                                                                                                                                                  \S2-C04 .~OOl’6.4
                                                                                                                                                        ~\OSL640                                                   .




                                                                                                                                      RSON+ASSOCIATES



                                                                                                                                                                                 19th October, 2012


                                                 The Chief Executive Officer
                                                                                                                                                        Your Ref: 152004/240078.1
                                                                                                                                                                                        Ref: 90/1080
                                                                                                                                                                                                                          @)
                                                                                                                                                                                              SCRC CORRESPONDENCE
                                                 Sunshine Coast Regional Council
                                                 Locked Bag 72
                                                 SUNSHINE COAST MAIL CENTRE                                             Q      4560               D>                                          111.11111111
                                                                                                                                                        G~~,>,,\                                    80548779

                                                 Attention: Marcus Brennan                                                                                           IV""~
                                                                                                                                                                     .
                                                                                                                                                                            /v’
                                                                                                                                                                                      e/J!
                                                                                                                                                                         1!l                    COli
                                                 Dear Sir,
                                                                                                                                                                                   OCr                      iJ!er
                                                 Re: Development Approval for Reconfiguration of a Lot
                                                                                                                                                             .,...
                                                                                                                                                             I
                                                                                                                                                                                         2072
                                                                                                                                                                eLo/.
                                                      Lot 31 on SP241368                                   -
                                                                                                               Tanderra Drive & Brewers Road                 Fan.
                                                                                                                                                                                 C1l")til")
                                                 I refer to the above mentioned matter and enclose herewith                                      an     Application to
                                                 Existing Approval including:

                                                                A Request to Change an Existing Approval Form; including a signed completed credit
                                                                card payment form for $1, 162.00.
                                                     .          A copy of the Decision Notice.



                                                 Amendment of Condition


                                                 The applicants seek an amendment of Condition 17 of the Decision Notice.


                                                 Condition 17 states:


                                                 "Where parks are proposed to be dedicated to Council, the following information shall be
                                                 provided in conjunction with an application for Operational Works:-;
                                                 17.1.   .....
                                                                                                                                                                                        90’1
                                                 ~~:~::::::::                                                                                     I~ox: ..;?(?I./.~. ......4.9......]cm,(R:
                                                 17.4........                                                                                    /;)fX.OO~                          .     ctOo7~. Lf
                                                 17.5. The design, installation and construction details of playgroun(1 equipment complying with
                                                 the relevant Australian Standards.
                                                 17.6. ..."


                                                 In particular they request the deletion of section 17.5 from the Condition.


                                                 The applicants seek the deletion of the requirement to provide playground equipment due to:
                                                     .      The site conditions of the Park.
                                                                                                                                                                                                                                                   .....
                                                            The existence of sufficient playground facilities in Cooran.


                                                 The Park is located generally under power transmission lines and is also affected                                                                  by an
                                                 Easement for a future gas pipeline. The ground is generally damp and inaccessible.


                                                 It is noted that substantial planting is also being undertaken as a part of the landscaping of the
                                                 development. The planting will have an impact upon the safety and the ability for surveillance
-_..                           ~   ....-
   _.......             ~.,.
              "’""iIl


                                                         .:,~    ~J.   ~
                                                                                :;’~~’ ’.)     c,
                                                                                                       "




                                                                                                                                                                                                                                 ;,j’l’._
                                                                           ._
                                                                                ~;
                                                                                          :I                                                                              1.11
                               PRINCIPAL                                                                   12 Maple Street (PO Box 639) Cooroy Q 4563                                ABN 59 847 644 252
                               Max L. Watterson                                        1             "’~   PH     0754426121                                    ,1.-         .,

                                                                                      t             1,/                                                              ~I
                               Cadastral Surveyor (Qld)                                                    FAX    0754425125                             ,
                                                                                                                                                        !
         ,1c
          ,:;
                               B.Surv(UNSW). M.S.S.S.I                               ~~,       I..         EMAIL [email protected]
                                                                                                                                                 ...~
                                                                                                                                                               .g
                                                                                                                                                                                              "")    ~,,’     :1   "j,   f. \.
               :>;’[                                                                           ~~:                                                                                                  ~.
                                                                                                                                                                                                                                     ’i
                                                                                                                                                                                                                                            "~lr     j
Full text of the other 19 pages

Page 2

"




                                                    2



    of the playground equipment from the adjacent houses and the frontage road.


    Recreation facilities are available at Cooran in the Park located in King Street, the Chris Kenny
    Park and the Cooran Recreation Ground.         These facilities are ample for the population of
    Cooran.


    The applicants believe that there are sufficient for the deletion of the requirement to provide
    playground equipment.

    Refund of Fees


    The applicants request the refund of the enclosed application fees as:


            The applicants believe that the assessment required to investigate this proposal are
            minimal.


            The representations were lodged following consultation with Council staff and were
            deemed to be the appropriate action.



    I thank you for your consideration in this matter and look forward to the receipt of the
    Decision Notice.




    71:_
    Max Watterson
                        .

Page 3

                   Coast                                                                                                                                                     2012/13 Regional Strategy and Planning
         ISunshine
          Council Request                                                                to Change Existing Approval and/or Extension to Relevant Period

                                                                                                                                                                                                                                            Sustainable Planning Act 2009

    r----. "’__
                                       __~~"..~.~.-.~.-I?~~~!()p-T--~nt 1~~I!1:1_ _!i_()!:’._~~!~r!~~_1r~Zg~.~-!M~~_()_C?~~.)’~()!!.fJ~~l.~ Of~.:~t-_Y._~_"":ue-!:-~,-~~~j’~~~_



    t~~~~~~~~T~~~ti1C’i~~’i’.,.:~ I
    !(b),a req stJo extend the rerev!int period fot tf~:~’~~!lyatis m~d~Jo C~~;                             ~":’~~i.’;          ’~(;.   "’ :.
                                                                                                                                              ;.  ;~ ". ’< ~ ~.       .~:- I                    --
                                                                                                                                                                                                                                        ,
                                                                                                                                                                                                                                                            "




      All terms us’act on the fonn h~v~’the meanlng...!t. e~ i\.the S!lst~i",able’ ~ ~nfng A.ct.2009:~r the Sustai~<able Plannin{ ~’eQuration,                             J
    :                                                                                                                                                                                                                                                                                                                   _.



                                                    ;.";:1~L___:~._":’,,-:.:.~ :~L~"..::’..:;r;:;;.\;~ ;.):.:.,;__~_-,._’_____.:’!’-"’. ,...;._ ’:_._~’._;.:_;____~.:~~~_.ijtl
    ;2~~~______,_::.._.___~’:;...          ..".....                .
                                                                       ;.____.______.




    1. Details of person making the request

i Full name                           individual or company                                          MAX WAT"r""E:R.So                                                                .sI        A.r.foc..,A                        ~                                                                                           ;

                                                                                               _._._.__.______._.__._______:t.._.___._____._.___..___.._.___-------.--..----j
                                   -




~_.__.__...._____                       ___._____..___.._._.._.._.".

