                                             Officer:          Jack Lewis
                                             Direct Telephone: (07) 5449 5183
                                             Response Address: Locked Bag 72
                                                               Sunshine Coast Mail Centre QLD 4560
                                             Email:            [email protected]
                                             Our Reference:    2010/812
                                             Your Reference:
19 July 2010


Altum Constructions
PO Box 2
PEREGIAN BEACH QLD 4573



Dear Sir

                                      Decision Notice
                                  Sustainable Planning Act 2009

I refer to your application and advise that on 12 July 2010 Council decided to approve the application
in full subject to conditions.
Details of the decision are as follows:

1        APPLICATION DETAILS

    Application No:                  2010/812
    Street address:                  20 Tristania Drive MARCUS BEACH
    Real property description:       Lot 85 M11112
    Planning Scheme:                 The Noosa Plan

2        DECISION DETAILS
The following type of approval has been issued:
        Development Permit for Material Change of Use - Multiple Housing Type 2 - Duplex

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this development approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS

Planning Assessment
General
1.       Development undertaken in accordance with this approval must generally comply with the
         approved plans of development. The approved plans are listed in the following table and as
         amended by these conditions.




                                                                                              Page 1 of 17
Full text of the other 16 pages

Page 2

                                                                                            2010/812




      Plan / Document No.       Issue.    Plan / Document Name                           Date
      0912 - CD 1.01            P6        Site Plan Ground Floor – Middap Ditchfield     2 June 2010
                                          Pty Ltd
      0912 - CD 0.04            P2        Easements – Middap Ditchfield Pty Ltd          2 June 2010
      0912 - CD 2.01            P5        Site 20 Ground Floor Plan – Middap             2 June 2010
                                          Ditchfield Pty Ltd
      0912 - CD 2.02            P5        Site 20 First Floor Plan – Middap Ditchfield   2 June 2010
                                          Pty Ltd
      0912 - CD 2.03            P3        Site 20 Roof Plan – Middap Ditchfield Pty      2 June 2010
                                          Ltd
      0912 - CD 4.01            P3        East Elevation – Middap Ditchfield Pty Ltd     2 June 2010
      0912 - CD 4.02            P3        West Elevation – Middap Ditchfield Pty Ltd     2 June 2010
      0912 - CD 4.03            P3        South & North Elevation – Middap Ditchfield    2 June 2010
                                          Pty Ltd

2.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
3.    Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for Operational Works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
4.    The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
5.    The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for Building Works.
6.    The Development Permit for a material change of use lapses if the use has not happened by
      12 July 2014, unless an application to extend the currency is approved by Council.
Building Design
7.    A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of work confirming compliance with the maximum
      allowable building height of 8.0 metres, measures from existing and finished ground level.
8.    Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
      thus remaining as open structures.
9.    External colours and finishes of the building shall comprise muted/environmental tones that
      blend with the natural environment.
10.   Mechanical plant and equipment including pool and spa pumps, pool heaters, air conditioning
      units and refrigeration units shall be screened by fencing or with dense vegetation 1.5 metres
      in height. These shall be visually integrated into the line of the building and roof design and do
      not project beyond the height or width of the building when viewed from the street or other
      properties.
Landscaping
11.   The open space and setback areas are to be landscaped in accordance with Council’s
      Planning Policy 3 - Landscaping Plants & Guidelines using suitable coastal species and a
      properly prepared landscape plan prepared by a suitably qualified Landscape Architect or
                                                                                            Page 2 of 17

Page 3

                                                                                            2010/812




      Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and
      maintained at all times thereafter.
12.   The landscape plans required to be submitted are to denote areas of existing vegetation or
      existing trees proposed or required to be retained and shall include:
      12.1. Native screening vegetation provided within garden beds with a minimum of 500mm
            width along the side and rear boundaries;
                                                                                 2
      12.2. Exclusive clothes drying areas with minimum dimensions of 25m ;
      12.3. Native landscaping to be provided (including the use of large trees equivalent to 60% of
            the height of the building on maturity) to screen the southern boundaries of the site with
            the adjoining building;
      12.4. A minimum of 2 x 45 Litre native street trees shall be established on the frontage within
            the road reserve and include the following species:
       SMALL STREET TREES IN COASTAL AREAS UNDER POWER LINES
          Acronychia imperforata                      Fraser Island apple
          Alectryon coriaceus                         Beach birds eye
          Acmena hemilampra                           Broad leafed lilly pilly
          Banksia aemula                              Wallum banksia
          Banksia integrifolia
          Casuarina glauca                            Swamp sheaok
          Elaeocarpus reticulatus                     Blue berry ash
          Eucalyptus bancrofftii                      Tumbledown gum
          Grevillea banksii                           Red flowering silky oak
          Petalostigma pubescens                      Quinine berry

