NOTES
EXISTING SERVICES
The Landscape Contractor shall determine the location of all services on site before
commencing construction. Positions of services shown on the drawings are indicative only.
PREPARATION OF NEW TURF AREAS Plants to be installed in locations and at spacing indicated on the drawings. Plants located on
1. Eradicate all weeds and grass from area. slopes or embankments shall be installed at an angle of 90 degrees to the slope. Planting holes
2. Cultivate to 150mm depth. shall be excavated to a width of twice the diameter of the root ball of the plant and to a minimum
3. Supply and spread 50mm minimum depth of sandy loam topsoil. depth of 100mm deeper than the height of the plant container. Holes to be filled with water and
4. Grade surface to smooth even finish free of mounds and hollows. allowed to drain prior to installing plants.
5. Fertilize area with fertilizer of NPK Ratio 14:15:10 not less than 7 days prior to planting. Water crystals shall be incorporated in wet planting soil.
6. Turf with Zoysia macrantha MAC03 (Nara Native Turf). Turfs to be closely butted with Slow release fertilizer with low Phosphorous formulation (’Osmocote’ or similar) shall be
cross joints staggered. placed in the planting hole at half the hole depth around the root ball in accordance with the
manufacturer’s recommended rate of application.
PREPARATION OF PLANTING AREAS Staking or guying shall only be provided where necessary to protect plant from strong wind or
1. Eradicate all weeds and grass from planting areas. accidental damage.
2. Strip and stockpile any useable topsoil.
3. Box out to minimum 300mm to accommodate topsoil and mulch. IRRIGATION
4. Cultivate planting area sub-grade to minimum 200mm depth to maximize soil drainage. Micro-irrigation shall be a sub-surface drip-line system using pressure-compensating emitters
5. To prevent water-logging, install sub-surface drainage system where sub-soils are and shall be installed in all planting areas in accordance with manufacturer’s recommendations.
impervious. Installer shall provide owner with an operational manual including diagram showing location and
6. Supply and spread 200mm depth of humus-enriched sandy loam topsoil, incorporating layout of irrigation.
any stockpiled topsoil. Finish 75mm below paved areas to allow for depth of mulch.
7. Mulch planting areas with 75mm minimum depth of heavy, curly Hoop Pine Bark, Hoop MAINTENANCE PERIOD
Bark Fines, or 20mm Washed River Pebbles where indicated on drawings. The Landscape Contractor shall maintain all landscape areas for a period of six (6)months
from the date of completion of landscape construction.
MATERIALS All areas shall be kept free of weeds, unwanted grasses and litter during this period.
Imported topsoil shall comply with AS4419 and shall not contain chemicals that will result in Maintenance shall include fertilizing of plants, control of any diseases or pests and replacement
contamination of land (e.g. heavy metal, hydrocarbons, pesticides, etc.). Soils must not contain of unhealthy plants where necessary.
fire ants or nesting materials. The micro-irrigation system shall be regularly checked for appropriate watering of all planting
Mulch shall be free from soil, clay, dust, weeds, roots, sticks, rubbish, vermin, pests, fungus, areas with any necessary adjustments made or any malfunction attended to immediately.
disease and other deleterious material. It shall be free from matter toxic to plant growth.
Gympie Sandstone and Sandstone Boulders shall be free of toxic or deleterious material.
They shall be placed securely in the ground to present a natural appearance where indicated on
the drawings. Rocks adjacent to mown turf track shall provide safe, comfortable, flat surfaces
for pedestrian access from roadside kerb to lawn.
Crushed Gympie Sandstone shall be clean and free of toxic or deleterious material.
GREEN ROOF
Construction shall be as recommended for extensive green roofs and shall have minimum
100mm profile. Lightweight materials shall include a base layer of waterproofing material
followed by a drainage layer covered with geotextile membrane.
Planting medium shall be 80-100mm depth lightweight podium mix consisting of washed
coarse sand, well composted organics, scoria or horticultural ash and an environmentally safe
water absorbing material e.g. Hydrocell or similar. The planting medium shall meet with all the
requirements of AS 3743 Potting Mixes for Premium Potting Mix.
PLANTING
Plants shall be container grown, well formed, pest and disease free, hardened nursery stock
true to species or cultivar required. Root balls shall fill containers without binding and plants
shall show active healthy growth. Pruning, budding or grafting scars shall be clean and well
calloused. Plants to be watered in their containers prior to planting.
Use figured dimensions
Rev. Date Description in preference to scale. All _& J!l
0 ~~ ~~~~ Project Drawing Title Project No.
-~~~~~~
26.05.11
11.02.13
Issue to Builder
Issue for Landscape Operational Works
dimensions to be varified
and checked on site.
These
designs,drawin~s.
specifications and t e
Member
Au,tr.Hll’lhnHtute
ofArchitKts
~
:;:
e
<{
~~:~g,g,3
~~ n,j!
Lan10rm Warren Residence
Sunshine Beach
Landscape Plan
Notes
Drawing No.
1055
!~
78ar~
thereof are the RAIAMember c
COpyri~t
~\~P a~~ ~u~t ~~~ig~
t
28409
’"
ii
Q)
"0
c~
s::.c-
~
U"I"O
Grahame & Carol Warren CD.801
used, retained or copied Architects D ~.!!Sl!" :!~ Revision
without the wntten Aegistration No. :>< ~E(!)c( )(
Date April 2011 Scale N/A
authority of Bark Design 3664 (LA) (;j fi"~~~iiS~ 2
Pty Ltd. 3668 (SG) ID ~u.U :::;UJ~~O
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - Plans - OPW13/0142Related documentApplication case desk ↗
About this file
- File size
- 13.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.