            MUSIC Modelling results for 55 Doonella St.

                                 Table 4.3 - MUSIC Modelling results for 53 Doonella St.

                                                     Sources     Residual          Percentage     Percentage
                                                                 Load              Target         Reduction

             Total Suspended Solids (kg/yr)             91.311       5.45                  80        94.031

             Total Phosphorus (kg/yr)                    0.198      0.034                  60        82.596

             Total Nitrogen (kg/yr)                      1.335      0.464                  45        62.548

             Gross Pollutants (kg/yr)                   13.424        0                    90          100




                                 Table 4.4 - MUSIC Modelling results for 55 Doonella St

                                                     Sources     Residual          Percentage     Percentage
                                                                 Load              Target         Reduction

             Total Suspended Solids (kg/yr)            127.657      8.555                  80        93.299

             Total Phosphorus (kg/yr)                     0.27      0.056                  60        79.098

             Total Nitrogen (kg/yr)                      1.664      0.683                  45        58.935

             Gross Pollutants (kg/yr)                   16.331       0.00                  90        100.00




            4.2.2 Operational Maintenance

            Periodic maintenance and monitoring of the stormwater infrastructure proposed for this
            development shall be carried out to ensure they are operating effectively during the post-
            construction phase. After the on-maintenance period, the responsibility for these
            maintenance activities shall be the body corporate for the site.

            The field inlet grates, trench drains, pits and underground pipes shall be inspected for
            blockage or damage at least six monthly or after significant rainfall event. Any blockages
            shall be cleared from the system, and damage assessed to determine if it impacts on the
            function of the system or may pose a hazard that will require repair.




                                                                                                                 Page 16 of 22
P +61 7 5211 1003         A 37 Mary St, Noosaville Qld 4566          E [email protected]        recorconsulting.com

Page 21

            The litter baskets shall be maintained in accordance with the manufacturer’s specifications.
            Refer to Appendix B Ocean Protect Ocean Guard Litter Basket for further details.

            The bioretention areas shall be maintained following a schedule of routine inspections
            undertaken after every significant rainfall event (30mm of rainfall in a 24-hour period) or on
            a three-monthly basis within the first twelve months and on a six-monthly basis thereafter.
            The inspection shall ensure the proper functioning and condition of the bioretention area
            and ensure that the planting and vegetation health is suitably maintained. An inspection
            checklist from the Healthy Waterways Technical Design Guidelines for Southeast
            Queensland has been provided in Appendix C Bioretention Inspection Checklist that
            provides the structure for the inspections to be undertaken.

            In addition to regular inspections, the first 4 months of establishment of the bioretention
            areas requires a watering frequency of:

               i.    Week 1 - 6: 5 times per week

               ii.   Week 6-10: 3 times per week

              iii.   Week 11-15: 2 times per week

            After 5 months, watering frequency shall be adjusted based on the local conditions to
            ensure plants are maintained in a healthy state.




                                                                                                          Page 17 of 22
P +61 7 5211 1003         A 37 Mary St, Noosaville Qld 4566   E [email protected]        recorconsulting.com

Page 22

            5. CONCLUSION
            This Stormwater Management Report has outlined how the stormwater run-off from the site
            is to be managed to comply with the relevant requirements and minimise any adverse
            impacts to the downstream catchments.

                    •   The existing site and upstream catchments’ drainage patterns currently discharge
                        from the site as overland flows into towards Lake Doonella to the south of the site.

                    •   The proposed legal point of discharge for the site will continue to be Lake Doonella.

                    •   The existing and proposed development site have been modelled for the critical
                        design storm events for the site, which found attenuation would be required. Further
                        modelling for the mitigated developed site was able to demonstrate that there will
                        be no increase to total existing discharge conditions from the site for any of the storm
                        events.

                    •   During construction, erosion and sediment control measures shall be implemented
                        to minimise potential contaminants impacting the downstream receiving
                        environment. An erosion and sediment control plan shall be developed as part of a
                        submission for Operational Works approvals.

                    •   In the operational phase of the development, a stormwater treatment train will
                        provide quality improvements as required by the Noosa Council Planning Scheme
                        Policy. Roof run-off is to be directed towards 4 x 3,000L rainwater reuse and
                        attenuation tanks that will be fitted with first-flush divertors to will divert initial roof
                        run-off to on site irrigation of vegetated areas. The tanks are to be plumbed for reuse
                        for internal (laundry and toilets) purposes that will serve to provide both treatment
                        and reduce the volume of run-off leaving the site. Overflows from the tanks, as well
                        as the piped drainage will be directed toward the 6.5m2 bioretention areas at the
                        south of each site that will treat the majority of run-off from the site while also
                        attenuating run-off volumes. Ocean Protect Ocean Guard litter baskets will be
                        provided to the pits within the driveway areas to provide at source primary
                        treatment. Outflows from the bioretention area will be via a surcharged drainage line
                        from each area, using a one-way flap gate outlet to prevent backflows.

                        By implementing the proposed stormwater treatments, the development will reduce
                        the quantity of stormwater pollutants by more than 90% of gross pollutants, 80% of
                        total suspended solids, 60% total phosphorous and 45% total nitrogen, exceeding
                        the pollutant reduction targets required for the site.

                    •   By implementing the proposed stormwater solution, it is considered that stormwater
                        layout proposed will minimise any adverse impacts to the downstream environment
                        arising from the stormwater run-off while also meeting the stormwater quality targets
                        required for the development.