13.   Existing trees on the site and within road reserves are to be retained, except where required to
      be removed due to building operations or the conduct of the approved use.
14.   Cleared vegetation is to be suitably processed by one of the following methods and removed
      from the site:-
      14.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
            loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
            minimum of 10 metres between edges of heaps.
      14.2. Disposal for firewood.
      14.3. Disposal for landscaping purposes.
      14.4. Transport to alternative site for breaking down materials provided that all necessary
            permits have been obtained to allow the alternate site to be used for this purpose.
      14.5. The disposal method for clearing works is to be submitted in conjunction with an
            application for a Development Permit for Operational Work. The Applicant is advised
            that other methods may be considered provided full details of the method are submitted.
      The Applicant is advised that burning off is an unacceptable method of disposal.
Fencing
15.   All fencing shall be setback at least 1 metre from the front property boundary, with at least half
      of the fencing setback 2 metres. The area of land between the fence and the front property
      boundary shall be densely landscaped to screen any fencing from the street.


                                                                                            Page 3 of 17

Page 4

                                                                                           2010/812




Noise Nuisance
16.   Noise emission from mechanical equipment shall comply with the following requirements:
      16.1. Air-conditioning and Refrigeration:
                7am to 10pm: Maximum background + 5dB(A)
                10pm to 7am: Maximum background + 3dB(A)
      16.2. Pumps:
                7am to 7pm: Maximum background + 5dB(A)
                7pm to 10pm: Maximum background + 3dB(A)
                10pm to 7am: No audible noise.
17.   Submission of written certification shall be provided from a suitably qualified person confirming
      that the noise levels from all mechanical equipment comply when measured at either the
      residential boundary or outside the most exposed part of an affected building, whichever is the
      closest to the equipment.
      The assessment and certification is required immediately after installation of the equipment
      and prior to any occupation of the building, and in a format approved by Council. All
      equipment should be operating at the same time to test the overall noise level created.
      Advice: It is highly recommended that the person you engage to certify the installation is
      involved at the plan development stage so they can recommend where this equipment is best
      located. They can also advise about noise enclosures and can make other suggestions to
      avoid noise problems. It is a lot more costly to try and deal with noise problems after
      everything is built.
18.   Noise from residential building works shall comply with the following –
      18.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
      18.2. All reasonable measures are taken to minimise noise emissions.
      18.3. Not permitted on Sunday or public holidays.
Infrastructure Contributions
19.   The applicant must pay contributions towards trunk infrastructure in accordance with the
      following Planning Scheme Policies and Council Policies:
      (a)   Planning Scheme Policy 12 – Public Open Space Contributions;
      (b)   Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
      (c)   Planning Scheme Policy 16 – Sewerage Headworks Contributions;
      (d)   Planning Scheme Policy 17 – Water Supply Headworks Contributions;
      (e)   Planning Scheme Policy 20 – Pathway Trunk Network Contributions;
      (f)   Council Policy – Rural Roadworks Contributions;
      (g)   Council Policy – Master Drainage Contributions.
      For material change of use of premises approvals the contributions must be paid prior to the
      commencement of use, for reconfiguring a lot approval contributions must be paid prior to
      Council approval of the plan of subdivision.
      The actual amount of the contribution must be calculated and paid in accordance with the
      Planning Scheme Policies and variations due to indexation current at the time of payment.