                                                                                                                                                                                                                                                                                                                                i
~ Contact Name      for company             tv(
                                             -

                                                      k! TTE.R.S~.N                                                        v

,_.____..________________._....__..______._._.._......._._’J."____._---.....-----.----...---.-.--.--.------.-------.-.-..-.----.--------1!
: Postal address                                                         Pc                           80)<                      63!}
l-~~.~~~~~..~-~~.:..=~~..~~~~.~.~~.~
: Business phone 07 .tf42. 6f’l.-l A1Hphone tJ7 .:(42. OLI
                                                                                                       Q-~~I--.~.=~~--=_.__.::~__=~==]~~~___...g__=~~-:.~..====.~]~_~s..~~~!~..~~!2=’~-=-1
                                                                                                                                     IMobile o4~8 I~.) gZ "S                                            i
,..............._..........__.........~.-....---_.-.-....._--.-..-.-.-.__..__L...._._____._.___._.__.._..___.._.________._.,....._..._.-.-.-....-..-...-........-.--.........---.....--.---.--.....-----j
                                                                                                                                     j Fax        07        S"442...         5   f2..S                  i
  Email address                 O.{fI’U_1I:J
        _-   - _..-   ....   --   ----._-_.
                                                       Mw i SV
                                _..__.__._-_._-~_._._-_.._-_.-          rl/rz,y ~.(;.<0/111 a:J                                                                     .
                                                                                                                                              _._._---_.._-_._._----._-_._...._---------_._.__._....._
                                                                                                                                                                                                                                                                             --~_.----




    2. Details of existing approval

i Type of approval (please tick ALL applicable categories)                                                                                                          !Whjph entity issued approval?
: ~Development Permit                                                                                                                                               I [("Sunshine Coast Council
I 0 Preliminary Approval                                                                                                                                            !0 Other entity please specify     -




1 ~ ~::~~~~~:~::i~se                                                                                                                                                I
i [3’" Reconfiguring a Lot                                                                                                                                          i
i 0 Operational Works                                                                                                                                               I
i   0           Building Works                                                                                                                                      I
                Plumbing or Drainage Works                                                                                                                          i
I0
I 0 Compliance Certificate
i 0 Environmentally Relevant Activity                                                                                                                               1                                                                        Dat~-is~~;j- ?4J
                                                                                                                                                                                                                                                                                                                                i


[~PE~~~~~~-~~~~;;,~~~~~;f.’:~!:~~-~O~4-:i+o078.1_(_2.1 ~s-a~. p                                                                                                                                                                                                                                ~7 I_~=J
i Is the approval for a mobile and temporary ERA?                                                                                                                                             ff No                                          0 Yes           -
                                                                                                                                                                                                                                                                    complete below                                              I
                                                                                                                                                                                                           ....--..-..-.-....-....-....-..--........---..-.-.__..-..--.......
                                                                                                      ._...__._..._...___..__...._._.._....._.._._.____.._.._._._._._..._..... __. ._.............._._____..
                                                                                                                                                                                                                                                                                ...   ..........-.-........-..-.   _.............1
........_.._.........................._._.._._.._._... ._......_.__.._.._.. ..._.........._._.._._.




I Insert the                      name of each local                                   government area in which the mobile and temporary ERA is proposed to operate/operating I
    .__._._._.__.__.__~._.~_._~.~..____.__._._..~_~...__._~_________.__._________._.____.__._.___..____..._...H..___._.,_.._.~_.~__._.._.___._._.._.._....._._.._.__....._._._._-_.-..__.,
                                                                                                                                                                                                                                                                                                                                 I
I
r-’-           --.---.-_.--.-..-               -----..-....
                                                                                  .--.----.... -------.-------.-.--
                                                                                                                                                            ------.-.--------.--.--.---------.----                                                                            -------..-~
1                                                                                                                                                                                                                                                                                                                               i
l.._._.._.._.___~_ ._._._..__.__.~._._.._.__..__.__.__.______.__._____._.-----.------------..-....----.----.-..-.-....-.----~...----~.-.---.j



                                                                                                                                                                                                                                        ....- -... .-....---.   -....   -...-.-.---.-.......-.---..


     ..........-... ...--.....-.-.....-...........-....-.-.-.-.-.--...-
                                                                                 ...-..---------...----..-........-....---....-.-..-.-......-.---..--....-........--............----.....--
                                                                                                                                                                                                               ......-...............
                                                                                                                                                                                                                                                                                                                   ....---.1


I.Privacy                                                                                                          with you. Council is
                                                                                                                                                                                                                                                                                                                                I
    Council will use any personal information provided for the intended purpose only and for remaining in contact                                                                                                                                                                                                               i
I   authorised to collect this information in accordance with the Local Govemment Act 2009 and other Local Government
                                                                                                                           Acts. Your
                                                                                                     is dealt with in accordance with
:   personal information is only accessed by persons autho sed to do so. Your personal information                                                                                                                                                                                                                               .




!.~~~E~ pri~_~cy E~~~:____.______                                                               ._._____
                                                                                                                    _...:____._..____-’-__.____________________...___.__
                                                                                                                                                                                                                                                                            _._______._J

    __..........a qld....,...                                                              I          ~gcW...r I T0754757212 FJ1154757271
    I..ocked a.u 72SunIhIrw ea.t Mal Centnt aki<4580                                                                                  I       ABN 31878 m PI’
                                                                                                                                          .
                                                                                                                                  .       4
                                                                                                                                                                                 ’
                                                                                                                                                "’""’.
                                                                                                                                                         ’.......
    Clllcu’ldlaol’llce 1 Qmh Awr C8Icu1dra Qld45 I ..~                alike 11~13ac...snatMarooc:hydoraQld4-

    NInIbaur aftIce Cnr CUrrIe and Bury SheIa fUmboIrQld 4580 I T......... oIIce 9PeIk:M Street
                                                                                                T_nIIn QId 4S85


                                                                                                                                                                                                                                                   Relevant Period FM3002s
    1 of 4                                 2012113 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to

Page 4

                                                                                                                                 To change the development                                                                                   To extend the relevant period
                 approval                                                                                                         conditions                                                                                                 before lapsing
                                                                                                    .
              ........ ........__..   . ..........   ..__,.".~_..___.._._.._..".’_N’_~._...




,
     Please attach documentation outlining the detail of and the reasons and justification for the requested change or

,
  extension.
                                                                                                                                                                                                                __.__.____~______.__.._.._._._.._._...._._                                        ....-_._._.-_._-
                                                                                                                  ______,_._                                  .______._..______,..___                     _..


                         ......_.._    .   ..,.......   ____________._’...._..__.._____.._._._..,_,.__._.__ ._____




     4. Location of the premises



i-~:~~;~. ---.-.<:O;;Mj~t!~~~~~-~~..-~L--J~~r.~~ .-~l~~-.-.G{~O-~-..Tp~;t~;d;.--4S6g.--~
     Lot no.                                                                      Plan type & plan no.
                                                                                                                                                                                                                                                                                                                                      !
                 J.L__..._____...._ .~... ~e.?iJl.~~_______                                                                                                                                                                                                                                               ....--_.._.,,---!
                                                                                                                                                                                                                                                                                                                                      ,

                     ....__..__._____._.._......._..._._....._                ’:,..   .............______._......._._.__.__._.__._..._._..._._.._.._......._........     ..   .......~-_..._.._..._.._-_._.._....._-_.._-_.._...._-...--..-..._..--.........-..-------..-..-..-..-.-.-..
                                                                                                                                                                                                                                                                                                       ._.__._.._._....._..._.._.__..J
r"-"’---"


:                                                                             I                                                                                                                                                                                                                                                       1


                        ......._..__.________.__._.i..__......                                                                                                                  ......-...-.........-........-....-._......--._...-.....----
    ..--...........
                                                                                               .-.-.-.......-          -.--.--.-----.....- --...



