Council archive · source document
Stormwater Management Report · MCU19/0008
CO NT ENT S 1 Introduction....................................................................................................................... 4 2 Site Description ................................................................................................................ 4 2.1 Location and Land Use ....................................................................................................... 4 2.1 Lawful point of discharge .................................................................................................... 5 2.2 Flooding ............................................................................................................................. 5 3 Stormwater Quantity Management .................................................................................. 5 3.1 Catchment Summary .......................................................................................................... 5 3.2 Stormwater Detention & Infiltration ...................................................................................... 5 3.3 Hydrologic and Hydraulic Modelling .................................................................................... 6 3.4 XP Storm Results ............................................................................................................... 7 4 Stormwater Quality Management ................................................................................... 10 4.1 Operational Phase ............................................................................................................ 10 4.2 Construction Phase .......................................................................................................... 10 4.2.1 Design Objectives ............................................................................................................. 11 4.2.2 Erosion and Sediment Control .......................................................................................... 13 4.3 Maintenance and Monitoring Requirements ...................................................................... 13 5 Conclusion ...................................................................................................................... 14 6 Appendices ..................................................................................................................... 15 6.1 Appendix A – Erosion Hazard Assessment (IECA) ............................................................ 15 6.2 Appendix B – Engineering Drawing ................................................................................... 16 6.3 Appendix C – Site Survey & Architectural Drawings .......................................................... 17 4 April 2019 Stormwater Management Report 3 S18-030 22 Arakoon Crescent,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.