                                                                                           Page 4 of 17

Page 5

                                                                                            2010/812




Operational Works Assessment

Vehicle Access
20.   A vehicular access driveway to serve the development on Lots 84 and 85 M11112 (Numbers
      22 & 20 Tristania Drive respectively) shall be constructed from the Tristania Drive frontage of
      the site generally as shown on drawing number Drawing No CD 1.01 P6 Project No 0912
      dated 2 June 2010 by Middap Ditchfield Pty. The first 6m of the driveway measured from the
      kerb line in Tristania Drive shall be 5.5m wide to allow for car passing opportunities.
21.   The driveway shall be designed and constructed to Council’s design standards and to grades
      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
      movements along the footpath without any step or level difference. Should any driveways be
      constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
      the driveway be removed and reconstructed to levels that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
      trip or fall.
Vehicle Access Easement
22.   A reciprocal vehicle access easement shall be created on Lots 84 and 85 M 11112 to
      encompass all the proposed driveway and vehicle turning areas generally as shown on
      Drawing No CD 0.04 P2 project No 0912 dated 2 June 2010 by Middap Ditchfield Pty Ltd.
      In this regard, plans submitted for Operational Works approval shall accurately show the
      location of the easement. In addition, the Applicant’s Solicitor shall give Council’s Solicitor an
      appropriate undertaking in writing that the Title Deed and the easement documents will be
      lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring
      the consent of Council will be attended to promptly.
      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing. Any changes required by Council’s Solicitor must be corrected immediately.
      All legal and administration costs shall be paid by the developer.
Car Parking
23.   Carparking shall be provided within the site generally as shown on drawing number Drawing
      No CD 1.01 P6 Project No 0912 dated 2 June 2010 by Middap Ditchfield Pty Ltd, except as
      modified by these conditions.
24.   The driveway, garages and carparking areas shall be designed to comply with the provisions
      of AS/NZS 2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the
      site in a forward gear in three movements, with a minimum head clearance (headroom) at any
      point of 2.3m.
Frontage Works
25.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      Tristania Drive frontage of the site in accordance with Planning Scheme Policy PSP03
      Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
26.   A new 1.5m wide concrete path shall be constructed along the Tristania frontage of the site in
      accordance with Council’s design standards and to an alignment that protects any significant
      vegetation or any underground services and to smoothly join any existing pathway.
27.   All paths, driveways and parking areas associated with this development shall be designed
      and constructed to ensure pedestrian safety using non-slip materials, to produce an evenly
      graded surface finish, and to be in accordance with the Disability Discrimination Act 1992 and
      Australian Standard 1428.1 - Design for Access & Mobility.
28.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
      footpath paving and landscaping such as trees and grasses in accordance with Council’s
      Standard specifications prior to commencement of the use permitted by this permit.
                                                                                            Page 5 of 17

Page 6

                                                                                              2010/812




Roof Water & Stormwater Drainage
29.   Roof runoff from any new building shall be directed to a rainwater storage system or tank that
      is installed within the property to ensure water from the rainwater storage system or tank is
      used for external uses (such as watering gardens, irrigation, ornamental ponds, water
      features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use
      in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
      installed in accordance with the Queensland Development Code (QDC) current at the time of
      building approval, and shall be part of the plumbing application for approval. The location and
      capacity of the tanks shall be clearly shown on the plans submitted for Building Works and
      Operational Works approvals and any overflow shall be discharged into the existing
      stormwater system (stormwater structure or kerb & channel) at Tristania Drive.
30.   All stormwater drainage (including roof water overflow from the rainwater storage system)
      shall be collected and discharged so there is no net increase in stormwater runoff from the
      site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s:
      existing drainage system (kerb & channel or/and stormwater structures) in Tristania Drive
      generally as shown on drawing No 10031 -2 A dated 20 May 2010 by Ian Bradford. Detailed
      plans of the drainage design for operational works shall be prepared by a suitably qualified
      and experienced person and submitted to Council prior to obtaining a Development Permit for
      Operational Works.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
      drainage system at any one location is 25 litres/second.
31.   The applicant shall modify the existing kerb inlet pit on the frontage of the site to a grated inlet
      pit.
32.   The applicant shall construct a new grated kerb inlet pit upstream of the proposed access
      driveway and link to the existing pit by a 375mm RCP pipe.
33.   The driveway construction shall cater for a stormwater secondary flowpath over the driveway
      and a gap 4m wide and at least 120mm high shall be provided under the rear fence in
      accordance with the recommendations of the stormwater drainage investigation report dated
      24 May 2010 Ref 0812 by Covington Engineers.
34.   The development shall not cause diversion of stormwater or adversely impact on the existing
      drainage conditions on adjoining properties or the road reserve.
35.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking areas and the driveways shall have the first flush (the
      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap
      provided on site prior to being permitted to discharge into Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system, bypassing
      the grease/oil arrestor/gross pollutant trap.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
      obtaining a Development Permit for Operational Works.
      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved use.
      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
36.   All site stormwater drainage shall be by means of a gravity system.