                                                                                                                                                                                                                                                                                              _.....-....._..-...-..1
                                                                                                    ...-. -..-....-.................   ...............-.-.-...........-.......... ................--.... ..........
                                                                                                                                                                                                                      .. ....- ......... .....- .............   ..... .........   ....-..................-.........--......-......
                                                                                                                                                                                                                                                                                                                                   ..1
l_.......   ............._..._............_._
                                                        .._..._.._._._.____.!_.....___._._._...__.._.___~...___._._..-..-..-._.-_._..-.._.._._.._._._.-._.._..__....._...

     5. Concurrence Agencies

: Was there one or more concurrence agencies involved in the original approval?
I




i--.-..---------.------..




    7. Owner’s consent

:Is the owner’s consent required for this request?                                                                                                                  !0No                                                                                                                                                             !



~~ ~~~~-.;;,to;;~~~~;;.;"’~~.Q-~~~~~~~~~~~-;f~1
    Table A                   -
                                      owner’s consent provided on form                                                                                                                Table B            -
                                                                                                                                                                                                                owner’s consent provided on form
,.                                                                                                                                                            I

!Owner’s name/s 1...::l..9.~...~~~~_....~!.~.~.4~_t::__c i
l iw~:u~~~bo~;~~ti~~~~;!~~1:la~;~~~:n                                                                                                                                             I.Ow~~:s nam~s t..=~==:====~~~.~_==_.==~==.J
                                                                                                                                                                                  :   0The owner’s written consent is attached.                                                                                                   j
                                                                                                                                                              .
                                                                                                                                                                                  I__...--- ._._.___._____________~..______.

I to the making of this request.

  l~i9~~;U.;~~~-.---T~~=~~=~~~T.
’~_.-.... --..-----..j~~------i /fA
  i~ate_.      ; L        (~2                                                                     o


    20f4                                                      2012/13 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM3002s

Page 5

                   Coast                                                        2012/13 Regional Strategy and Planning
         ISunshine
          Council Request                to Change Existing Approval and/or Extension to Relevant Period



 -                                                                                                                                      ’




    TeS:-F r.’qu;~t ;;ni~:~--?’~’~,-V;;~--~~:’~G~~~~:~-:!:-’~-:;--~T ’.’ ;-:~i:~-;SG::-’~.                                             ,~.~
                                                                                           ",’
                                                                                                      """     >.."      ,:.:
                                                                                                                         "




                                                                                                                             .




! Und~ sac1ion 371,of 1he,Susiainable PI~rihirt9’ ~:~ 9j,jf thEi pe~n.~ai<lng’c’6 reqJJ~$t’i~.il~t the ~wner oiJh~ larid’,to whirih the "I
                                                                                                             ,

                                                                                        ’




i,   -
         .


             relate~ ib iandth:~s:.abqisiloo;f.an~t:tO:~f   ffectio.n 263(2)(d)of tle’~~ai~ ~Jeel~pning Act 2~’.fiP~lied ~e.n’th~;\;;> i0:c;’
..-




             ~~i;.f~?~f~~~~~~ffi~~~~~;~~i’~~~;~’
                      fJ1i ~~h~ wn:~r VllDuld nOt be.’~qu ~d under sectiqn:.~6~ t~tt~~~$tlrable Planning Act 2~~.if.a’d~y.i.l pmel)~ ~.
             the’ cQfi$




!~~ll_ll!iai~~~~:J


 I/We, the applicant, declare that the above information is correct in all respects, at the time of lodgement of this
 application with the Sunshine Coast Regional Council. Should any of the details given in relation to this application be
                                                                                       In         prior to any sudl dlange

 ~;l~~~?)2dir~Shall_ad~e.the_S:""~~~O.ast.R~":a~~uncil ,writing

 Prjvacy
 Council will use any personal infonnation provided for the intended purpose only and for remaining in contact with you. Council is
 authorised to collect this infonnatlon In accordance with the Lodal Govemment Act 2009 and other Local Government Acts. Your
 personal
              ’....
         .

Page 6

1-




     :Application

     I-.--........,.........._-
     t R~C!:j~~~t~~!ijl’c,,"i.:!:..~._ :/:.1’
                   ~



                                                li.




                                                      1




      Payment options

Page 7

".1



                                                                 Sunshine Coast Regional Council                 T 0754757272
      Sunshine Coast                                             Locked Bag 72                                   F 0754757277
                                                                 Sunshine Coast Mail Centre Q 4560               [email protected]
      Council                                                    ABN 37 876 973 913                              W www.sunshinecoastqld.gov.au



                                                                   Officer:                           Marcus Brennan
                                                                   Direct Teleph9De:                  07)5449 5331
                                                                   Fax:                               (07)5447 5601
                                                                   Response Address:                  Locked Bag 72, SCMC 4560
                                                                   Our Reference:                     152004.240078.1



      25 March 2011



      Max Watterson & Associates
      PO Box 639
      COOROY OLD 4563



      Dear Sir/Madam



                                       Change to an Existing Approval
                                                   Sustainable Planning Act 2009

      I refer to your request to extend the relevant period of an
                                                         :<
                                                                  existing approval granted on 31 May
      2007. On 24 March 2011 Council decided to app’fove
                                                              your requested changes.

      Details of the decision are as follows:


  ~{1?!t~~~! f;{ij~r At): N’~~ ’~                  :I,o:s~lt~~r ~~{~1~[~t~~~%t~r~~~}:;I~\W:~ ~/~~;;.t:::.

      Application No:                                152004.240078.1 (23758 DA)

      Street Address:                                Lenske Lane COORAN OLD 4569

      Real Property Description:                     Lot 30 SP 161951

      Planning Scheme:                               The Noosa Plan


  :~~,~~~i~~~~~~’, ’G:I\S~t1N; ~st~JI4S:;~~~~~~~JiJtY~~1)~~t~W~!:1 tj~\~;:?~~::’;~h:)?"’

      The following type of approval has been issued:


               Lot Reconfiguration             -
                                                   11 Lots


      In relation to the request to extend the relevant period for the above
                                                                                                                   development approval,
      Council decided to:


      A. Extend the relevant period until 31 May 2012

      B. Approve a change to Condition 5

      C. Issue a Change to an Existing Approval



  ,~j);J,i4"\\;f ~pI1E~~~:fin:~:~ lQD)
                                     B,:~RR. ~Y I;:/ ’,;;i"(,\1:’\..,;~:: )..:..,

      The relevant period for this development approval is identified in the Assessment
                                                                                        Manager
      conditions.




 Calqundra Office                            Maroochydore Office                              Nambour Office                     Tewantin Office
 1 Omrah Avenue                               11-13 Ocean Street                              em Currie and Bury Streets         9 Pelican Street
 Caloundra Q 4551                            Maroochydore Q 4558                              Nambour Q 4560                     Tewantin Q 4565
  PD-DA-FM387/1-13/04/2010

Page 8

                                                                                        152004.240078.1




1.    Development undertaken in accordance with this approval must generally comply with
      the approved plan of development. The approvedplan is titled and numbered Plan of
      Proposed Reconfiguration 90/108 T1 & T2 prepared by Max Watterson & Associates
                                               -




      and dated 9 May 2006 and as may be amended by these conditions.

