Council archive · source document
16394 DA Form 1 · OPW19/0242
Attached to the e-mail Pontoon Application OPW19/0242 - 172 Gympie Tce, Noosaville.
12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot
Lot on plan description Area (m2) Lot on plan description Area (m2)
12.2) What is the reason for the boundary realignment?
13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)
Existing or Width (m) Length (m) Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?
Road work Stormwater Water infrastructure
Drainage work Earthworks Sewage infrastructure
Landscaping Signage Clearing vegetation
X Other – please specify: PONTOON
14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
Yes – specify number of new lots:
X No
14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
$
PART 4 – ASSESSMENT MANAGER DETAILS
15) Identify the assessment manager(s) who will be assessing this development application
?????
16) Has the local government agreed to apply a superseded planning scheme for this development application?
Yes – a copy of the decision notice is attached to this development application
Local government is taken to have agreed to the superseded planning scheme request – relevant documents
attached
X No
PART 5 – REFERRAL DETAILS
17) Do any aspects of the proposed development require referral for any referral requirements?
Note: A development application will require referral if prescribed by the Planning Regulation 2017.
No, there are no referral requirements relevant to any development aspects identified in this development application –
proceed to Part 6
Matters requiring referral to the Chief Executive of the Planning Regulation 2017:
Clearing native vegetation
Contaminated land (unexploded ordnance)
Environmentally relevant activities (ERA) (only if the ERA have not been devolved to a local government)
Fisheries – aquaculture
Fisheries – declared fish habitat area
Fisheries – marine plants
Fisheries – waterway barrier works
Hazardous chemical facilities
Queensland heritage place (on or near a Queensland heritage place)
Page 5
DA Form 1 – Development Application details
Version 1.1— 22 JUNE 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
16394 DA Form 1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 237 KB (small file)
- File type
No other editions are linked here.