                                                                                             Page 6 of 17

Page 7

                                                                                             2010/812




37.   The existing 300mm stormwater drainage pipeline on the site shall be inspected by closed
      circuit television (CCTV) prior to the commencement of the civil works on the site, any existing
      damage or blockage shall be rectified by the developer prior to the construction of the
      driveway. Also, following satisfactory completion of the construction works all new stormwater
      pipelines that will be a Council’s asset and stormwater inter-allotment drainage shall be
      inspected by CCTV.
      CCTV inspections will be carried out by Council's CCTV contractor and arranged by Council.
      The developer will be responsible for the full cost of CCTV inspections, including any
      additional inspection necessary following defect identification and rectification. This charge is
      payable prior to the issue of Operational Works approval and will be determined on the unit
      rate basis current at the time of approval.
Service Easements on Lot 85 M11112 (Stormwater)
38.   A registered easement shall be required over any stormwater drainage pipes or overland flow
      paths within the site that convey stormwater from a Council road. The easement shall be in
      favour of Council, be a minimum of 3 metres wide within the site and be located adjacent to
      the northern boundary of the subject site.
      The Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that
      the Title Deed and the easement documents will be lodged at the Land Titles Office and any
      additional Titles Office forms or requisitions requiring the consent of Council will be attended to
      promptly. A duly executed copy of the easement shall be submitted to Council for perusal prior
      to the use commencing. Any changes required by Council’s Solicitor must be corrected
      immediately.
39.   No building or other structure shall be constructed or encroach over an easement.
Earthworks
40.   All earthworks (filling or excavation) required on site shall be carried out in accordance with
      Council’s Planning Scheme Policy PSP5 – Engineering Design Standards. Filling on the site
      shall not cause any additional ponding of water on any adjoining lands or the blockage of, or
      interference with, any natural watercourses.
41.   Any imported fill to the site may only be from a site licensed with The Environmental Protection
      Agency or from a site for which a Development Permit for Operational Works has been issued
      approving the export of fill.
42.   Earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences or structures that border the development site. Fences that are affected shall be
      replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
      any fences to be replaced shall be clearly shown on the plans submitted for Operational
      Works approval.
Erosion and Sediment Control
43.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to
      be submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works.
General Engineering Requirements
44.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works that will become Council infrastructure, which shall be
      submitted in conjunction with an application for a Development Permit for Operational Works.
      In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
      submitted in conjunction with any application for Operational Works.


                                                                                            Page 7 of 17

Page 8

                                                                                            2010/812




45.   Digital detailed designs including drawings, calculations, specifications and a schedule of
      works shall be submitted with any application for a Development Permit for Operational Works
      in respect of roadworks and stormwater drainage works. The design shall be in accordance
      with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards – Roads,
      Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing
      and proposed services required by the development shall be shown on the plans.
46.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).
47.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
48.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
49.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
50.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
      type of all services and structures. All of which shall be submitted to Council for checking and
      for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au). Approval of works shall not be granted until all As
      Constructed information has been supplied and accepted by Council.
Unity Water
51.   Reticulated water supply and sewerage must be provided to the development.
52.   Separate 25mm PE water services must be installed to a common lot boundary with
      independent meters installed outside the boundary of the lot in accordance with Sunshine
      Coast water standard drawing SCW 361. Meters must be “Elster” PSM 50100/39 (dual
      check).
53.   The sewer inspection opening must be located a minimum of 1.0 metre from any structure and
      be raised to the finished surface level of the site. If located within the paved driveway area the
      inspection opening must be finished with a brass cap.
54.   Storm water retention systems and gross pollutant traps must maintain a minimum clearance
      of 1.5 metres from Council water supply and sewerage infrastructure .
55.   Landscape planting within 1.5 metres of Council sewerage infrastructure must be Council
      approved varieties and low growing when mature.
56.   Construction works undertaken in the vicinity of Council water supply or sewerage
      infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
      with repair, replacement or alteration of infrastructure must be met by the applicant.




                                                                                            Page 8 of 17

Page 9

                                                                                              2010/812




5     REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Reason for           Relevant                Referral        Referral           Agency Address
 Referral             Regulation              Type            Agency
 Material change      Sustainable             Concurrence     DERM           Department of
 of use -             Planning Regulation                                    Environment and
 Contaminated         2009 - Schedule 7,                                     Resource Management
 land (unexploded     table 3, item 11                                       Ecoaccess Customer
 ordnance)                                                                   Service Unit
                                                                             PO Box 15155
                                                                             CITY EAST QLD 4002

A copy of any referral agency conditions is attached.

6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:

 Plan / Document No.      Issue.    Plan / Document Name                               Date
 0912 - CD 1.01           P6        Site Plan Ground Floor – Middap Ditchfield Pty     2 June 2010
                                    Ltd
 0912 - CD 0.04           P2        Easements – Middap Ditchfield Pty Ltd              2 June 2010
 0912 - CD 2.01           P5        Site 20 Ground Floor Plan – Middap Ditchfield      2 June 2010
                                    Pty Ltd
 0912 - CD 2.02           P5        Site 20 First Floor Plan – Middap Ditchfield Pty   2 June 2010
                                    Ltd
 0912 - CD 2.03           P3        Site 20 Roof Plan – Middap Ditchfield Pty Ltd      2 June 2010
 0912 - CD 4.01           P3        East Elevation – Middap Ditchfield Pty Ltd         2 June 2010
 0912 - CD 4.02           P3        West Elevation – Middap Ditchfield Pty Ltd         2 June 2010
 0912 - CD 4.03           P3        South & North Elevation – Middap Ditchfield Pty    2 June 2010
                                    Ltd