2.    The development may be undertaken in the following Stages:

      Stage 1: Lot 30 plus balance; and
                 -




      Stage 2: Lots 31 to 41 plus park dedication.
3.    The    development must be undertaken          and   operated   in   a   manner    that   causes   no

      detrimental effect upon the amenity of the neighbourhood             by reason of the creation of
      excessive noise, lighting nuisance or other emissions.

4.    For the purpose of these conditions:-

      4~-: -A-plan-of subdivision-means the plan-forthe reconfiguration of a-lot required -to -be
             approved by Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
      4.2.   A   Registered Professional Civil Engineer means an engineer who is registered
             with the board of Professional Engineers of Queensland.

      4.3.   The Applicant means the person named as the Applicant on the application form
             for this Development Permit.

      4.4.   The person acting on this permit means any person or company who undertakes
             development pursuant to this permit.
                 \

5.    Pursuant to Section3.5.2~(6) of the Integrated Planning Act 1997, the permit is valid
      until 31 May 2012, by which time all conditions must have been complied with,
      operational works completed, and the Plan of Survey lodged with the Council for
      endorsement.

6.    In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
      documentation shall be presented to Council and shall be submitted in the correct form
      with the fees prescribed in Council’s adopted fee schedule.

7.    All outstanding rates and charges due and payable to Noosa Council in respect of the
      lots being reconfigured shall be paid prior to endorsement of the Plan of Survey.

8.    Prior to commencement of any Operational Works arising out of this permit, security in
      the sum of $50,000 must be lodged with Noosa Council, to secure performance of all
      conditions of this approval. The security shall be in the form of cash or unconditional
      trading bank guarantee acceptable to the Development Engineer.
      The security will be returned upon satisfactory performance of all the conditions of this
      approval and any other related Development Permits for Operational Works, less any
      costs incurred by Council in ensuring compliance with these conditions or for any
      additional     inspections   incurred   for substandard work    or    works   undertaken     not   in
      accordance with this permit.


Roadworks

9.    As part of Stage 2, Tanderra Drive shall be constructed as a 17 metre road reserve, 8
      metre AC kerb to kerb road and shall be constructed to Council’s standards, including
      the provision of kerb and channel, asphaltic concrete pavement.

10.   As part of Stage 2, as Brewers Road is currently a formed but unsealed gravel road it
      shall be   upgraded to a Local Road standard of road from Tablelands Road to the
      eastern boundary of proposed Lot 34 as specifically defined below:

Page 9

                                                                                                                                        152004.240078.1

       10.1. A crowned 8 metre wide asphaltic concrete pavement measured from kerb to kerb,
                and--------

      -10.2. Flush -kerbing provided along the northern side of the roaa with kerb & channelling
                provided along the southern side of the road, and
       10.3. A table drain constructed along the northern side of the road within the footpath to
                direct any surface water runoff                   away from the road and                                    to reflect the rural
                character of the area, and

      10A. A kerb entry stormwater catch pit and associated drainage pipes to be installed at
                the south-western extent of the road to catch any surface water runoff from the
                road, and
      10.5. Road pavement depths designed to withstand a design traffic loading of 5.0 x 105
                Equivalent Standard Axles (ESA’s 80 KN axle load passes).
11.   As part of Stage 2, the Tanderra Drive-Brewers Road intersection shall be upgraded to
      a sealed         intersection, smoothly transition from one to the other. These upgrading works
      shall-also include any corrections/ ddiH ns to pavement markings and i6ad signage that
      may be necessary to ensure a safe intersection. Please note that any drainage works
      that may be required, such as pipe crossings under the road, shall be installed  to                                                                        prior
      constructing the pavement.
12.   As  part of Stage 2, the intersection of Brewers Road and Tablelands ,Road shall be
      upgraded to a sealed intersection, smoothly transition from one to the other. These
      upgrading works shall also include any corrections/additions to pavement markings and
      road signage that may be necessary to ensure a safe intersection. Please note that
                                                                                         any
      drainage works that may be required, such a’s pipe crossings under the road, shall be
      installed prior to constructing the pavement.

13.   As part of Stage 1, a sealed legal vehicular access, minimum width 3 metres, to Council
      standards shall be constructed to Proposed Lot 30 on Plan of Proposed Reconfiguration
      90/108      -
                       T1 & T2 prepared by Max Watterson & Associates and dated 9 May 2006.

Contributions

14.   Monetary contributions shall be paid to Noosa Council towards the cost of providing
      and/or upgrading various infrastructure at the rates applicable at the time of
                                                                                                                                                     payment.
      An estimate only of the contribution amounts under the current Council                                                                      policies and
      requirements is outlined in the table below:
      ’~k’   ’,/:;.   ~~~,-   ".tj,   >_"’   ,W:O~;:~,’A"   -;,      ’",
                                                                           :,,’,’," -,,,\%,c,,,,,            ~j!w";
                                                                                                                                  ,’Amount
                                                                                                                                                                         _




      t 9Qtr~,~i!tl,;.n e_q ir~trtJ _~:pr~~ti                                  Arnou nt- Stage ~.,]i;                  -,
                                                                                                                             -



                                                                                                                                           St ’l" e ’2’
                               _
                                                                           !l%
                                                                           ;"’v1ni."   .,
                                                                                            ;;;>-,",   ,’-
                                                                                                                /’
                                                                                                                         --"_
                                                                                                                                   .o_:\.,
                                                                                                                                   ^’,


                                                                                                                                 ,:’;;’0:
                                                                                                                                             -.
                                                                                                                                                  .’Ill",,""
                                                                                                                                                  ,.,.-
                                                                                                                                                       _-’,
                                                                                                                                                          ’’?’
                                                                                                                                                                      ~i’’’,~’
                                                                                                                                                                  ,.ftJt.;,"";;""’-


        PSP17         -
                          Water Supply Headworks
        Contributions
                                                                             $0                                                             $71,153

        PSP20         -


                          Pathway Trunk Network
                                                                             $0                                                         $12,745
       Contributions

       Local Roadworks Contributions                                         $0                                                         $8,492
                                                                             $0 (considered as                                          $ 92,930
       TOTAL Contribution Amount =                                           the        as             of            right
                                                                             development
      Please note, that these amounts are all subject to variations in the Consumer Price
      Index, All Groups Brisbane from March 2007 until the date of payment.
      All contributions must be paid prior to Council endorsement of the plan of
                                                                                                                                             survey.

Page 10

                                                                                             152004.240078.1


Park Dedication

15.   Prior to approval of the Plan of Survey for Stage 2, the land indicated as Park on Plan of
      Proposed Reconfiguration 90/108 T1 & T2 prepared by Max Watterson & Associates
                                                       -




      and dated 9 May 2006 shall be dedicated to Council as "Park        Public Use Land" at no
                                                                                  -




      cost to Council.

16.   The existing dam in proposed Lot 101 is to be retained as an open space feature and is
      not to be filled. The batters of the dam will be adjusted so that they have a maximum
      grade of 1 in 4 for safety purposes against accidental entry, as the dam will be in public
      open space.

