Attachment C - Engineering Technical Note · 132008.1128.02

Attached to the e-mail Change to DA (Engineering Technical Note) - 132008.1128.02.

of 43

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

                                                             SUNRISE BEACH RETIREMENT AND AGED CARE DEVELOPMENT




                                                                                                                    CONTINUED


INTERNAL SERVICES:

The design of the internal service is such that it will provide all dwellings with access to water, sewer, electricity and
communications infrastructure. The services will be designed to comply with the relevant Australian Standards and Council
Policy. A master meter connection will be provided for each of the RL and RAC sites for water. Sewer will be connected to the
existing sewer mains that traverse the northern boundary of the site/s.

CONCLUSION:
This technical memorandum has been prepared to support the proposed Minor Change application for the Sunrise Beach RL
and RAC development site. This memorandum provides information in relation to the engineering aspects of the proposed
development.
In summary, the proposed minor change has resulted in changes to:
    1.   Internal bulk earthworks design
    2.   Internal Road network layout
    3.   Stormwater conveyance, treatment and infiltration basins
    4.   Internal services layout
Based on the above we note that the changes proposed are minor in nature and do not fundamentally effect the existing
infrastructure networks. As such we consider the prosed minor change consistent with the current DA.
If you have any questions, please do not hesitate to contact the undersigned.
Yours sincerely
Calibre Professional Services Pty Ltd




Shaun Pilcher
Principal Engineer - Urban Development

ATTACHMENTS
1. Engineering Drawings
2. Water network analysis




                                                                                                                    Page 3 of 3

Used in these records

About this file

File size
11.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment C - Engineering Technical Note.pdf · 11.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.