                                                                                                                   Page 18 of 22
P +61 7 5211 1003             A 37 Mary St, Noosaville Qld 4566      E [email protected]          recorconsulting.com

Page 23

                                   Proposed Development Plans




                                                                                      Page 19 of 22
P +61 7 5211 1003   A 37 Mary St, Noosaville Qld 4566   E [email protected]   recorconsulting.com

Page 24

                                                                                                                                                                                                                                                                                                MCU
                                                                                                                                                                                                                                                                                                    ISSUE




                                                                                                                                                                                EXTENDED DETENTION
                                                                                                                                                                                  NOMINAL 200MM
                                                                                                                                                                                                                              PLANTING SPECIES TO PROVIDE EFFECTIVE
                                                                                                                             MAINTENANCE HATCH                                                                                REMOVAL OF NUTRIENTS. PLANT VARIETIES
                                                                                                                             SECURE CAPPED END                                                                                AND PLANTING DENSITIES TO ARCHITECTURAL                               DRAINAGE PIPE
                                                                                                                             WITH SCREWS                                                                                      SPECIFICATIONS
                                                                                                                                                                                                     600x600 INLET PIT
                                                                                                                                                  600x600 RAISED GRATE                               SL 1.35
                                                                                                                   1 IN                              FIELD INLET PIT S.L.                                                                                                                           DRAINAGE PIT
                                                                                                                          4 MA
                                                                                                                                 X                                                                                                      MAX
                                                                                                                                                                                                                               1 IN 4           EXTEND GEOFABRIC 500MM
                                                                                                                                                                                                                                                 AND PIN UNDER TOPSOIL
                                                                                                                                                                                                                                                                                                  GRATED TRENCH
                                                                                                                                                                                                                                          300MM SANDY LOAM FILTER MEDIA                           DRAIN
                                               Ø




                                                                                            C
                                                                                     SN MMØ
                                              M C                                                                                                                                                                                         (0.45MM AVERAGE PARTICLE SIZE)




                                                                                          PV
600x600 GRATED INLET PIT                  00M uPV




                                                                                       8u
                                         1 8




                                                                                        0
CLASS B GRATED LID.                        SN                                                                                                                                                                                                                                                       BIORETENTION




                                                                                      10
PROVIDE OCEANGUARD                                                                                                                                                                                                                            100MM COARSE SAND                                     GARDEN
LITTER BASKET OR                                                                                                                                                                                                                              TRANSITION FILTER MEDIA
                                                                                                                                                                                                                                              (NOMINAL SIZE 0.5 - 2MM)
APPROVED EQUIVALENT.
                                                                                                                                     PROVIDE                                   PROVIDE SLOTTED SUBSOIL DRAIN AT
                                                                                                                                     END CAP                                   MIN 0.5% GRADE TO PIT                                    NOMINAL 200MM GRAVEL                                        RAINWATER TANK
                                               100MMØ                                                    N8 uPVC
                                                                                                100MMØ S
                                                                                                                                                                                                                                        DRAINAGE LAYER
                                                                                                                                                                                                                                        (FINE AGG., NOMINAL SIZE 2 - 5MM)
                                               SN8 uPVC                                         @ MIN 0.5%
                                                                                                                                                                              BIDIM A34 GEOFABRIC OR SIMILAR

                                               @ MIN 0.5%                                                                                SUBSOIL DRAIN CLEANOUT               TO BE WRAPPED AROUND
                                                                                                                                       (NON-SLOTTED PVC) AND 135°              WALLS AND BASE OF FILTER MEDIA                                                                                       HEADWALL WITH
                                                                                                                                              ELBOW CONNECTOR                                                                                                                                       APRON
                                                                                                                                            DETAIL A - BIORETENTION GARDEN TYPICAL DETAILS




                                                                                                                                     LOW FLOW JUNCTION WITH SCREW CAP DETAIL                                   RAINWATER ATTENUATION TANK DETAIL

                                                                                                                                                           ORIFICE PLATE DISK                          100Ø HIGH FLOW     ROOF DOWNPIPE CONNECTION TO
                                                                                                                                                           WITH 25mm ORIFICE                               OUTLET         HYDRAULIC ENGINEERS SPECIFICATIONS
                                                                                                                                      HIGH FLOW                  TANK
                                                                                                                                      OUTLET                     WALL
                                                                                                                                                            RETENTION LEVEL                                    3,000L SLIMLINE RAINWATER TANK
                                                                                                                           SCREW ON
                                                                                                                           ACCESS CAP
                                                                                                                                                                                                                         ATTENUATION
                                                                                                                                                                                                                         VOLUME 1.5KL
                           150MMØ
                           PP SN8




                                                                                                                                     OUTLET TO
                                                                                                                                     DRAINAGE
                                                                                                                                     NETWORK       ORIFICE DISK TO BE GLUED                                          RAINWATER REUSE
                                                                                                                                                   INSIDE JUNCTION. uPVC                                               VOLUME 1.5KL
                                                                            150MMØ
                                                                            PP SN8




                                                                                                                                                   OUTLET FROM TANK TO BUTT
                                                                                                                                                   UP AGAINST ORIFICE DISK


                                    PROVIDE 3kL SLIMLINE RAINWATER /                                                      NOTE: TANKS TO BE PLUMBED FOR INTERNAL
                                                                                                                          RE-USE IN LAUNDRIES AND TOILETS
                                    ATTENUATION TANK PER DWELLING AS
                                    PER DETAIL B. OVERFLOWS TO BE
                                                                                                                                          DETAIL B - RAINWATER RE-USE / ATTENUATION TANK DETAILS
                                    DISCHARGED TO BIORETENTION AREA




                                                                                                                                                                                                                                                                                                                30/08/2021


                                                                                                                                                                                                                                                                                                                EA ID: 2557785
                                                                                                                                                                                                                                                                                                                 RPEQ: 26443




                                                                                                                                                                                                                                                                                                                             -
                                                                                                                                                                                                                                                                            23/08/21   ISSUED FOR MCU                        -    BRP
 6.5M² BIORETENTION                                                                                                                                                                                                                                                          DATE              REVISION                MARK CHK
 AREA TO BE                                                                                                                                                                                                                                                                 PROJECT ENGINEER
 PROVIDED AS PER
 DETAIL A.