17.   Where parks are proposed to be dedicated to Council, the following information shall be
      submitted in conjunction with an application for Operational Works:               -




      17.1. Engineering details of the proposed clearing, filling and drainage works within the
                park areas to achieve parks of the size required.
      17.2. An       Engineering      assessment of any            drainage problems, which may result on
            -                                                                                                    _




                -adjoining-   lots   as   a    res   lt of   ny filling works, and the proposed means of
                overcoming such problems.
      17.3. A landscaping plan showing proposed                   revegetation works following completion of
                the earthworks.

      17.4. Clearly define the extent of the park area on site for inspection by relevant Council
                personnel, prior to any earthworks or clearing works commencing.
      17.5. The      design, installation and construction details               of   playground    equipment
                complying with the relevant Australian Standards.
      17.6. The location of all               proposed drains entering the park including detailed      outlet
                controls

E rthworks

18.   Earthworks shall be            generally contained within existing and proposed road reserves.
      Where earthworks are required for the provision of services, existing contours shall be
      restored.

Water Supply

19.   The   development site shall be connected to Council’s Water Supply systems to the
      standards and requirements of the Director of Works and at no cost to Council.

20.   Each water connection to th,e water reticulation system shall extend to the                     property
      boundary and be metered.                  All fees for the supply of water meters shall be paid to the
      Council.

21.   Provision shall to be made in the                  park for a water connection.       Under-road service
      conduits shall be provided to ensure a connection is available.

22.   Fire hydrants are to be provided throughout the development in accordance with Council
      and Queensland Fire Service standards.

23.   Detailed design drawings and calculations shall be submitted with an application for a
      Develop’ment Permit for Operation Works (Services). To avoid conflict with other
      underground pipes or services, all existing and proposed services required by the
                                                                    .




      development shall be shown on the plans.
24. _All connections to existing               systems are to be carried out either by Councilor by a
      Council approved contractor, and ,at no cost to Council.

Page 11

                                                                                           152004.240078.1


    25.     Conduits and kerb markers shall be installed for all necessary service crossings of roads
         --to-eouncil’s satisfaction:----;A.n-"As-eonstructe-d" pian-shnwing the-locations of-the-conduits----
              .
                  _shall be submittedlo Council.prior to acceptance.of the works "On Maintenance".

    26.           All sag  points in trenches excavated for the installation of underground infrastructure
                  shall be drained to a drainage pit.

    27.           Subsoil drains shall be used to ensure trenches are not dammed by pits, manholes or
                  other structures, and drained appropriately.

                  Any alteration of a public utility or other facility necessitated by the development of the
                  land or associated construction works either internal or external to the site shall be at no
                  cost to Council.
        Easements

        28.       Prior to Council approval of the Plan of Survey, a duly executed CQPY of any required
                  Grant of Easement for services shall be .submitted to Council for perusal.

                  Any changes required by Council’s Solicitor shall be attended to prior to endorsing the
                                                                          ..   ..   -
                                                                                                       -      .




                  Plan of Survey.

\                 Any necessary Titles Office forms requiring the consent of Council is to be submitted
                  prior to the endorsing of the Plan of Survey.
        29.       Prior to the approval of the Plan of Survey, the Applicant’s Solicitor shall give Council’s
                  Solicitor an appropriate undertaking in writing that in conjunction with lodgement of the
                  Plan of Survey at the Land Titles Office, the Title Deed and the easement documents
                                 .




                  will also belodged and any additional Titles Office forms or requisitions requiring the
                  consent of Council being attended to forthwith.
                                                                  ’\
    .

        30.       Legal documentation presented to Council as a requirement of this Development Permit
                  shall be submitted in the correct form, with the fees prescribed in Council’s adopted fee
                  schedule, in conjunction with the lodgement of the plan of subdivision for Council
                  approval.
        Electricity and Telecommunications
        31.       An underground electricity service shall be provided to each lot if not already provided.

                  In this  regard, an approved ENERGEX Electrical Design Consultant shall work in
                  conjunction with Council’s Manager Works Support to prepare detailed designs of the
                                                        -




                  electrical proposal.

                  The detailed deigns shall then be submitted to ENERGEX for approval and a copy of
                  their approval submitted to Council in conjunction with a "Certificate of Electricity Supply
                  for Proposed Subdivisions" (prepared by an approved ENERGEX Electrical Design
                  Consultant) prior to Council endorsing the Plan of Survey.
                  Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant
                  shall be wholly at the applicant’s expense and shall not entail a financial encumbrance
                  on future purchasers of the proposed lots.


                  Street    lighting and pathway lighting throughout the subdivision shall be provided in
                  accordance with Council’s     Engineering Design Standards, section 11.3.3 and to the
                  satisfaction of Council.

        32.       The requirements for TELECOMMUNICATION services shall be satisfied in relation to
                  any  existing services that currently traverse the site and for the provision of new
                  telephone services to the proposed lots. In this regard written confirmation from an
                  approved telecommunication agency shall be submitted to the Council prior to Council
                  endorsing the Plan of Survey.

Page 12

    .
.




                                                                                         152004.240078.1


        33.    The requirements of ENERGEX, OPTUS and TELSTRA shall be satisfied in relation to
              ,anyexislinrserVices~wni n curre- tIYtraverse-theaeveJopmentsite.-Wr tten
                                                                                                              ~---




              -confirmation by the-relevant authorities that satisfactory arrangements -have -been made
               to formalise any existing informal services shall be submitted prior to Council approving
               the Plan of Survey.

        Stormwater Drainage

        34.   All stormwater drainage shall be designed in accordance with the provisions of the 1987
              Australian Rainfall and Runoff (A.R.R.), Australian Standard AS3500.3.2-1998
              ’Stormwater Drainage-Acceptable Solutions’ and Noosa Council Standards. Pipe and
              channel drainage systems shall be designed to cater for the ten (10)year ARI design
              storm event. In all cases the major event surface flow paths shall be designed to cater
              for the one hundred (100)year ARI.

        35.   A suitably qualified Registered Professional Engineer, specialising in hydraulics shall
              prepare engilJeering drawings and specifications for stormwater designs, which shall be
              submitted in--conjunc!ion with an applicat >n fora J?evelqpment Permit for Qper~ltionaJ
                            -




              Works.

        36.   The stormwater discharge from the development site shall be designed such that there
              is   no   net increase in the rate of discharge   as a   result of the development for storm
              events up to 100 year ARI.

        37.   ,Tabulated hydrologic and hydraulic calculations that -demonstrate the adequacy or
               otherwise of the existing site stormwater ’drainage system shall be submitted in
               conjunction with a Development Permit for Operational Works. Such calculations shall
               include any remedial measures necessary to rectify defects in the existing system.
               Where pr posed site draina2Je is to be connected to the existing system, the calculations
               shall clearly demonstrate the adequacy of the existing drainage network to accept the
              additional stormwater flows.

        38.   Plans detailing the existing and   proposed site drainage network including plans and
              longitudinal sections of pipeline, the location of pits, pipe invert and pit surface levels,
              junction details, size and class of pipes, trench conditions and details of surface flow
              paths together with tabulated hydrologic and hydraulic calculations that detail the
              drainage network and the capacities of the various surface flow regimes, shall be
              submitted to Council in conjunction with a Development Permit for Operational Works.

