Stormwater Management Report · MCU19/0008
Table 8 - ESC maintenance requirements.
ESC Measure Maintenance Trigger Timeframe for Completion
of Maintenance
Sediment basins When settled sediment exceeds Within 7 days of the
the volume of the sediment inspection.
storage zone
Other ESC measures The capacity of ESC measures By the end of the day.
falls below 75%.
Sediment accumulation on ESC devices is to be removed and disposed of to the satisfaction of NSC.
5 CO NCL USI O N
This SWMP outlines how stormwater runoff from the site will be managed in order to not adversely
impact the receiving environment.
Stormwater runoff from developed areas of the site shall be directed to a detention & infiltration tank
with approximately 7m 3 detention capacity at the rear of the site. Runoff from the tank shall discharge
via either infiltration or shall surcharge and discharge east to Sunshine Beach as per existing conditions.
The detention tank configuration shall ensure the impact of stormwater runoff on the adjoining sand
dunes is mitigated and maintained below pre-development levels. Final layout & configuration of the
tank shall be confirmed at the detailed design phase. Is it noted that this discharge strategy was
approved for the adjoining development at 24 Arakoon Crescent.
Stormwater treatment could be managed on site by first flush diverters directing runoff for irrigation of
landscaped areas and/or the installation of field inlet pit inserts. Based on the scale of the proposed
development, and typical pollutants produced, these measures are considered adequate.
By implementing the proposed stormwater management system, and providing adequate maintenance,
the downstream environment and neighbouring properties will not experience any adverse deterioration
of water quality as a result of the proposed development.
4 April 2019 Stormwater Management Report 14
S18-030 22 Arakoon Crescent,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.