                                                                                                                                                                                                                                                                             E [email protected]
                                                                                                                                                                                                                                                                             A 37 MARY ST NOOSAVILLE, QLD
                                                                                                                                                                                                                                                                             P +61 7 5211 1003
                                                                                                                                                                                                                                                                            CLIENT
                                                                                                                          DRAINAGE NOTES
 225MM Ø SN8 PP PIPE                                                                                                                                                                                                                                                          ROWAN ANDERSON
 SURCHARGED LINE                                                                                                          1. BUILDING AND ROOF DRAINAGE TO BE DESIGNED BY SUITABLY QUALIFIED HYDRAULIC ENGINEER.
                                                                                                                          2. INTERNAL STORMWATER DRAINAGE PIPES TO SITE SHALL BE MINIMUM SN8 CLASS uPVC OR PP                                                               PROJECT
 US IL: 0.65M
                                                                                                                             WITH MINIMUM 0.5% GRADE.
 DS IL: 0.85M
                                                                                                                          3. ALL STORMWATER GRATES/LIDS WITHIN TRAFFICABLE AREAS TO BE CLASS "D" IN ACCORDANCE
                                                                                                                                                                                                                                                                              53 - 55 DOONELLA STREET
                                                                                                                             WITH AS3996.                                                                                                                                     TEWANTIN
                                                                                                                          4. OCEAN GUARD LITTER BASKET OR APPROVED EQUIVALENT TO BE PROVIDED AND INSTALLED IN
                                                                                                                             ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS.
                                                                                                                          5. RAINWATER TANKS TO BE PLUMBED FOR INTERNAL REUSE TO LAUNDRY AND TOILET FITTINGS.                                                               TITLE
                                                                                                                          6. ALL GRATES AND LIDS SHALL SIT FLAT WITH ITS SURROUND AND NOT BE LOOSE OR MOVE
                                                                                                                             UNDER WHEEL LOADS.                                                                                                                               STORMWATER DRAINAGE
                                                                                                                          7. ALL STORMWATER STRUCTURES TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT
                                                                                                                             SPECIFICATION, AND LOCAL AUTHORITY GUIDELINES AND SPECIFICATIONS.                                                                                PLAN
                                                            ENDWALL WITH ROCK APRON                                       8. THE LOCATION OF ALL SERVICES MUST BE CONFIRMED ON SITE PRIOR TO WORKS COMMENCING
                                                            SCOUR PROTECTION. PROVIDE                                        AND THE ENGINEER SHALL BE ADVISED OF ANY CONFLICTS AS SOON AS POSSIBLE.
                                                            ONE-WAY FLAP GATE OUTLET                                      9. LANDSCAPED AND VEGETATED AREAS TO BE GRADED LOCALLY LOCALLY TOWARDS DRAINAGE.
                                                                                                                                                                                                                                                                            PROJECT NO.      DRAWING NO.    STATUS

                                                                                                                                                                                                                                                                             20210038         C10           MCU
                                                                                                                                                                                                                                                                            DRAWN            DESIGNED       SCALE                ISSUE

                                                                                                                                                                                                                                                                                BRP            BRP             NTS                A

Page 25

                                                                                                                PROPOSED SITE CATCHMENT AREAS
          EXISTING SITE CATCHMENT AREAS
                                                                                                                                                                                                             MCU
                                                                                                                                                                                                                 ISSUE



                                                                                                                                                                                                              EXTERNAL UPSTREAM
                                                E2                                                                                              E2                                                            CATCHMENT
E1                                                                                               E1

                                                                                                                                                                                                                 INTERNAL GROUND
                                                                                                                                                                                                                 CATCHMENT
                                                                                                      C1                                          C2
                                                                                                                                                                                                                 INTERNAL ROOF
                                                                                                                                                                                                                 CATCHMENT




     R1
                                                     R2

                                                                                            R1             R2


                                                                                                                                    R3                       R4




                                                  C2                                                                                                                                                                             30/08/2021


                                                                                                                                                                                                                                 EA ID: 2557785
                                                                                                                                                                                                                                  RPEQ: 26443




                                                                                                                                                                                                                                            -
                                                                                                                                                                                         23/08/21   ISSUED FOR MCU                          -      BRP
C1                                                                                                                                                                                        DATE              REVISION                  MARK CHK
                                                                                                                                                                                         PROJECT ENGINEER

                                                                                                      C3                                          C4



                                                                                                                                                                                          E [email protected]
                                                                                                                                                PROPOSED CATCHMENT AREAS                  A 37 MARY ST NOOSAVILLE, QLD
                                                                                                                                                                         FRACTION         P +61 7 5211 1003
                                                                                                                                      CATCHMENT        AREA (Ha)
                                                                                                                                                                      IMPERVIOUS (%)
                                                                                                                                                                                         CLIENT
                                               EXISTING CATCHMENT AREAS                                                                   R1                 0.013               100.0
                                                                                                                                                                                           ROWAN ANDERSON
                                                                             FRACTION                                                     R2                 0.013               100.0
                                     CATCHMENT            AREA (Ha)                                                                                                                      PROJECT
                                                                          IMPERVIOUS (%)
                                          R1                      0.017             100.0
                                                                                                                                          R3                 0.013               100.0      53 - 55 DOONELLA STREET
                                                                                                                                          R4                 0.013               100.0      TEWANTIN
                                          R2                      0.024             100.0
                                                                                                                                          C1                  0.011               75.9
                                          C1                      0.048               7.1                                                                                                TITLE
                                                                                                                                          C2                 0.016                70.1
                                          C2                      0.041              23.0                                                                                                  STORMWATER CATCHMENT
                                                                                                                                          C3                 0.026                22.9
                                          E1                      0.003              69.4                                                                                                  PLAN
                                                                                                                                          C4                 0.025                30.2
                                          E2                      0.006              50.6
                                                                                                                                          E1                 0.003                69.4
                                                                                                                                                                                         PROJECT NO.      DRAWING NO.    STATUS
                                                                                                                                          E2                 0.006                50.6    20210038         C20           MCU
                                                                                                                                                                                         DRAWN            DESIGNED       SCALE                    ISSUE

                                                                                                                                                                                             BRP            BRP             NTS                    A

Page 26

                    Ocean Protect Ocean Guard Litter Basket
                    Documentation




                                                                                      Page 20 of 22
P +61 7 5211 1003   A 37 Mary St, Noosaville Qld 4566   E [email protected]   recorconsulting.com

Page 27

     OceanGuard
Technical Design Guide


[OCR of page images]
©|OCEAN

PROTECT

OceanGuard

Technical Design Guide

Page 28

                                                                                    Ocean Protect | OceanGuard Technical Design Guide

Table of Contents


Introduction ............................................................................................................................................ 2


Operational Overview ............................................................................................................................ 2


Features .................................................................................................................................................. 3


Configurations ........................................................................................................................................ 3


Performance ........................................................................................................................................... 4


Maintenance........................................................................................................................................... 4


Design Basics .......................................................................................................................................... 5

   1. Hydraulic Design & Configuration ............................................................................................................. 5
   2. Water Quality Design................................................................................................................................. 5
   3. Mass Load Design ...................................................................................................................................... 5




Rev: 1 Last Updated: March 2019


                                                                                                                                                      Page 1 of 5

Page 29

                                                        Ocean Protect | OceanGuard Technical Design Guide

Introduction
The OceanGuard technology is a gully pit basket designed to fit within new and existing stormwater pits
targeting pollution in stormwater runoff. The system is offered with a choice of filtration bag liners, designed
to remove gross pollutants, total suspended solids and attached pollutants. It can be adopter as a stand-
alone technology or as part of a treatment train with our StormFilter or Jellyfish filtration products.

