Skip to the record
The only place to find full transcripts.

Council archive · source document

Attachment 1 - Proposal Plans · 51987.2949.6

of 9

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
LEGEND :
                                                                                                                                                  Add power points
: EXISTING ITEMS                                                                                                                                  in new mirror cabinet
                                   Under-floor heating, full re-tile & re-fit                                                                     over new vanity & basins.
                                   Tile - inset strip drains / floor wastes                                                                       Tapware location TBC                                                                                               Under-floor heating, full re-tile & re-fit
                                                                                                                                                  by contractor & INt. designer                                                                                      New bath tub, shower screen, shower hob,
                                   Heated ladder towel rail                                                                                                                                                                                                          vanity, toilet, tapware, fixtures, tiling, fittings, lighting
                                                                                           C2                                     C                          F                        B                                   A
                                   Add hi-powered Exhaust
                                                                                                                                                                    Add lighting                                                A1                                   Instant hot water service re-located
                                   fan to ducted system
                                                                                                                                                                    power points
                                   Re-glass existing skylight glass
                                   Clear                                                                                                                            new toilet suite
                                                                                                                                                                    with in-wall cistern                                                                                                  General Notes :
                                                                                                                                                                                                                                                                                          Add lighting & update power points to interior designers spec.
                                                                                                                                  MRCab                                                                                                                                                   Spot lighting in WI Robe and at steps.
                                   Replace existing Awning window                                                                 sk    sk                          bth tub          shwr




                                                                                                               BHd 470h
                                   with double hung window                                 shwr
                                                                                                                           Ens                                                                                                                                                            All floor tiling to be removed & replaced to ID Sel.




                                                                                                                                                                                               Robe
                                   Obscure glass lower half




                                                                                           REPLACE
                                                                                            GLASS
                                                                                            ROOF
                                                                                                                                             HTr
                                                                                                                                                                     Bath                                           Bed Rm 2                                                              Note, use insulating, underlay / glue.




                                                                                                               raked BH
                                   Top Half clear                                                                                                                                       HTr
                                                                                                                          1750h
                                                                                                                                         Trh
                                                                                                                                                                           sk                                       re-level dip in floor                                                 All carpets to be removed & replaced with underlay to ID Sel.
                                   New vanity & basin                                    11-08DH
                                                                                                                                                           dry




                                                                                                                                             Cpd MRCab
                                   with Mirror cab over and                                                                                                    tub                                                                                                                        New plasterboard ceiling on battens with sound inulation through-out.
                                                                                                                                             sk            wm
                                   power points hidden inside
                                                                                                                                                                                                      IW03             IW03
                                                                      Relocate HWS                                                                                                                                                                                                        All new glazing to be double glazed.
                                                                                                                                                               L/dry




                                                                                                                          Robe
                                                                                                                                                                                                      UD 0.66x1.47 Shu UD 0.66x1.47 Shu
                                                                      & Re-do Laundry                                                                                                                                                                                                     shelving & storage
                                                                                           C2                                      WIR
                                                                                                                                                                                                      16-08DH 16-08DH

                                                                                    E                                                                                                 Passage                Entry                                                                 E
                                                                                                                                                                                                                                                Entry
                                                                                                                                                          Slab infill           Foam & Slab infill
                                                                                                                                         Robe                                    to ENGR spec.                 WF end
                                                                                                                                                            step                        step                                  step
                                                          Insulated sound                                                                Robe                                                                                                                                            2x windows :




                                                                                                                                                                                                                                            Apl
                                                          reducing pb ceiling                                                                                                                                                                                                            remove old shutters, install double glazed
                                                          on iso-battens                                                                                 glass
                                                                                                                                                                                                                                                                                                                                                              Areas : (Internal Wall, GFA)
                                                                                        E1                                                                                                                                                                           E1                  double hung windows with shutters to inside




                                                                                                                                                                                                                                            DW
                                                                                                                                                         mir drs.

                                                          throughout.
                                                                                                                                                                                                                                                                                         new LB col's & beams. to ENGR spec.
                                                                                                                                                                                                                                                                                                                                                              Proposed :
                                                          Together with
                                                                                                                                  Bed Rm 1                                          Lounge
                                                          rubber stick                                                                                                                                                                                                                   round FC cover over. Approx. 165mm Ø                                 Living : 92.5 + 20 = 112.5 m²
                                                          matting provided




                                                                                                                                                                                                                                             ohc
                                                                                                                                                                                                                                           sk                                            new kitchen joinery, fixtures & appliances
                                                          by client.                                                                                                                                                                                                                                                                                          Terrace : 45 m²
                                                                                                                                                                                                                                                                                         wall removal or relocation to be
                                                         Sel. new ceiling fans.
                                                                                                                                                                                                               WF end
                                                                                                                                                                                                                                                                                         confirmed with Engineer                                              TOTAL : 157.5 m² (same as existing)
                                                         confirm pos. on site




                                                                                                                                                                                                                                            F
                                                                                                                                                                                                                                                                                         Water supply to fridge icemaker
                                                                                                                                                                                                                                                                                         Lockable red wine ub fridge with cabinets above