7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
General
1.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
      the cost of operational works exceeds $80,000, then a portable long service leave levy is
      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
      the approved form issued by the Building and Construction Industry (Portable Long Service
      Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
      declaration outlining the cost of the operational works must be submitted to Council with the
      lodgement of any application for operational works over the site.
2.    The development should be undertaken in a manner that causes no detrimental effect upon
      the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
      borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
      emissions in accordance with the nuisance provisions of the Environmental Protection
      Regulation 1998 or Council’s Local Law No. 12 – Control of Nuisances.
                                                                                              Page 9 of 17

Page 10

                                                                                               2010/812




3.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
      cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
      where it could reasonably be expected to move into a roadside gutter, storm water drain or a
      watercourse. On the spot fines apply for such offences.
4.    The applicant is advised that a Compliance Permit for all plumbing and drainage works within
      the boundaries of the development site shall be obtained from Council’s Plumbing Services
      Section prior to obtaining a Development Permit for Building Works.
5.    It is recommended that applications for Operational Works for permit 2010/0811 on Lot 84
      M11112 and permit 2010/0812 on Lot 85 M 11112 should be combined.
Water & Sewerage
6.    Connection to Council live water mains must be undertaken by Council at the applicants cost.
7.    Water meters must be located on alternative boundaries to power boxes.
8.    Water meters approved for use in the Sunshine Coast region may be purchased direct from
      “Elster” and installed by the developer, or Council can provide the meters and undertake the
      works. Meters must be “Elster” PSM 50100/39 (dual check). Council's quotation for the works
      will be prepared upon request.
Infrastructure Contributions and Infrastructure Charge
9.    An advice notice outlining the estimated infrastructure contributions payable and the basis for
      their calculation under the current Planning Scheme Policies and Council Policies is attached
      with this Development Permit.
10.   The applicant is informed that this development permit will trigger an Infrastructure Charge in
      accordance with the Coastal Major Road Network Infrastructure Charges Plan for the
      estimated amount of $4,174.00 and is subject to variations in the Consumer Price Index, All
      Groups Brisbane from March 2010 until the date of payment. An Infrastructure Charge Notice
      will be issued in accordance with Chapter 8 of the Sustainable Planning Act 2009.
11.   Please        contact      Council's     Infrastructure    Charges      Officer      (email:
      [email protected]) a minimum of 5 business days prior to payment of the
      infrastructure contributions and/or charge notice so a payment advice detailing the amounts
      applicable at the time of payment may be issued to accompany the payment.
12.   Payment of infrastructure contributions and/or infrastructure charge notices will not be
      accepted by credit card transaction.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable.

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable.
                                                                                             Page 10 of 17

Page 11

                                                                                             2010/812




10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 Development Permit                                  Operational Works for Access and Carparking,
                                                     Stormwater Drainage, Frontage Works, Landscaping,
                                                     and Erosion & Sediment Control
 Development Permit                                  All Building Works

11     SELF ASSESSABLE CODES

Not applicable.
12     SUBMISSIONS

Not applicable.

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable.

14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Sustainable Planning Act 2009 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a “negotiated decision notice” will be
issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal
period, which will commence again from the start the day after you receive a “negotiated decision
notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing
decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act
2009.)

15     OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,




Denis Wallace
Senior Development Planner



Enc:    Appeal Rights
        Referral Agency Response
        Approved Plans/Documents
        Infrastructure Contributions Advice Notice
        Infrastructure Charge Notice

c.c:    Department of Environment and Resource Management
        Ecoaccess Customer Service Unit
        PO Box 15155
        CITY EAST QLD 4002


                                                                                           Page 11 of 17

Page 12

                                           2010/812



Referral Agency Conditions
SUNSTAINABLE PLANNING ACT   2009   &   SUSTAINABLE
PLANNING REGULATION 2009




                                         Page 12 of 17

Page 13

  2010/812




Page 13 of 17


[OCR of page images]
2010/812

 

gee

tae

BN
.
sce
Notice
Concurrence Agency Response

3. General advice to assessment manager

_ Pursuant to sections 334 and 363 of the Act, a copy of a decision notice or negotiated decision notice issued
by the assessment manager must be forwarded to DERM as a referral agency for the relevant application at:

Permit and Licence Management

Implementation and Support Unit

Department of Environment and Resource Management
GPO Box 2454, Brisbane QLD 4001

and an electronic copy to [email protected] State's Native Title Work Procedures provide that responsibility for assessment of native title issues for

an IDAS application rests with the assessment manager. Therefore, DERM as a referral agency for the

releyant application hag not provided notifi ation to native title parti ; :
Ae Py ot ponte cose gg ae gk

  

4. Additional information for applicants

Contaminated Land: It is a requirement of the Environmental Protection Act 1994 that if an owner or
occupier of land becomes aware of a Notifiable Activity (as defined in Schedule 3 and Schedule 4 of the
Environmental Protection Act 1994) is being carried out on the land, or that the land has been, or is being,
contaminated by a hazardous contaminant, the owner or occupier must, within 22 business days after
becoming so aware, give written notice to DERM.