The filtration bag, filtration cage and flow diverter work together to maximise the flow treated, pollutant
capture, hydraulic efficiency and ultimately retaining captured pollutants dry. OceanGuard pit inserts are
highly effective, easy to install and simple to maintain.

Operational Overview
The OceanGuard is installed into field or kerb inlet gully pits. The flow diverter at top of the unit has a rigid
recycled plastic HDPE skirt that is installed against the walls directing all incoming stormwater flows into the
filtration bag.

The stormwater is then filtered via direct screening through the filtration bag liner ensuring that any debris
larger than the openings in the filtration bag are captured and retained.

During large storm events the water elevation in the filtration bag can rise and peak flows are internally
bypassed through slots created in the flow diverter which has no moving parts that may prematurely fail.

At the end of the storm event debris and stormwater rest at the base of the filtration bag where the stored
material will start to dry until the next storm event.




                                      Figure 1: OceanGuard components




                                                                                                     Page 2 of 5

Page 30

                                                         Ocean Protect | OceanGuard Technical Design Guide

Features
The OceanGuard technology has the following features:

    -   Flow Diverter
        Directs flow into the unit for filtration of stormwater flows and includes an in-built rigid bypass to
        divert stormwater overflows in high-intensity and peak storm flows.
    -   Filtration Bag
        Removable coarse (gross pollutant removal) and fine grade (200micron) filtration bags.
    -   Filtration Cage
        The supporting cage that allows for the use of larger filtration bags.
The OceanGuard can also be fitted with an oil/hydrocarbon adsorbent material (optional) to capture and
retain oil and grease. The adsorbent material is contained in socks that are designed to ensure maximum
contact with stormwater as it enters the gully pit.

The OceanGuard is designed to be easily retrofitted into new and existing stormwater pits, requiring no
construction or land take. The OceanGuard is often the most practical solution and reduces the pollutant
load and maintenance burden on downstream infrastructure.

Configurations
The OceanGuard can fit a range of pits typically found in Australia including, kerb entry, rear entry with grated
drain entry as well as field gully pits. There are multiple sizes to suit pits ranging in plan dimensions of 450 x
450mm – 1200 x 1200mm. Additional custom sizes are available to suit circular and non-standard pits.

The standard OceanGuard configuration treats surface flow only, see figure 2. In some instances, it may be
necessary to treat pipe flow, see figure 3. Remember to limit the upstream catchment to the basket to no
more than 1000m2 (or DN300mm pipe) otherwise the peak flows may cause structural damage to the
OceanGuard. Furthermore, to assist design checks by a suitable qualified engineer need to be undertaken to
ensure the upstream catchment is not excessively large. Please note that the OceanGuard technology is not
a replacement for an in-line gross pollutant trap.




    Figure 2: Standard configuration – surface flow          Figure 3: Example configuration – pipe flow
Another typical configuration required, is where the runoff collected by grated strip or trench drains needs
to be treated, see figure 4.




                                                                                                      Page 3 of 5

Page 31

                                                        Ocean Protect | OceanGuard Technical Design Guide




                         Figure 4: Example configuration – Grated strip/trench drain

Performance
Typically, laboratory testing provides a means to generate hydraulic and basic performance data, but it
should also be complemented with long-term field data. Gully pit baskets that operate under unrestricted
flows require both a combination lab and field studies to accurately understand performance.

Ocean Protect has and is undertaking field testing locally in Australia and copies of the supporting articles are
available upon request from Ocean Protect.

Gully pit baskets and associated technology have been available in Australia and overseas for more than 20
years. The OceanGuard technology has design elements and removal performance that are the same as some
off-patent technologies, such as the previous generation EnviroPod previously sold by Stormwater360
Australia (Now Ocean Protect) under licence.

The OceanGuard meets all previous performance data and current approvals across Australia in terms of
pollutant removal, flow rate and head loss. Please contact your Ocean Protect representative for more
information.

Please contact your Ocean Protect representative to obtain the StormFilter approval status in your area.

Maintenance
Maintenance of the OceanGuard is simple effective and seldom requires confined space entry or specialised
equipment, often being completed by hand without the need of vacuum equipment. Simply remove the
OceanGuard from the pit with the tags provided and invert the bag into a waste bin. Inspect the liner and
brush by hand or spray with a pressure washer if required to rejuvenate the filtration bag. Record the
information and replace the filtration bag.

Inspection & Cleaning
The Ocean Guard® system should be inspected at regular intervals from 1-2 months during the first year of
installation to ensure optimum performance. The frequency at which the OceanGuard will need to be
maintained will depend on site activities, land uses, catchment area and this size of OceanGuard installed, 1-
6 times annually (3-4 typ.).

For further information please refer to the OceanGuard Operations and Maintenance Manual.




                                                                                                     Page 4 of 5

Page 32

                                                      Ocean Protect | OceanGuard Technical Design Guide

Design Basics
The design requirements of any OceanGuard system is detailed in 3 typical steps.

    1. Hydraulic Design & Configuration
    2. Water Quality Design
    3. Mass Load Design

1. Hydraulic Design & Configuration
All OceanGuard inserts must be designed to ensure that the hydraulic requirements of the system are met
without adversely impacting the upstream hydraulics (limiting the likelihood of localised flooding).

2. Water Quality Design
Ocean Protect recommends and uses the widely endorsed Model for Urban Stormwater Improvement
Conceptualisation (MUSIC), which makes it easy to correctly sizing an appropriate StormFilter system for your
site.

A complimentary design service which includes MUSIC modelling is provided by the Ocean Protect
engineering team. Simply email your project details to [email protected] or alternatively you
can always call one of our engineers for a discussion or to arrange a meeting in your office. The team will
provide you with an efficient design containing details of the devices required to meet your water quality
objectives together with budget estimates, product drawings and the MUSIC (.sqz) file.

Alternatively, you can download the MUSIC treatment nodes for the Ocean Protect products from our
website (www.oceanprotect.com.au).