              Where flows are in excess of 100 litres/second then a hydraulic grade line analysis will
              be required.

              Where the catchment exceeds 1 Oha, the assessment shall be appropriately modelled.

        39.   Roof and surface water is to be collected     on   site and is to be discharged through a
              single underground drain line into existing drainage in Tanderra Drive.      The maximum
              discharge allowable to Council’s street gutter at anyone location is 25 litres/second. A
              Development Permit for Operational Works is required to be obtained in respect of the
                                                                                  ’

              drainage scheme.
        40.   Stormwater drainage shall include measures to protect proposed allotments from run-off
              from surrounding land.      The design shall also address controls for gross      pollutants,
              nutrient run-off, oil and grease, and silt and sediment.

              Underground stormwater systems shall be designed in accordance with Noosa Council’s
              Engineering Design Standards, and shall be connected, where possible to Council’s
              existing drainage systems.
              An easement, of minimum width 4.0 metres shall be granted in favour of Council over
              any stormwater pipes that traverse private property.

Page 13

                                                                                          152004.240078.1


             Designs that concentrate stormwater onto adjoining land shall require separate formal
          --approval fromlheowner-af1he and- -re1evant-Gbvernmenr-AUlnotity.-Suchappr val----
-------




             shall-be submitted with the design in -conjunction with-an -application -ror-a -Development
             Permit for Operational Works.

     41.     The design plans detailing surface levels, which shall be controlled across the site of the
             development to create a major storm event overland flow path system to cater for the
             100 year design storm, shall be submitted in conjunction with a Development Permit for
             Operational Works. Any overland flow from external catchments shall be ccepted and
             incorporated in the major event surface flow drainage system through the development
             site. Overland flows shall be discharged in a safe manner and the product of velocity
             times depth shall not exceed 0.4 m2/sec.

     42.     The design plans are to show how stormwater run.-off within and from the site is to be
             controlled   both   during   construction and   permanently.   The   plans       are   to indicate
             measures to be taken to prevent erosion and the export of sediment from the site and

             will embrace the principles set out in the Institution of Engineers, Australia, Queensland
            -Givision, "Soil Erosien -and Sediment Control --Guidelines for-Queenslahd -Construction
             Sites", June 1996.

            Designs shall also incorporate the principle of "no net increase" in nutrients and either
            pollutants from the developed site. This may require the provision of a drainage system
            that allows first flush (first 12mm of rainfall) to be collected and treated prior to release
            into the downstream drainage system.

     43.    An easement for drainage in favour of Council shall be created over the full length and
            width of major storm event surface flow paths within the development site at no cost to
                                                                                          .




            Council.

     44.    Underground stormwater systems shall be designed in accordance with Noosa Council’s
            Engineering Design Standards, and shall discharge, where possible, into the wetland
            system, as far upstream as practical. Appropriate stilling and energy dissipation
            measures shall be incorporated at outlets.


     45.    Suitable overland escape routes are to be provided for stormwater run-off in excess of
            the piped design frequency.

     46.    All concrete pipes within road reserves and within drainage easements intended to be
            dedicated to Council shall be inspected by closed circuit television (CCTV). A copy of
            the CCTV inspection shall be recorded on videotape and submitted to Council prior to
            endorsement of the Plan of Survey / prior to commencement of the Use.

     Weed Clearance


     47.    All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest
            and Stock Route Management) Act 2002 are to be controlled on the site prior to Council
            endorsement of the plan of survey. In this context "controlled" shall mean, for class 1
            and 2 pests, completely eradicated. For class 3 pests it shall mean removal of the plants
            where they threaten environmentally significant areas of the site such as riparian zones
            and areas of natural vegetation.

            Where class 3 plants are removed as a result of this condition and there is not sufficient
            natural regeneration of native species, the areas shall be replanted with endemic native
            species so that a sustainable natural ecosystem is restored.
            Council’s Conservation        Management Supervisor will not inspect the site until 30 days
            after the weed treatment and replanting is complete.

Page 14

                                                                                     152004.240078.1


 Vegetation Removal & Landscaping Requirements
48.   The  existing vegetation on the site shall be retained except where required to be
      removed to enable construction of roaas, accesses or pegging     f surveyed boundaries.
      Particular care shall be taken not to disturb vegetation adjacent to existing creeks and
      watercourses unless approved by Council.

49.   Cleared      vegetation is to be suitably processed by one of the following methods and
      removed from the site.

      49.1. Processing through       a wood-chipper or shredder.  The resulting mulch is to be
                stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres
                high, and with a minimum of 10 metres between edges of heaps.
      49.2. Disposal for firewood.

      49.3. Disposal for landscaping purposes.

      49.4. Transport to alternative        site for   breaking   down   materials, provided that all
            .



                -necessary -permits -have been -obtained -to allow -the alternate--site -to -be used for
                this purpose.

      49.5. The disposal method for clearing works is to be submitted in conjunction with an
                application for a Development Permit for Operational Work. The Applicant is
                advised that other methods may be considered provided full details f the method
                are submitted.


      49.6. The Applicant is also advised that burning off is            an   unacceptable method of
                disposal.
50.   An approved footpath tree-planting programme shall be undertaken on completion o~ the
      roadworks.

51.   The  development site shall be landscaped in accordance with Council’s Policy
      ’Landscaping Guidelines’, and properly prepared landscaping plans by a qualified
      Landscape Architect or professional horticulturalist are to be submitted in conjunction
      with an application for a Development Permit for Operational Works incorporating
      Landscaping. Where other permits for Operational Works for roads, drainage or access
      are required, the landscaping layout shall be based on approved .drawings for those.

      Operational Works. The landscaping plans are to address:-
      51.1. Street tree planting

      51.2. Parkland areas

      51.3. Removal of undesirable species

      51.4. Revegetation of buffer areas to provide effective screening

      Such landscaping .is to be completed in accordance with the approved landscaping plan
      prior to acceptance of the development "On Maintenance" and maintained thereafter
      during the 12 month maintenance period to the reasonable satisfaction of the Director of
      Works.

52.   A  Development Permit for Operational Works covering landscaping must be obtained
      prior to the commencement of any works.

      Landscaping plans must include:-
                Contour lines and levels;

                Landscape treatments, such as fence, retaining walls, paving, lawn, planting etc;
            Planting schedule detailing        location and botanical    names    of all trees, shrubs,
            ground covers, etc;

Page 15

                                                                                                     152004.240078.1


                  Site, street and other close proximity trees shall be accurately located on the
                                                                                                                              -




------------Sit 7Iandscapel51an-an --snall~b -identifiea as                           eing    therrefaine   ,-tnmmed,------
                  transplanted or removed; and
                  Areas of cut and fill.

           Where other permits for Operational Works for roads, drainage or access are required,
           the   landscaping layout shall be based on approved drawings for those Operational
           Works.