5, Reasons for inclusion of development condition/s or refusal
{In accordance with section 289 of the Sustainable Planning Act 2009 and section 278 of the Acts Interpretation Act
1954, a concurrence response must include reasons for a refusal or for the inclusion of development conditions.)

The site (the subject lot/s) is part of an area of land within which the Department of Defence (Defence) has
. assessed a ‘substantial’ risk of residual UXO contamination exists. Visit the Defence website
http://Awww.defence.gov.au/uxo/ for details.

Defence advises that development or land use rezoning proposals for land within a ‘substantial’ zone should
only proceed fallowing the conduct of UXO investigation and clearance activities. Defence maintains a list of
commercial UXO investigation and remedial search contractors that it accredits to carry out this work.

Defence also recommends that owners or occupiers of potentially affected land and workers and contractors
employed on the land need to be aware of the procedure if a suspect object is found.

As DERM has no record of the site being further investigated or remediated, it is considered that there
remait a possibility of UXO being found onit. , 1

  

Ranald Stott SS

Delegate, Chief Executive administering . Enquiries:

the Sustainable Planning Act 2009 . Ranald Scott

Department of Environment and Resource Management DERM

(DERM) . Level 1, The Esplanade, Maroochydore QLD
a PO Box 168, Cotton Tree, QLD 4558

30 June 2010 Phone: 075459 6129 Fax: 07 5443 9927
: : _ Email: [email protected]
‘ & Bs.

   

 

:Attachment::Conditions .
LAL Ct SO] 2 weed
~ Page’2 of 4 + 091217 Department of Environment and Resource Management

Page 13 of 17

Page 14

  2010/812




Page 14 of 17


[OCR of page images]
2010/812

 

a

 

Notice——__.
Concurrence Agency Response

CONDITIONS

The following concurrence agency conditions are to be attached to any approval:

1 Prior to the commencement of any development-related excavation, earthworks or soil disturbance,
that part of the site to be so worked is to be subjected to investigation and, where necessary,
appropriate remedial action. ~

2 -_ Any person employed to work on any part of the site where Condition 1 has not been satisfied is to
be forewarned in writing by the applicant.

This warning.is to explain that information available to DERM indicates a potential for residual UXO
-exists on the site‘and work. should preceed-with-due caution: ‘Itis- to-state-the-precedure-to be +
followed by any person finding an object suspected of being Sxl ordnance or component
thereof:

Do not disturb the object.

Take action, where appropriate, to preventit being disturbed by another person.
Note its approximate dimensions and general appearance.

Note the route to its focation.

Advise the Police as soon as possible.

3 Following investigation and any remedial action taken to-satisfy Condition 1 above, the applicant is to
submit a report, prepared in accordance with current guidelines, to DERM for assessment. DERM is
to subsequently advise the Sunshine Coast Regional Council and the applicant of its assessment in
regard to Condition 1 being satisfied.

4 Prior to Condition 3 being satisfied, no excavated gravel, rock, sand or soil is to be removed from the
site without written DERM approval.

5 The applicant is to advise the owner and any occupier of the site of the above responsibilities. -

General comments or advice about applications concerning land potentially affected by UXO

Applicants may. contact DERM'’s Project Manager (UXO) or visit Defénce’s website
http://www.defence.gov.au/uxo/ for the details of current UXO investigation and remedial search contractors.
DERM accepts reports based on investigative and remedial work carried out by these contractors.
Investigation and remedial action to satisfy Condition 1 typically involves sampling/search programs with
detection equipment unless the use of such equipment is:

* considered unwarranted by a UXO contractor due to the extent of any prior excavation or
earthworks or, conversely, of any filling proposed as part of the development Program; or

* prevented or made impracticable by the presence of a structure, stockpile, natural barrier or metal
waste.

In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For

example, where the risk of exposure to any UXO that may exist is reduced by the presence of a structure or

natural barrier, issuance of the standard UXO warning (see Condition 2) may suffice while the structure,
-#Stockpile or barrierremains in:place..Where.a:structure is.to:be removed or reduced as part of the
#development program, protective'precautions, commensurate with any greater risk to which workers might

 

Page 3 of 4 + 091217 . Department of Environment and Resource Management

Page 14 of 17

Page 15

  2010/812




Page 15 of 17


[OCR of page images]
2010/812

 

"s

‘

Notice
' Concurrence Agency Response

then be exposed, may need to be considered. Progressive assessment will be necessary where. such
* circumstances exist. Unless, at the completion of preliminary works, there is evidence then available to the
“UXO contractor that any residual risk is negligible, the use of detection equipment will typically be required
to confirm the site's status. .

