Planning report 3032stage 6

Attached to the e-mail REC14/0009 Reconfiguration of Lots - Stage 6 of Erindale Park - email 1.

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

14

Specific Outcomes SOS

c) stormwater drainage;

d) power supply; and

e) — telecommunications;

AND

O16 The design and provision of public services

and utilities, including sewerage, water,

electricity, street lighting and telecommunication
services—

a) meets the needs of users;

b) ensures health, safety and convenience of
the community;

c) protects the natural environmental values
of the site and surrounds, including visual
amenity and native vegetation;

d) are cost effective over their life cycle,

e) minimises adverse impacts to the
environment (including the amenity of the
local area) in the short and long term; and

f) ensures that the existing systems are
upgraded or relocated to be capable of
supporting the proposed development;

AND

017 Essential public utilities are available and

maintain their function during flood events up to a

1% AEP (1:100 year ARI) flood event.

Bioretention Basin.

 

Electricity supply infrastructure

018 Uses and works maintain a safe distance
from electrical infrastructure including
substations, overhead power lines, power poles
and transformers.

All newly subdivided lots are located away
from any easements and in excess of
50m from any substations.

 

Earthworks and stormwater management

 

019 Stormwater run-off is managed so as not to
cause any adverse impacts on the built or natural
environment including changes in quality,
quantity or location of stormwater discharges.

Each lot has appropriate means of
disposing stormwater with a proposed
stormwater pipe to collect all runoff from
the development for it to be treated in the
BioRetention Basin.

 

O20 Filling or excavation only occurs where it

does not adversely impact on—

a) watercourses, drainage lines and wetlands,
or

b) vegetation on land identified on Biodiversity
Overlay Maps OM1.1-OM9.1; or

c) water levels on properties elsewhere.

No filling or excavation will occur on any
important areas and there will no impact
on Biodiversity values of the site.

 

Landscaping and visual amenity

 

O21 Land development responds to the
distinctive landscape character of the site by
utilising the natural features of the site, which
include—

a) watercourses and drainage lines;
b) significant trees;

c) understorey vegetation;

d) rock outcrops; and

e) views.

 

 

The natural landform and landscape are
not modified to accommodate the
development.

 

14

 
Log in to download the original file

Planning report 3032stage 6.pdf · 18.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.