 53.       A vegetation retention plan is to be submitted with the landscaping plan. The vegetation
           retention plan is to indicate:-

                  road and service location

                  vegetation to be retained
                  measures       employed to ensure vegetation retention.
           Prior to landscaping beiog accepted "On Maintenance’~, _a certificate from a qualified
           Landscape Architect or qualified Horticulturist shall be submitted certifying that he has
           supervised the landscaping works required by this permit and have been carried out in
           accordance with the approved plans and conditions and in accordance with best industry
           practice.
 Permanent Survey Marks

 54.       Prior to approval of the Plan of Survey for Stage 2, two new State Survey Marks shall be
           provided, one on the Brewers Road frontage of the site and one in the new road section
           of Tanderra       Drive. It shall         be    levelled   and   located    to   the   requirements of the
           Development Engineer. A ’Form 6’ shall be subr’nitted for Council’t) records.
 55.       Each State       or   other Permanent
                                               Survey Mark shall be installed clear of overhead
           vegetation, making         it   suitable       for
                                                  Global Positioning Equipment, and accurately
           connected to at least one real property corner by a registered Surveyor.

 General

 56.       Prior to undertaking any excavation, the person acting on this permit shall contact public
           utility service providers to ascertain the location of any- underground services associated
       .
           with the site.

 57.       Before the issuing of a Development Permit for Operational Works, the Applicant shall
           sign a written undertaking to be responsible for the full cost of repairs to road pavement,
           footpath, kerb and gutter, or other Council property damaged as a result of construction
           of the proposed developmerit.

 58.       If any Council property or facilities (such as underground    drainage or water supply) is
           damaged by any person acting                   under a condition of this
                                                                          permit, through any cause
           whatsoever in the course of, directly or indirectly carrying out development, that person
           shall forthwith notify the Director of Works and shall forthwith rectify that damage at its
           cost and to the satisfaction of the Director of Works.

           Alternatively, the Applicant may request the Council to carry out the rectification works.              .




           In all cases, Council reserves the right to carry out rectification works in an emergency
           and where no reasonable attempt has been made to complete the rectification works as
                                                 .




           part of the development.
           All costs incurred by Council in any rectification works shall be repaid to Council prior to
                                                                                        .




           the approval of the Plan of Survey.

 59.       No Council property or facility shall be interfered with during works associated with this
           development.

Page 16

                                                                                  152004.240078.1


60.    The following steps are to be undertaken prior to commencement of any construction:-
  --




       60.1~ ThePri~-~ip~1 C~~tr~~to~shall gi~e-- 60-undl’~ -1~sp~ct~r--~~v~~(7)d~y~’ ~~tic~-~f----
                                                                                                   .



                intention to commence works.

       60.2. The      Principal Contractor or any of his subcontractors shall not undertake any
                works    unless each contractor has public liability insurance in the sum of
                $10,000,000 and copies of current public liability insurance policies are submitted
                to Council’s inspector.

       60.3. The Principal Contractor shall nominate a site representative and give a telephone
                number that can reach the site representative at any time during a 24 hour day.

       60.4. The site representative shall arrange to meet on-site with Council’s Inspector to
            .




             obtain Council’s requirements for construction of access.

       60.5. All signage, including that for safety during construction, shall be in accordance
             with the Manual of Uniform Traffic Control Devices and Department of Transport
                (Main Roads Division) Roadworks Signing Guide.
61.    Prior to excavating any material to be used for fill on this development site, a
       Development Permit for Operational Works shall have been obtained for the site from
       which the excavated       material is   won.   A soil   report shall be submitted with the
       application certifying that the material is free of acid sulphate soils and other deleterious
                                                                                               .




       materials.

62.    The transportation of all materials to and from the development site shall be undertaken
       in   a   manner   such that  particle matter escapes onto a public road. All vehicles
                                     no

       carrying materials either to or from the development site shall be covered to prevent
       materials inciuding dust being \~/indblown from the vehicle.

63.    A programme of works is to be .submitted with any application for a Development Permit
       for Operational Works detailing the construction schedule and proposed prevention
       measures.


     Where the program is changed for any reason whatsoever, a copy of the revised
  /’-pr:ogram shall be submitted to Council’s Works Inspector within seven (7)days.

64.    Operational Works are to be carried outin a manner that prevents:-
       64.1. Pollution of a waterway

       64.2. Dust nuisance to residents in the vicinity

       64.3. Transfer of dirt and debris onto a public road

       64.4. Excessive noise (less than 1.5 Db above ambient measured at the lot boundaries)

       64.5. Excessive traffic delays (less than 5 minute delays)

       64.6. Diminishing of neighbourhood amenity (long term parking of employees vehicles,
                parking of construction equipment etc.
65.   Where Operational Works are likely to affect nearby residents, at least 3 days notice of
      commencement ()f work, the name of the site supervisor, and             a   24 hour contact
      telephone number shall be distributed to affected residents.
66.   All designs for engineering works involving the construction of pavements, kerb and
      channel, vehicular access, footpaths, turnouts, stormwater drainage or water supply,
      shall be prepared in accordance with the requirements of Council’s Engineering Design
      Standards, shall reference where applicable to Council’s Standard Drawings, and shall
      incorporate best engineering practice.

Page 17

,’,




                                                                                                              152004.240078.1


       67.     A   suitably qualified Registered Professional Engineer shall prepare engineering
               drawings and specifications for all engineerin’g works, which shall -be submitted n
               ,conjunction with an application for a Development Permit for Operational Works.
       68.     Prior to     Council   approving   the   Plan       of   Survey, a       certificate       from          a    registered
               Professional Civil Engineer shall be submitted to Council for each Development Permit
               for Operational Works issued pursuant to this permit. The engineer shall certify that he
               has supervised those works and that they have been                       completed in a workman like
               manner      in accordance with     good engineering practice and                      in accordance with that
               permit.
       69.     As Constructed drawings certified by a registered surveyor showing extent and finished
               levels are to be submitted for Council’s records.

               These      drawings must fully detail levels for all engineering works including drainage
               structures, building floor levels, finished ground levels effluent trenches and pavement
               surface levels. Drawings shall be on transparencies, a hard copy highlighting any
               changes from design and in electronic format on an IBM PC compatible floppy disk in a
               format capable of integration with Council’s computer system.

       70.     A Development Permit for Operational Works must be obtained prior to commencing any
               work.

       71.     An environmental management plan           covering all aspects of the development shall be
               submitted in conjunction with any application for a Development Permit for Operational
               Works.

       Sediment and Erosion Control

       6’2.    To protect the environment against siltation/sediment export or soil erosion as a result of
               this development, an erosion and sediment control plan shall be submitted in
               conjunction with a Development Permit for Operational Works. Site control measures
               such as silt fencing, controlled gravel access to the site and controlled disposal of waste,
               may be necessary.

               All physical site control measures shall be installed and maintained until all Operational
               Works have been        completed and accepted "On Maintenance" and the erosion and
               sediment control plan adhered to at all times.

       Future Permits Required

       73.     For the following classes of work associated with            development, a Development Permit
               for Operational Works mus;t be obtained prior to commencement of works relating to that
               class of work. The application may combine any or all of these classes of work:                                 -




               73.1, Site Civil Works

               73.2. Roadworks

               73.3. Stormwater Drainage

               73.4. Frontage works

               73.5. Water reticulation

               73.6. Landscaping



      15.       :REFERRALAGENGY(              Nb TI ’NS        ’
                                                                                    .".;.: :~’   .
                                                                                                          .




                                                                                                              ",/
                                                                                                                    .