Where investigation, along with any subsequent remedial action and assessment, is to be implemented by

stages to satisfy Condition 1 and 3, a preliminary investigation report should be submitted by the applicant to

DERM along with a management plan for the proposed work. Staged investigation/remediation is most likely

to be applicable where development of smaller, built-on lots (which can present circumstances such as those .
discussed above) or broadhectare sites is proposed. In such cases, DERM's assessment of the report and \
advice to Council in regard to approval of the development will be dependent on agreement with the

management plan.

Where Condition 1 is to-be satisfied by a whole lot or broadhectare development stage being subjected to
investigation and any necessary remedial action, DERM, based on the subsequent investigation/remediation
report's findings and recommendation/s, may reassess the lot, or that portion comprising the development
stage, as being remediated or not needing remediation, and advise the applicant and Council accordingly.
Otherwise, any balance of land that has not been further investigated will retain the risk assessment made by
Defence and DERM's Area Management Advice will continue to apply. This is unless evidence obtained from
the investigated part/s can be used to refute Defence’s assessment in regard to all or part of the balance. In
the latter case, DERM may reassess all of the balance or the applicable part/s as being unaffected by UXO.

 

 

END OF CONDITIONS
. ¥ ’ %
%
hy aes
ae ws Boe
Page 4 of 4 + 091217 Department of Environment and Resource Management.

Page 15 of 17

Page 16

                                                                                                    2010/812



                                                  Appeal Rights
                                                 SUNSTAINABLE PLANNING ACT       2009   &    SUSTAINABLE
                                                 PLANNING REGULATION 2009




The following is an extract from the Sustainable                     (ii) the length of a period mentioned in
Planning Act 2009 (Chapter 6).                                            section 341 for the approval.
                                                          (3)    However, a submitter may not appeal if the
MATERIAL CHANGE OF USE, RECONFIGURING A                          submitter—
LOT & OPERATIONAL WORKS
                                                                 (a) withdraws the submission before the
Division 8 - Appeals to court relating to                            application is decided; or
development applications
                                                                 (b) has given the assessment manager a
461     Appeals by applicants                                        notice under section 339(1)(b)(ii).
(1)     An applicant for a development application        (4)    The appeal must be started within 20
        may appeal to the court against any of the               business days (the submitter’s appeal
        following-                                               period) after the decision notice or
        (a) the refusal, or the refusal in part, of a            negotiated decision notice is given to the
           development application;                              submitter.
        (b) any condition of a development approval,      463   Additional and extended appeal rights for
           another matter stated in a development               submitters for particular development
           approval and the identification or inclusion         applications
           of a code under section 242                    (1)    This section applies to a development
        (c) the  decision to give a preliminary                  application to which chapter 9, part 7
           approval when a development permit was                applies.
           applied for;                                   (2)    A submitter of a properly made submission
        (d) the length of a period mentioned in                  for the application may appeal to the court
           section 341;;                                         about a referral agency’s response made by
        (e) a deemed refusal of the development                  a prescribed concurrence agency for the
           application.                                          application.
                                                          (3)    However, the submitter may only appeal
(2)     An appeal under subsection (1)(a), (b), (c) or
                                                                 against a referral agency’s response to the
        (d) must be started within 20 business days
                                                                 extent it relates to—
        (the applicant’s appeal period) after—
        (a) if a decision notice or negotiated decision          (a) if the prescribed concurrence agency is
            notice is given—the day the decision                     the chief executive (environment)—
            notice or negotiated decision notice is                  development for an aquacultural ERA; or
            given to the applicant; or                           (b) if the prescribed concurrence agency is
        (b) otherwise—the day a decision notice was                  the    chief   executive      (fisheries)—
            required to be given to the applicant.                   development that is—
(3)     An appeal under subsection (1)(e) may be                     (i)  a material change of use of
        started at any time after the last day a                          premises for aquaculture; or
        decision on the matter should have been                      (ii) operational work that is the removal,
        made.                                                             damage or destruction of a marine
                                                                          plant
462     Appeals by submitters - general
                                                          (4)    Despite section 462(1), the submitter may
(1)     A submitter for a development application
                                                                 appeal against the following matters for the
        may appeal to the court only against-
                                                                 application even if the matters relate to code
        (a) the part of the approval relating to the             assessment—
           assessment manager’s decision about
                                                                 (a) a decision about a matter mentioned in
           any part of the application requiring
                                                                     section 462(2) if it is a decision of the
           impact assessment under section 314; or
                                                                     chief executive (fisheries);
        (b) the part of the approval relating to the
                                                                 (b) a referral agency’s response mentioned in
           assessment manager’s decision under
                                                                    subsection (2).
           section 327.
                                                          464   Appeals by advice agency submitters
(2)     To the extent an appeal may be made under
        subsection (1), the appeal may be against 1       (1)    Subsection (2) applies if an advice agency, in
        or more of the following—                                its response for an application, told the
                                                                 assessment manager to treat the response
        (a) the giving of a development approval;                as a properly made submission.
        (b) any provision of the approval including—      (2)    The advice agency may, within the limits of its
           (i)    a condition of, or lack of condition           jurisdiction, appeal to the court about—
                  for, the approval; or