When designing/modelling an OceanGuard system for water quality purposes in MUSIC, a single GPT node is
utilised. The GPT node is utilised with relevant removal efficiencies inserted. These parameters can vary
based on the jurisdiction (authority) of your project, relevant details can be obtained from Ocean Protect.
When modelling, the high-flow bypass is modified in node by adding the total number of Ocean Guards
installed and multiplying this number by 20L/s, eg 10 x Ocean Guards = 0.2m3/s.

All details such as drawings, specifications and maintenance manuals can also be downloaded for integration
into your project’s documentation. Additionally the Ocean Protect team is available to review your model
and provide additional assistance and guidance on the configuration of the OceanGuard system(s) for your
project.

3. Mass Load Design
Always be mindful of the magnitude of upstream catchment areas pay particular attention to perceived dirty
or high loading sites. The Ocean Protect team can provide assistance and details on this process.




                                                                                                 Page 5 of 5

Page 33

         OceanGuardTM
Operations & Maintenance Manual


[OCR of page images]
©|OSEAN

PROTECT

OceanGuard™
Operations & Maintenance Manual

Page 34

                                                               Ocean Protect | OceanGuard Operations & Maintenance Manual

Table of Contents

Introduction ........................................................................................................................................... 2

   Why do I need to perform maintenance? .................................................................................................... 2

Health and Safety................................................................................................................................... 3

   Personnel health and safety ......................................................................................................................... 3

How does it Work? ................................................................................................................................ 4


Maintenance Procedures....................................................................................................................... 4

   Primary Types of Maintenance .................................................................................................................... 4
   Minor Service ................................................................................................................................................ 5
       Hand Maintenance.................................................................................................................................... 5
       Vacuum Maintenance ............................................................................................................................... 5
   Major Service (Filter Bag Replacement)....................................................................................................... 5
   Additional Reasons of Maintenance ............................................................................................................ 6
       Hazardous Material Spill ........................................................................................................................... 6
       Blockages................................................................................................................................................... 6
       Major Storms and Flooding ...................................................................................................................... 6
   Disposal of Waste Materials ......................................................................................................................... 6

Maintenance Services ............................................................................................................................ 6




Rev: 1 Last Updated: March 2019


                                                                                                                                                    Page 1 of 6

Page 35

                                          Ocean Protect | OceanGuard Operations & Maintenance Manual

Introduction
The primary purpose of stormwater treatment devices is to capture and prevent pollutants from entering
waterways, maintenance is a critical component of ensuring the ongoing effectiveness of this process. The
specific requirements and frequency for maintenance depends on the treatment device and pollutant load
characteristics of each site. This manual has been designed to provide details on the cleaning and
maintenance processes as recommended by the manufacturer.
The OceanGuard technology is a gully pit basket designed to fit within new and existing gully pits to remove
pollution from stormwater runoff. The system has a choice of Filtration liners, designed to remove gross
pollutants, total suspended solids and attached pollutants as either a standalone technology or as part of a
treatment train with our StormFilter or Jellyfish Filtration products. OceanGuard pit baskets are highly
effective, easy to install and simple to maintain.


Why do I need to perform maintenance?
Adhering to the maintenance schedule of each stormwater treatment device is essential to ensuring that it
functions properly throughout its design life.
During each inspection and clean, details of the mass, volume and type of material that has been collected
by the device should be recorded. This data will assist with the revision of future management plans and help
determine maintenance interval frequency. It is also essential that qualified and experienced personnel carry
out all maintenance (including inspections, recording and reporting) in a systematic manner.
Maintenance of your stormwater management system is essential to ensuring ongoing at-source control of
stormwater pollution. Maintenance also helps prevent structural failures (e.g. prevents blocked outlets) and
aesthetic failures (e.g. debris build up), but most of all ensures the long term effective operation of the
OceanGuard.




                                                                                                 Page 2 of 6

Page 36

                                          Ocean Protect | OceanGuard Operations & Maintenance Manual

Health and Safety
Access to pits containing an OceanGuard typically requires removing (heavy) access covers/grates, but
typically it is not necessary to enter into a confined space. Pollutants collected by the OceanGuard will vary
depending on the nature of your site. There is potential for these materials to be harmful. For example,
sediments may contain heavy metals, carcinogenic substances or sharp objects such as broken glass and
syringes. For these reasons, there should be no primary contact with the waste collect and all aspects of
maintaining and cleaning your OceanGuard require careful adherence to Occupational Health and Safety
(OH&S) guidelines.
It is important to note that the same level of care needs to be taken to ensure the safety of non-work
personnel, as a result it may be necessary to employ traffic/pedestrian control measures when the device is
situated in, or near areas with high vehicular/pedestrian activity.

Personnel health and safety
Whilst performing maintenance on the OceanGuard pit insert, precautions should be taken in order to
minimise (or when possible prevent) contact with sediment and other captured pollutants by maintenance
personnel. In order to achieve this the following personal protective equipment (PPE) is recommended:
       Puncture resistant gloves
       Steel capped safety boots,
       Long sleeve clothing, overalls or similar skin protection
       Eye protection
       High visibility clothing or vest
During maintenance activities it may be necessary to implement traffic control measures. Ocean Protect
recommend that a separate site specific traffic control plan is implemented as required to meet the relevant
governing authority guidelines.
The OceanGuard pit insert is designed to be maintained from surface level, without the need to enter the
pit. However depending on the installation configuration, location and site specific maintenance
requirements it may be necessary to enter a confined space occasionally. It is recommended that all
maintenance personnel evaluate their own needs for confined space entry and compliance with relevant
industry regulations and guidelines. Ocean Protect maintenance personnel are fully trained and carry
certification for confined space entry.




                                                                                                  Page 3 of 6

Page 37

                                           Ocean Protect | OceanGuard Operations & Maintenance Manual

How does it Work?
OceanGuard is designed to intercept stormwater as it enters the stormwater pits throughout a site. The
OceanGuard has diversion panels that sit flush with the pit walls, this ensures that as stormwater enters at
the top of the pit it is directed to the middle of the insert where the Filtration bag is situated. The filtration
bag allows for screening to occur removing 100% of pollutants greater than the opening of the filtration
material (200micron, 1600micron bags available).




During larger rain events the large flows overflow slots in the flow diverter of the OceanGuard ensure that
the conveyance of stormwater is not impeded thus eliminating the potential for surface flooding. As the flow
subsides, the captured pollutants are held in the OceanGuard Filtration bag dry. The waste then starts to dry
which reduces the magnitude of organic material decomposition transitioning between maintenance
intervals.