                                                                                                                                                                                                                                            F
                                                                                                                                                                    ACH
                                                                                                                                                                          ACH
                                                                                                                                   Retreat                                       Power for desk
                                                                                                                                                                                                             Dining                                                                      Concrete slab topped to match existing floor
                                                                                                                                                                                 ea. side of wall                                                                                        height with foam infill panels to ENGR spec.
                                                                                                                                  Slab infill                                    Col. in wall to ENGR spec.
                                                                           D1                                                                                                                                                                                               D1
                                                                                                                            lightweight concrete                                                                                                                                                   As there is no cavity to this wall portion,
                                                                                                                                                                           2723 to slab over                                                                                                       w/proofing treatment to inside of wall
                                                                                                                                   27-33 SGD                                               27-59 SGD                                                                                               will be required as a minimum
                                                                                                                                                                        line of slab above 880h Wall over
                                                                                             31° Raking wall




                                                                                                                                                                                                                                                   31° Raking wall
                                                                                D                                                              Re-render facia.
                                                                                                                                                                                                                                                                            D            120h x 180w recess in ceiling for R/blinds
                                   As there is no cavity to this wall portion,
                                                                                                                                               Install new fold-out awning                                                    step                                                       Contractor to confirm existing awning
                                   w/proofing treatment to inside of wall
                                                                                                                                               to match exstg                                                                                                                            will work with deck height on-site
                                   will be required as a minimum                                                                                                      tiles up                                       Raised
                                                                                                                                                                      to sides                                                                                                           Recess new doors down into slab edge to provide
                                                                                                                                                                                                                    Sun Deck                                                             minimum step down to terrace floor
                                                                                                                                                                                    tiles up                 step
                                                                                                                                                                                    and over
                                                                                             glz bal.




                                                                                                                                                                                                                                                    glz bal.
                                             Re-render side-wall                                                                                                                    wall                                                                                                 Provide blocking / recess in wall for fold-down desk
                                                                                                                                                  +320                                   440h wall
STRUCTURAL ENGINEERS :
                                                                                                                                                  +660                                 Planter box
TOD CONSULTING                                                                                                                                                                                                                                                                           Re-water-proof planter-box
07 5449 9600
[email protected]                                 Relocate tap in                                                                                         Remove, replace
                                                            garden to wall                                                                                          w/proofing & tiles / pavers                                           New Raised Deck (removable) approx. 300mm Above FFL
BUILDER :                                                                                                                                                                                                                                 W/proof under with drain
                                                            Remove existing tiles, Re-                                                                         Replace glass to match joints
Troy Shelley
Quality Assured Building                                    waterproof and Re-tile R11                                                                         as above unit                                                              low masonry wall under as drain
                                                                                                                                                                                                                                                                                                                                                PROPOSED FLOOR PLAN
PO Box 833                                                                                                                        C                                                                                                       Re- do glass panels with larger
                                                                                                                                                                                                                                                                                                                                                                                                 1:100
Tewantin QLD 4565                                                                                                                                                                     B                                   A               panels as per above / below units
PH: 0402 200 048                                                                                                                                             F                                                                                                                                                                           SCALE 1 : 100
ACN: 606938112                                                                                                                                                                                                                  A1
Lic No. 1030629                                                                                                                                                                                                                                                                                                                         0                                           5m
                                                                                                                                                                                                                                                                                                                                     CD-02    For Client / Council Approval     12-08-22
                                                                                                                                                                                                                                                                                                                                                                                                 PRELIMINARY
DESIGN / DRAWN :                                                                                                                                                                                                                                                                                                                                                                             ( NOT FOR CONSTRUCTION )
                              FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER SCALED MEASUREMENTS,                                                                                                                                                                                                                                        CD-01    For Client / Council Approval     27-07-22
Robert Patterson                                                                                                                       GEOFF COLLINSON                                    ADDITIONS & RENOVATIONS TO RESIDENCE AT                                                              19/1 MORWONG DR,
QBSA Lic.No. 1095554
                                 VERIFY ALL ON SITE DIMENSIONS AND LEVELS PRIOR TO THE COMMENCEMENT
                                                                                                                                                                                                                                                                                                                                 EXSTG-01 For Site Check & Discussion           27-06-22     A3       202213
m : 0401 394 964                 OF ANY CONSTRUCTION. CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY
e : [email protected] OF ANY DISCREPENCIES.
                                                                                                                                       CLIENT                                             JOB DESCRIPTION                                                                                      NOOSA HEADS
                                                                                                                                                                                                                                                                                                                                     ISSUE             DESCRIPTION               DATE      SHT SIZE. DWG NO.
                                                                                                                                                                                                                                                                                                                                                                                                                     CD.3
COPYRIGHT : No reproduction of all or part of this drawing may be undertaken without the express written permission of the author.                                                                                                                                                                                                   NOTE : These drawings to be read in conjuntion with structural engineers drawings

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 1 - Proposal Plans.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.