                                                                                                  Page 16 of 17

Page 17

                                                                                            2010/812

      (a) any part of the approval relating to the    467    Appeals about changing or cancelling
         assessment manager’s decision about                 conditions imposed by assessment
         any part of the application requiring               manager or concurrence agency
         impact assessment under section 314; or      (1)    A person to whom a notice under section
      (b) any part of the approval relating to the           378(9)(b) giving a decision to change or
          assessment manager’s decision under                cancel a condition of a development approval
          section 327                                        has been given may appeal to the court
(3)   The appeal must be started within 20                   against the decision in the notice.
      business days after the day the decision        (2)    The appeal must be started within 20
      notice or negotiated decision notice is given          business days after the day the notice of the
      to the advice agency as a submitter.                   decision is given to the person.
(4)   However, if the advice agency has given the     For Building Works Only
      assessment manager a notice under section       532    Appeals by applicants
      339(1)(b)(ii), the advice agency may not
      appeal the decision.                            (1)    If—
465   Appeals about decisions         relating   to          (a) a person has been given, or is entitled to
      extensions for approvals                                  be given—
(1)   For a development approval given for a                     (i)       an information notice under the
      development application, a person to whom a                          Building Act about a decision
      notice is given under section 389, other than                        other than a decision under
      a notice for a decision under section 386(2),                        that Act made by the
      may appeal to the court against the decision                         Queensland Building Services
      in the notice.                                                       Authority; or
(2)   The appeal must be started within 20                       (ii)      an information notice under the
      business days after the day the notice of the                        Plumbing and Drainage Act
      decision is given to the person.                                     2002 about a decision under
                                                                           part 4 or 5 of that Act; or
(3)   Also, a person who has made a request
      under section 383 may appeal to the court              (b) a person—
      against a deemed refusal of the request                    (i)       was an applicant for a building
(4)   An appeal under subsection (3) may be                                development approval; and r
      started at any time after the last day the                 (ii)      is dissatisfied with a decision
      decision on the matter should have been                              under the Building Act by a
      made.                                                                building certifier or referral
                                                                           agency about inspection of
466   Appeals about decisions         relating   to
                                                                           building work the subject of the
      permissible changes)
                                                                           approval; the person may
(1)   For a development approval given for a                               appeal against the decision to
      development application, the following                               a building and development
      persons may appeal to the court against a                            committee.
      decision on a request to make a permissible
                                                      (2)    An appeal under subsection (1) must be
      change to the approval—
                                                             started within 20 business days after the day
      (a) if the responsible entity for making the           the person is given notice of the decision.
         change is the assessment manager for
                                                      (3)    If—
         the application—
                                                             (a) under the Building Act, a person makes
         (i)   the person who made the request;
                                                                  an application other than a building
               or                                                 development application to a local
         (ii) an entity that gave a notice under                  government; and
               section 373 or a pre-request                  (b) the period required under that Act for the
               response notice about the request
                                                                  local government to decide the
      (b) if the responsible entity for making the                application (the decision period) has
          change is a concurrence agency for the                  passed; and
          application—the person who made the                (c) the local government has not decided
          request..                                               the application; the person may appeal
(2)   The appeal must be started within 20                        to a building and development
      business days after the day the person is                   committee against the lack of the
      given notice of the decision on the request                 decision and for the committee to decide
      under section 376.                                          the application as if it were the local
(3)   Also, a person who has made a request                       government.
      under section 369 may appeal to the court       (4)    An appeal under subsection (3) must be
      against a deemed refusal of the request.               started within 20 business days after the end
(4)   An appeal under subsection (3) may be                  of the decision period..
      started at any time after the last day the
      decision on the matter should have been
      made.

                                                                                          Page 17 of 17

Used in these records

About this file

File size
295 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPA Decision Notice - 010.2010.00000812.001 [As Published].pdf · 295 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.