Maintenance Procedures
To ensure that each OceanGuard pit insert achieves optimal performance, it is advisable that regular
maintenance is performed. Typically the OceanGuard requires 2-4 minor services annually, pending the
outcome of these inspections additional maintenance servicing may be required.


Primary Types of Maintenance
The table below outlines the primary types of maintenance activities that typically take place as part of an
ongoing maintenance schedule for the OceanGuard.

                                        Description of Typical Activities                       Frequency

                                      Filter bag inspection and evaluation
    Minor Service                         Removal of capture pollutants                     2-4 Times Annually
                                               Disposal of material

                                            Filter Bag Replacement
    Major Service                                                                               As required
                                          Support frame rectification




                                                                                                      Page 4 of 6

Page 38

                                           Ocean Protect | OceanGuard Operations & Maintenance Manual
Maintenance requirements and frequencies are dependent on the pollutant load characteristics of each site.
The frequencies provided in this document represent what the manufacturer considers to be best practice
to ensure the continuing operation of the device is in line with the original design specification.

Minor Service
This service is designed to return the OceanGuard device back to optimal operating performance. This type
of service can be undertaken either by hand or with the assistance of a Vacuum unit.


Hand Maintenance
   1. Establish a safe working area around the pit insert
   2. Remove access cover/grate
   3. Use two lifting hooks to remove the filtration bag
   4. Empty the contents of the filtration bag into a disposal container
   5. Inspect and evaluate the filtration bag
   6. Inspect and evaluate remaining OceanGuard components
      (i.e. flow diverter, filtration cage and supporting frame)
   7. Rejuvenate filtration bag by removing pollutant build up with a stiff brush, additionally the filtration
      bag can be washed using high pressure water
   8. Re-install filtration bag and replace access cover/grate


Vacuum Maintenance
   1. Establish a safe working area around the pit insert
   2. Remove access cover/grate
   3. Vacuum captured pollutants from the filtration bag
   4. Remove filtration bag
   5. Inspect and evaluate the filtration bag
   6. Inspect and evaluate remaining OceanGuard components
      (i.e. flow diverter, filtration cage and supporting frame)
   7. Rejuvenate filtration bag by removing pollutant build up with a stiff brush, additionally the filtration
      bag can be washed using high pressure water
   8. Re-install filtration bag and replace access cover/grate


Major Service (Filter Bag Replacement)
For the OceanGuard system, a major service is a reactionary process based on the outcomes from the
minor service.

                 Trigger Event from Minor Service                Maintenance Action

                  Filtration bag inspection reveals
                                                              Replace the filtration bag[1]
                               damage

                                                          Perform rectification works and if
              Component inspection reveals damage
                                                          necessary replace components[1]

        [1] Replacement filtration bags and components are available for purchase from Ocean Protect.



                                                                                                  Page 5 of 6

Page 39

                                          Ocean Protect | OceanGuard Operations & Maintenance Manual

Additional Reasons of Maintenance
Occasionally, events on site can make it necessary to perform additional maintenance to ensure the
continuing performance of the device.


Hazardous Material Spill
If there is a spill event on site, all OceanGuard pits that potentially received flow should be inspected and
cleaned. Specifically all captured pollutants from within the filtration bag should be removed and disposed
in accordance with any additional requirements that may relate to the type of spill event. All filtration bags
should be rejuvenated (replaced if required) and re-installed.


Blockages
The OceanGuards internal high flow bypass functionality is designed to minimise the potential of
blockages/flooding. In the unlikely event that flooding occurs around the stormwater pit the following steps
should be undertaken to assist in diagnosing the issue and implementing the appropriate response.
    1. Inspect the OceanGuard flow diverter, ensuring that they are free of debris and pollutants
    2. Perform a minor service on the OceanGuard
    3. Remove the OceanGuard insert to access the pit and inspect both the inlet and outlet pipes, ensuring
       they are free of debris and pollutants


Major Storms and Flooding
In addition to the scheduled activities, it is important to inspect the condition of the OceanGuard pit insert
after a major storm event. The inspection should focus on checking for damage and higher than normal
sediment accumulation that may result from localised erosion. Where necessary damaged components
should be replaced and accumulated pollutants disposed.


Disposal of Waste Materials
The accumulated pollutants found in the OceanGuard must be handled and disposed of in a manner that is
in accordance with all applicable waste disposal regulations. When scheduling maintenance, consideration
must be made for the disposal of solid and liquid wastes. If the filtration bag has been contaminated with
any unusual substance, there may be additional special handling and disposal methods required to comply
with relevant government/authority/industry regulations.


Maintenance Services
With over a decade and a half of maintenance experience Ocean Protect has developed a systematic
approach to inspecting, cleaning and maintaining a wide variety of stormwater treatment devices. Our fully
trained and professional staff are familiar with the characteristics of each type of system, and the processes
required to ensure its optimal performance.
Ocean Protect has several stormwater maintenance service options available to help ensure that your
stormwater device functions properly throughout its design life. In the case of our OceanGuard system we
offer long term pay-as-you-go contracts, pre-paid once off servicing and replacement filter bags.
                       For more information please visit www.OceanProtect.com.au




                                                                                                  Page 6 of 6

Page 40

                              Bioretention Inspection Checklist




                                                                                      Page 21 of 22
P +61 7 5211 1003   A 37 Mary St, Noosaville Qld 4566   E [email protected]   recorconsulting.com

Page 41

                           BIORETENTION SWALE MAINTENANCE CHECKLIST
                                                      3 to 6      Date of
Inspection Frequency:
                                                      monthly     Visit:
Location:
Description:
Site Visit by:
INSPECTION ITEMS                                             Y       N       ACTION REQUIRED (DETAILS)
Sediment accumulation at inflow points?
Litter within swale?
Erosion at inlet or other key structures?
Traffic damage present?
Vegetation condition satisfactory (density,
weeds etc)?
Replanting required?
Mowing required?
Clogging of drainage points?
Evidence of ponding?
Set down from kerb still present?
Damage/vandalism to structures?
Surface clogging visible?
Drainage system inspected?
Remulching of trees and shrubs required?
Soil additives or amendments required?
Pruning and/ or removal of dead or diseased
vegetation required?
Resetting of system required?
                                                     COMMENTS




                                                                                                          Page 22 of 22
   P +61 7 5211 1003          A 37 Mary St, Noosaville Qld 4566             E [email protected]   recorconsulting.com

Page 42

Noosa Council documents




            Flood Information Certificate
            This certificate is issued in response to an information request for a property which is located within the
            geographical boundaries of Noosa Council.

