Council archive · source document
planning report 92 Hilton · MCU26/0080
5.0 State assessment and other matters 5.1 State interests 5.1.1 Matters established in the Planning Regulation In accordance with Schedule 6, Part 2 of the Planning Regulations 2017 – the application is for a new development in the Medium Density Residential Zone that exceeds the scale and intensity of the existing house on the site. 5.1.2 State Planning Policy The SPP includes assessment benchmarks that may be applicable where a local government planning scheme does not adequately reflect the SPP. The Noosa Plan 2020 appropriately integrates all SPP provisions, except for Natural Hazards, risk and resilience – coastal hazards – in part. The site is Not located within the Coastal Management District, however is within the erosion prone area. The design is compliant with the SDAP State Code 8 provisions, with the redevelopment of an existing building within the erosion prone area. The design includes a large setback to the Noosa River boundary and habitable floor levels above 2.7m AHD, which accounts for flood heights that includes 2100 climate change conditions. 6.0 Conclusion This is a development application for the construction of a dwelling house at 92 Hilton Tce, Noosaville. The proposed development is subject to code assessment and meets the relevant Outcomes. The proposal retains a large setback to the river and is dispersed across the 1,937m2 site without impacting on the surrounding area. The Planning Act 2016 prescribes that a code assessment must be carried out only— (a) against the assessment benchmarks in a categorising instrument for the development (The Noosa Plan 2020); and (b) having regard to any matters prescribed by regulation. Council, after carrying out the assessment— (a) must decide to approve the application to the extent the development complies with all of the assessment benchmarks for the development; and (b) may decide to approve the application even if the development does not comply with some of the assessment benchmarks; and Examples— 1 An assessment manager may approve an application for development that does not comply with some of the benchmarks if the decision resolves a conflict between the benchmarks. 2 An assessment manager may approve an application for development that does not comply with some of the benchmarks if the decision resolves a conflict between the benchmarks and a referral agency’s response. (c) may impose development conditions on an approval; and (d) may, to the extent the development does not comply with some or all the assessment benchmarks, decide to refuse the application only if compliance cannot be achieved by imposing development conditions. The assessment finds the development complies with all Acceptable and Performance Outcomes of the applicable codes. The Assessment Manager’s favourable consideration of the above development application is therefore recommended. Page 9 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
planning report 92 Hilton.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.