                                                                                                                                   ’.~:<:I
                                                                                                                        .... .,/;’P’


       Not Applicable




       pn_nA_~~A~A7/1_1

Page 18

0"




                                                                                                    152004.240078.1




      The  approved plans and / or documents for this’ development approval are listed in the
      following tables:

            roved Plans
      Plan No.                                Plan Name
      90/108    -
                     T1 & T2                  Plan of Pro osed Reconfi uration


     ~1~~f;;g:~~!J~:i;AN$lt;~,b ;OM.e.~IS~~EQWJ~.ING’l~MENDM ~N:r~~~~t~1~~\~~,f;\:t~t~0~j;&1~l{gD;~4~i;j~;~!~’\’~f’%~’~’

      Not Applicable




      The. following .advices are for information purposes                 only and    do not form conditions of
      approval:


      1.     The applicant is advised that development contributions and infrastructure
                                                                                         charges
             applicable to this development approval have been based on the following Uses Class/
             Uses and applicable quantities:-




              8.       Detached                                      10.    Detached
                                         9.      1 Dwelling                                      11.    12 Dwellings
                       House                                                House

     2.      The Applicant is advised that the following attribute shall be placed on the rates records
             for the proposed lots to advise prospective purchasers of Council’s requirements
             regarding house siting, sewage treatment method, and effluent disposal:-
             2. 1.    "The property is in an unsewered area. Effluent shall be disposed of on-site in
                      accordance with Council’s policy for on-site wastewater disposal current at the
                      time of Building Works. A detailed site assessment and effluent land application
                      design will be required to be submitted to Council at the time of application for a
                      Development Permit for Building Works.
             2.2.     You are advised that a preliminary investigation for this site indicated that an
                      advanced secondary wastewater treatment system may be required. For further
                      information regarding on-site wastewater disposal please contact Council’s
                      Plumbing Services Department".
     3.     The   applicant is informed that payment via credit card tr nsaction will not be an
            acceptable method of payment for development contributions conditioned in this permit
            or for infrastructure charge notices issued
                                                        separately.




     PD-DA-FM3R7/1-13104/?010

Page 19

...,     ..




                                                                                                                           152004.240078.1


        4.     Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991.
              -Act -ifihe-cost of operational works exceeds---$8G,-OOO, -then -a -portable--Iong service leave
               levy is required to be _paid. In accordance with Se.c1ion 77.(1) of the Act, Council is
               required to sight the approved form issued by the Building and Construction Industry
               (Portable Long Service Leave) Authority that confirms that the requirements of the Act
               have been satisfied. A statutory declaration outlining the cost of the operational works
               must be submitted to Council with the lodgement of any application for operational works
               over the site.


        5.     The   development should be undertaken and operated in a manner that causes no
               detrimental effect upon the amenity of the neighbourhood by reason of the creation of
               excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
               odours) nuisance or any other emissions in accordance with the nuisance provisions of
               the Environmental Protection Regulation 1998 or Council’s Local Law No. 12      Control                           -




               of Nuisances.

        6.     In accordance with the Environmental Protection (Water)Policy 1997, all sand, silt, mud,
               paint, cement, concrete, -builder’s waste or rubbish should -not be permitted to enter or
               be placed where it could reasonably be expected to move into a roadside gutter, storm
               water drain or a watercourse. On the spot fines apply for such offences.


                                                                                             -,



       :~~~~&\:~~\’RRQ.R -R:t:rtN T~S)*i1~A~,<::.~’;~~!j;
                                                                                     ,




                                                               ’.’        .....: ;’,’             ..’;’ ...;.....,..




        Not Applicable


  1 ~:1 gg;::;~;:~B:F{ LlMfNARY~ARRFi vA4:bYERRiDINOd PLA~N I NG "’~CH,EfV!E
        Not Applicable


  h~t~1:<#gitl;,UzJdR H R.’PEVEL .F?,!VI Nnp RlYIITS’.~ QUIRED                                                                                1

        For the following classes of work associated with development, a Development Permit for
       Operational Works must be obtained prior to commencement of works relating to that class of
       work. The application may combine any or all of these classes of work:                                          -




        1.1    Site Civil Works

        1.2    Roadworks

        1.3    Stormwater Drainage

        1.4    Frontage works
       1.5    Water reticulation

       1.6     Landscaping


  LM~i~-~i~1~,SELF;i~$,S~Ss’AB E ’C9PES
                                                                     .

                                                                     -:~;’. 1:
                                                       .:,.-                     .
                                                                                         .

                                                                                                                                     "
                                                                                                                                         "1
       Not Applicable


  1-1.3..f;Y~ ’:sJJB.M1S~I NS.\~,;,-,..   "","-


                                                                                                                                         }   :1
       Not Applicable

Page 20

~
    fill..




                                                                                                                                                        152004.240078.1
                                                                                 .
                                                                 .




                                                                                                                       N; rlf"’     +,.;,W’ ,’’’r:H’’ ~~S’ ’C.....H.E’. ’:M"’E""""’C::’;:I
                                                                                           .




     V’;f4:’I!!,"’\;’~~:’’’’’’’’^;~S’ ’>~)S"’"j"G:"’R’ ’;~’U:"N" D’SJ:~
                                  ’



                                                                  "i ,;!<~’"’R’’< ^’’P’R’ R’ O’ \"’A’Y,<,O’ Esn,TE~C’,y.,
      :’::,i~’~5,y.1rf!\1ft~,~~..; ’,:I’L :W" ",:Y.’,’                       ;  {t\    ; .’:
                                                                                             ,."’~ 4, :.~’. r:..’~        I;’,"_
                                                                                                                          ’"
                                                                                                                                 \;1’,1’;".. "I" (-’."              "   , .,

                                                                                                                                                                                  ’~~.:;:~.

       Not Applicable


      i\’:15’~UR’                 F<:4RRE                     N:!\\Y:~t’~~P \<Y:;j.>t\l~
      f’
         J~j~.~~~~1:.."" Hq-S1,,:<"-::\f’>
                                 .:   ’"   ~.     .,;;       ,’f.(:;~~~~: ’~;:c.~t)~(~.


       You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
       the Sustainable Planning Act 2009 is attached.


       During the appeal period, you as the applicant may suspend your appeal period and make
       written  representations to Council about the conditions contained within the development
       approval. If Council agrees or agrees in part with the representations, a "negotiated decision
       notice" will be issued. Only one "negotiated decision notice" may be given. Taking this step
       will defer your appeal period, which will commence again from the start the day after you
       receive a "negotiated decision notice". (Refer to Part 8 "Dealing with decision notices and
       approvals" Division 1 "Changing decision notices and approvals during applicant’s appeal
                             -




       period" of the Sustainable Planning Act 2009.)                                           .




      ;~lf3:~m#;!; tHER;pETA LS’>.’.",:’{;’:.’<A B~;;; ;,;\j~’::, \;(\:/i

       If you wish to obtain more information about Council’s decision, electronic copies are available
       on line at         www.sunshinecoast.qld.gov.au. or at Council Offices.

       Yours faithfully
                                             ’~




                      iJjL__
       DENIS WALLACE
       SENIOR DEVELOPMENT PLANNER




       Ene:          Appeal Rights

Used in these records

About this file

File size
13.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request change to an approval 152004.240078.4.pdf · 13.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.