            Applicants Name            Built by Athena                  Issue Date               08 April 2021
            Applicants Address         56 Joseph Street                 Property Number          145377
                                       CAMP HILL QLD 4152               Property
                                                                                                 Lot 4 T 16337
                                                                        Description
                                                                        Address                  53 Doonella St Tewantin
                                                                                                 Qld 4565
                                                                        Our Reference            Cer21/1328
            Email Address              [email protected]     Issuing Officer          Mark Lewis
                                                                        Your Reference           NA

            This certificate is issued in response to an enquiry for the above property:

            REGISTERED OWNER/S NAME:                                                       Ashburton Pastoral Company P/L TTE
            DEFINED FLOOD LEVEL:                                                                                       2.5m AHD
            DEFINED FLOOD EVENT:                                              1% AEP Under 2100 Climate Change Conditions
            SOURCE OF INFORMATION:                                                 Noosa River Flood Study 2016, WMA Water
            HIGHEST HISTORICAL FLOOD                                       A flood level has not been recorded for this property
            LEVEL:
            LOCATION DESCRIPTION OF
                                                                           A flood level has not been recorded for this property
            RECORDED HISTORICAL EVENT:
            DATE OF HISTORICAL EVENT:                                      A flood level has not been recorded for this property
            FREEBOARD:                                                                                                        0.3m
            APPLICABLE MINIMUM FLOOR
            LEVEL FOR HABITABLE ROOM /
                                                                                  *2.8m AHD (as required by The Noosa Plan)
            AREA:
                                   THIS CERTIFICATE IS VALID FOR 6 MONTHS FROM DATE OF ISSUE.


            *Velocity note:
            The subject property is located in an active water flow area and the velocity of the water is up to approximately
            0.2m/s for the 1% AEP Defined Flood Event.




            www.noosa.qld.gov.au                [email protected]               T 07 5329 6500
            PO Box 141 Tewantin Qld 4565                                            ABN 97 969 214 121
            Flood Information Certificate (FSCV3-0809)                                                           Page 1 of 3
Document Set ID: 21439048
Version: 2, Version Date: 08/04/2021                                                                         Print Date: 8 April 2021, 2:33 PM

Page 43

Noosa Council documents




            CLIMATE CHANGE
            The advice provided in this certificate is based upon information relating to historically recorded flood events and
            future climate condition. The defined flood event incorporates an allowance for climate change for the 1% AEP at
            year 2100. Climate change projections include increased rainfall intensity, higher mean sea level and more
            extreme weather conditions (e.g. storm surge and tropical cyclones).
            NOTES FOR FLOOD INFORMATION
            1.    The absence of Highest Historical Flood Level information does not imply that the above property is not
                  subject to flooding, simply that Council has no record of this property flooding. Applicants are encouraged to
                  make their own local enquiries.
            2.    In accordance with the Low Density Housing Code, the MINIMUM FLOOR LEVEL is calculated as
                  whichever is greater of either:
                   (a)    300mm freeboard added to the Defined Flood Event for the site; or
                   (b)    500 mm freeboard added to the Highest Historical Flood Level appropriate to the site; or
                   (c)    If the property is intended for use as a Hospital, Aged Residential Care Facility or Emergency
                          Services Facility then the Council should be contacted to determine this level.
            3.    Council advises that if stormwater drainage pipelines/easements exist on the property then no earthworks or
                  building are permitted in the easement.
            4.    All buildings shall conform to the relevant Planning Scheme Code in The Noosa Plan.
            5.    Please be aware of the natural topography in your area. Water runoff which exceeds the capacity of the
                  underground drainage system (if present) and which concentrates in surface depressions and gullies as it
                  flows down a catchment can cause localised flooding and is not identified in this certificate.
            6.    Filling must not cause actionable nuisance in accordance with Queensland Urban Drainage Manual.
            7.    Council advises that if there are openings to basements these openings require a minimum level at least
                  equal to the minimum floor level.
            8.    Please be aware that the reported flood information may vary in the future as new data becomes available.
            9.    Flood Hazard Maps within Council’s planning scheme are indicative only and should not be relied upon as a
                  guide to potential flooding.




            www.noosa.qld.gov.au               [email protected]               T 07 5329 6500
            PO Box 141 Tewantin Qld 4565                                           ABN 97 969 214 121
            Flood Information Certificate (FSCV3-0809)                                                         Page 2 of 3
Document Set ID: 21439048
Version: 2, Version Date: 08/04/2021                                                                       Print Date: 8 April 2021, 2:33 PM

