Planning report 3032stage 6
Attached to the e-mail REC14/0009 Reconfiguration of Lots - Stage 6 of Erindale Park - email 1.
The original of this document is very large (18.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Sm RIPARIAN BUFFER FROM INVERT
Sm RIPARIAN BUFFER FROM TOP OF BANK
PII tom RIPARIAN BUFFER FROM TOP OF BANK
ee eee
SET TTETETE TTT
LOT OR INFRASTRUCTURE INSIDE RIPARIAN BUFFER
(TOTAL AREA 340 SQUARE METRES)
ADDITIONAL RIPARIAN BUFFER OFFSET (PRELIMINARY AREA
580 SQUARE METRES, SUBJECT TO FLOOD MODELING) WESTERN TRIBUTAR}
EXISTING TOP OF BANK Jf
/
Fono0 FINAL Q100 WESTERN BANK — RIPARIAN BUFFER AREA
———--——— PROPOSED LAY BACK TYPE INVERT LINE KERB & el eaten ed
- y 1 PLANT/1.5m?. CURRENTLY RIPARIAN AREA
CHANNEL M1 TO IPWEAQ STD DWG R-0080 ‘ An/ ae OF BANK LIMITED TO GRASS
== §W—=— propose STORMWATER PIPE Jf! 2 NATURE VEGETATION PRESENT ON BANKS
+ -=R— PROPOSED INTERLOT DRAINAGE PIPE WITH fo = Fo
RAINGARDEN , ee
* —— PROPOSED INTERLOT DRAINAGE PIPE _/ 5 ACTIVE a
WITH PITS / PARKLAND a
685m? Il
PROPOSED BIORETENTION BASIN J.
(omeg PROPOSED VEGETATED
BIO-RETENTION SWALE
YL, NINOR CHANNEL
“ INVERT PROFILING
——— nL Pe
[RIPARIAN BUFFER AREAS
| INFILL PLANTING TO
|| ACHIEVE PLANT DENSITY
| OF 1 PLANT/1.5m?
\y EASTERN TRIBUTARY
USED FOR START
RIPARIAN MAPPING DOWNSTREAM
OF THIS POINT, STREAM BANK
OF BUFFER
15
PREVIOUS BOY
STAGE 5
—
eS 10
‘o
\
[3m WIDE CLEAR AREA
BEHIND LOTS FOR
ACCESS OR SERVICES|}:
aa
24
coy
8 ae
oD
DO
i
w
oo
So
So
11
oy
ww 3
EASTERN BANK — RIPARIAN BUFFER AREA CY ES
PLANT 70% OF AREAS TO ACHIEVE PLANT
DENSITY OF 1 PLANT/1.5m?, REMOVE WEEDS &
7 T £ Eo
ee i Cx
ef 12
6 a
fe
RE
EVIOUS BDY
“>
Fatoo
NO RIPARIAN MAPPING DOWNSTREAM
OF THIS POINT, STREAM INVERT |.
USED FOR START OF BUFFER)
a
Ni
PURPLE_AREA — INFILL PLANTING
REQUIRED FOR 30% OF AREA TO
ACHIEVE 1 PLANT/1.5m?
= 27>
Callaghan & Toth )
Civil, Environmental &
| Hydraulic Engineers
\i
Ni PO BOX 2305
| \\ NOOSA HEADS 4567
Al 8/41. Sunshine Beach Rood
“===])"" Phone 54749081, Fox 54749041
‘www.callaghanandtoth.com.au
designed | ADT | datum AHD DERIVED
drown BM
PSM *
checked _| AH Origin (B.M.) RL *
approved
| |
SURVEYED _BY
MAX WATTERSION é& ASSOCIATES
PHONE 54 426 121
_ a
project
PROPOSED 31 LOT SUBDIVISION
55 LAKE MacDONALD DRIVE
COOROY
$$ $$
Client
VALKEV PTY LTD
—_—_?_ um i i Y
(Coe
RIPARIAN ZONES STAGE 3 & 5
NS
——_————seee—e—v—v——|
LOT 136 on MCH978
Parish of TEWANTIN
County of MARCH
SUNSHINE COAST COUNCIL
Locality of LAKE MacDONALD
Ne
pF!
SCALE
0.5 10 15 20 2 eters. 50
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) DO NOT SCALE FROM THIS DRAWING
. USE ONLY DIMENSIONS PROVIDED
REVISIONS
FILES
COMPUTER DIRECTORY
X:\JOBS\CT Projects in progress\1225 30 lots
lake MacDonald _Drive\Design\\Current_ DWG—BASE
PRELIMINARY
Sheet 1 of 15 sheets
drawing number
1225-33
date 10-3-14 S/S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.