Council archive · source document
Reference Document Engineering Plans MCU24/0074
Plans and drawings: the text below has words only, no drawings.
Very large file (35.2 MB): may take a few minutes to open.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
dD
dD
dD
EXISTING PIT TO BE DEMOLISHED
AND NEW GULLY INLET TO BE
dD
CONSTRUCTED OVER EXISTING
STORMWATER PIPE BM: Nail in Kerb
dD
dD
PROPOSED BIKE LANE
dD
RL: 1.51 PROPOSED MODIFIED KERB RAMP IN
PP ACCORDANCE WITH IPWEA STANDARD
E M
dW DRAWING RS-090 AND TO SUIT
EXISTING KERB EXISTING INVERT OF KERB LEVELS
dD
E E
dD
dD
AND CHANNEL TO M
64
E dW
1.
BE REMOVED E
E
M
E dW E
dD
PP
AC
E
dD
dD
R E
ER
M
dW
T E
E
IE
dD
WM
P E d
dD
YM
EXISTING TELSTRA PIT TO BE RAISED
dD
/ LOWERED TO MATCH NEATLY WITH E
E
PROPOSED FINISHED SURFACE LEVEL G E dW
M
dD
E
E
M
dD
dW
dD
E
65
EXISTING FIRE HYDRANT
1.
dD
E M EXISTING KERB AND
TO BE LOWERED / RAISED
E
dW WM CHANNEL TO BE REMOVED
70
E
dT
1.
dD
U
FH
dD
EXISTING POWER POLE E WM
d
E
TO BE RELOCATED DEMOLISH EXISTING GULLY INLET AND
dD dT
U
E CONSTRUCT NEW GULLY INLET OVER
PROPOSED FOOTPATH RAMP PP M dD dD
dW dD EXISTING STORMWATER PIPE IN
AT 5.0% MAXIMUM GRADE E
E
dD
dT
U ACCORDANCE WITH NOOSA COUNCIL
dD
E M STANDARD DRAWING RS-080
dD
PROPOSED KERB AND CHANNEL dT dW dS
E
E
TYPE B1 AS PER NOOSA SHIRE
E
U
STANDARD DRAWING RS-080 E M PP
dW dS
dD
dD
dT
U
E
dD
PROPOSED ATLAN BASIN
E
M dS
U E
dT dW
EXISTING STORMWATER PIT TO BE E
dS
E
M
dD
dD
dW
dD
DEMOLISHED AND CONSTRUCT NEW
dT
E U
KERB INLET PIT OVER EXISTING PIPE PROPOSED BIORETENTION BASIN
E dS AREA = 30m^2 MIN.
WM
E
d
dT
E
U BM: Nail in Kerb
66
dD
RL: 1.775 dS
dD
dD
1.
EXISTING TELSTRA PIT TO BE RAISED
dT E dWM
V dD
E
U
62
/ LOWERED TO MATCH NEATLY WITH E dS PROPOSED 1.5m WIDE FOOTPATH AS
1.
dD
PROPOSED FINISHED SURFACE LEVEL dD PER NOOSA SHIRE COUNCIL RS-065
E
V
FHV
E
dD
dD
dS
dD
63
EXISTING WATER VALVES TO BE E
68
1.
dD
dWM
RAISED / LOWERED TO MATCH NEATLY
1.
WITH PROPOSED FINISHED SURFACE E
dS
dTU
E
dD
LEVEL E
dD
dD
dS
E
PP NOTE:
E
EJ
dWM
E EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN DRAWINGS,
46
dS
dD
1.
dTU
E EXISTING POWER POLE TO BE ALL IN-GROUND SERVICES WITHIN THE PROPERTY BOUNDARY INCLUDING
E
dD
RELOCATED BUT NOT LIMITED TO: STORMWATER DRAINAGE, SEWERAGE, WATER, GAS,
dD
E dS
ALBERT ST
ELECTRICAL AND COMMUNICATIONS TO BE SAFELY BE DISCONNECTED,
REMOVED FROM SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR
dTU
E PROPOSED 2.5m WIDE FOOTPATH AS
dWM
dS
E
dD
PER NOOSA SHIRE COUNCIL RS-065 TO ARRANGE ALL NECESSARY APPLICATIONS AND PERMITS WITH THE
dTU
RELEVANT AUTHORITIES. SERVICES TO BE CAPPED IN ACCORDANCE WITH
dD
dD
MH RELEVANT SERVICE PROVIDER SPECIFICATIONS AND STANDARD DETAILS
E
dTU
dS
PROPOSED
dD
6
LEGEND:
dWM
LANDSCAPING
dTU
E
dD
dD
PP
Stay Pole
2.00 PROPOSED MAJOR CONTOURS
dS
dD
7.4m
dTU
6m PROPOSED MINOR CONTOURS
dWM
dE
dD
dTU
dD
dE
6m
dE
dE / / / / / / / / / / / /
PROPOSED BUILDING
EXISTING POWER POLE STAY TO
dE
dE
dS
dD
dE BE RELOCATED PROPOSED RETAINING WALL
dTU
THOMAS ST
dD
dD
dWM
PROPOSED STORMWATER
dTU
PROPOSED VEHICLE CROSSOVER
LO
5.4 BAY
TO BE CONSTRUCTED IN
NG
dS
dD
m
ACCORDANCE WITH IPWEAQ
dTU
STANDARD DRAWING RS-051 PROPOSED CONCRETE PATH / SLAB
dD
dD
dWM
dTU
AY PROPOSED CONCRETE DRIVEWAY
1 B 2.5m PROPOSED KERB AND CHANNEL
LO
dD
dS
dD
7.4 BAY
TYPE B1 AS PER NOOSA SHIRE
AY @
NG
m
1 B .5m 2.5
m
STANDARD DRAWING RS-080
dD
dD
PROPOSED LANDSCAPING / TURF
dD
3 @
@ YS
BA
dTU
1.dWM
11 PROPOSED BIORETENTION BASIN
PROPOSED RAMP AND FOOTPATH
66
dD
CROSSING AS PER NOOSA SHIRE
dD
STANDARD DRAWING NSD-9006E
dD
REFER TO DWG 003 FOR EXISTING LEGEND
dTU
dWM
dD
dD
dTU
dD
LO
5.4 BAY
NG
m
5.4m
dTU
dWM
EXISTING TOP OF GULLY dD dD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document Engineering Plans MCU24/0074Related documentApplication case desk ↗
About this file
- File size
- 35.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.