Page 44

Noosa Council documents




            DISCLAIMERS
            Flood information provided by Council should only be used as a guide to the extent of flooding on the property. This
            information may be inaccurate or incomplete and it is recommended that purchasers make their own local enquiries with
            regard to the flooding and drainage history of the site. NO LIABILITY IS ACCEPTED FOR THIS INFORMATION.
            The property information supplied does not represent the highest probable flood level that could occur on this property. A flood
            more severe than the level described above may occur, although such events would be extraordinary.
            The absence of flood information does not imply that the above property is not subject to flooding, simply that Council has no
            flood information for this property flooding.
            If there is a history of flooding or drainage issues, we recommend you seek professional advice on this matter.
            COUNCIL ACCEPTS NO RESPONSIBILITY FOR THE ACCURACY OF THIS INFORMATION
            GLOSSARY OF TERMS
                        Term                                                          Definition
                                           The Australian Height Datum (AHD) is the reference level for defining reduced levels
            AHD                            adopted by the National Mapping Council of Australia. The level of 0.0 m AHD is
                                           approximately mean sea level.
            Defined Flood Level            A water level derived through mathematical modelling of the Defined Flood Event.
                                           Terminology consistent with State Planning Policy (SPP, 2003) which states “Defined Flood
            Defined Flood Event            Event is the flood event adopted by a local government for the management of development
                                           in a particular locality”.
                                           The Annual Exceedance Probability is the likelihood of occurrence of a flood or storm tide
                                           inundation event of a given size or larger in any one year, usually expressed as a
                                           percentage. For example, if an event has an AEP of 1%, it means that there is a 1% risk
            1% AEP                         (i.e. probability of 0.01 or a likelihood of 1 in 100) of this event occurring in any one year. A
                                           1% AEP event should not be interpreted as only occurring once in 100 years.
                                           This flood event is also commonly called the 100 year ARI (Average Recurrence Interval) or
                                           Q100.
                                           Is a reference to the document summarising the results of the anticipated flooding relevant
            Source of Information
                                           to this location.
            Highest Historical Flood
                                           The highest flood water level from all historic events for which Council has records.
            Level
            Location Description of
                                           A description of the site where the Highest Historical Flood Level was recorded.
            Recorded Historical Event
            Date of Historical Event       The date on which the Highest Historical Flood Level occurred.
                                           The minimum floor level calculated in accordance with the Town Plan through the addition
            Minimum Floor Level            of the relevant freeboard to the Defined Flood Level and the Highest Historical Flood Level.
                                           Council requires that the higher of these two levels be used as the minimum floor level.
                                           A factor of safety usually expressed as a height above the adopted Defined Flood Level. A
            Freeboard                      freeboard tends to compensate for factors such as wave action and historical and modelling
                                           uncertainties.
                                           In a residential situation: a living or working area, such as a lounge room, dining room,
            Habitable Room/Area
                                           rumpus room, kitchen, bedroom or workroom.
                                           Where a ‘regulation line’ has been set by Council to define the limit to which development
            Flood Regulation Line
                                           may encroach onto a floodplain, development is undertaken outside such ’regulation line’.
            Rainfall Intensity             The amount of rainfall occurring in a unit of time, usually expressed in millimetres/hour.
                                           A tidal datum; the arithmetic mean of hourly heights of the sea at the tidal station observed
            Mean Sea Level
                                           over a period of time (preferably 19 years). Source: BOM This is approximately 0.0 m AHD
                                           The elevation of water generated by a tropical cyclone above or below the normal
            Storm Surge
                                           astronomical tide.
                                           A tropical cyclone is a low-pressure system which develops in the tropics and is sufficiently
            Tropical Cyclones              intense to produce sustained winds of at least 63 km/h or greater and gusts in excess of 90
                                           km/h near the centre.




            www.noosa.qld.gov.au                   [email protected]                    T 07 5329 6500
            PO Box 141 Tewantin Qld 4565                                                    ABN 97 969 214 121
            Flood Information Certificate (FSCV3-0809)                                                                       Page 3 of 3
Document Set ID: 21439048
Version: 2, Version Date: 08/04/2021                                                                                    Print Date: 8 April 2021, 2:33 PM

Page 45

                                                              Department of Housing and Public Works

                                                              Form 15—Compliance certificate
                                                              for building design or
                                                                                     Version 4 – July 2017
                                                              specification
 NOTE: This is to be used for the purposes of section 10 of the Building Act 1975 and/or section 46 of the
 Building Regulation 2006.
 RESTRICTION: A building certifier (class B) can only give a compliance certificate about whether building work
 complies with the BCA or a provision of the Queensland Development Code (QDC). A building certifier (Class B)
 can not give a certificate regarding QDC boundary clearance and site cover provisions.
1. Property description                   Street address (include no., street, suburb/locality and postcode)
This section need only be                  53 & 55 Doonella Street
completed if details of street
address and property description           Tewantin, QLD                                                  Postcode: 4565
are applicable.
                                          Lot and plan details (attach list if necessary)
E.g. in the case of
(standard/generic) pool design/shell       Lot 4 T16337 & Lot 5 RP73672
manufacture and/or patio and
carport systems this section may
                                          In which local government area is the land situated?
not be applicable.                         Noosa Shire Council
The description must identify all
land the subject of the application.
The lot and plan details (e.g.
SP/RP) are shown on title
documents or a rates notice.
If the plan is not registered by title,
provide previous lot and plan
details.
2. Description of                          Operational Works – Stormwater drainage & parking design
   component/s certified
Clearly describe the extent of work
covered by this certificate, e.g. all
structural aspects of the steel roof
beams.




3. Basis of certification
                                           Noosa Shire Council Planning Scheme
Detail the basis for giving the
certificate and the extent to which        AS2890.1, AS 2890.2 – Parking Facilities
tests, specifications, rules,
standards, codes of practice and other     AS3500.3 – Plumbing & Drainage - Stormwater Drainage
publications, were relied upon.
                                           Queensland Urban Drainage Manual (QUDM)




4. Reference documentation                 Architectural Plans (Project 2103: A02, A03, A04, A05)
Clearly identify any relevant
documentation, e.g. numbered               Operational Works drawings (C10, C20, C30)
structural engineering plans.
                                           RECOR 53 55 Doonella St Stormwater Engineering Report - 20210038




LOCAL GOVERNMENT USE ONLY
  Date received                                                        Reference Number/s

Page 46

5. Building certifier reference              Building certifier reference number
   number


6. Competent person details                  Name (in full)
A competent person for building work,
means a person who is assessed by             Nathan Wagstaff
the building certifier for the work as
competent to practice in an aspect of
                                             Company name (if applicable)                     Contact person
the building and specification design,        RECOR                                             Ben Parry
of the building work because of the
individual’s skill, experience and           Phone no. (business hours) Mobile no.                     Fax no.
qualifications in the aspect. The             07 5211 1003               0456 066 328
competent person must also be
registered or licensed under a law           Email address
applying in the State to practice the
aspect.                                       [email protected]
If no relevant law requires the              Postal address
individual to be licensed or registered
to be able to give the help, the certifier
                                              37 Mary Street
must assess the individual as having          Noosaville, QLD                                             Postcode 4566
appropriate experience, qualifications
or skills to be able to give the help.
                                             Licence or registration number (if applicable)
If the chief executive issues any
guidelines for assessing a competent          RPEQ: 26443
person, the building certifier must use
the guidelines when assessing the
person.
7. Signature of competent                    Signature                                             Date
   person
This certificate must be signed by the
individual assessed by the building                                                                            30/08/2021
certifier as competent.



The Building Act 1975 is administered by the Department of Housing and Public Works

Page 47

.
G

STRATEGIC

STRATEGIC SOLUTIONS,
CREATIVE THINKING

rgstrategic.com.au

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.