07/1530 - MCU - Detached House [As Published] · 132007.1530
INTEGRATED PLANNING ACT 1997
State-controlied road matters
For more Information refer to Guide 3.
Unless you answered “none of the above" to Q2,
the application triggers referral to the Depariment|
of Main Roads (DMR) as a referral agency.
In certain circumstances DMR will be an advice
agency. while in other Grcumstances DMR will
be a concurrence agency,
Schedule 2 of the IP Requlation wil assist you to
determine where DMR is an advice or
concurrence agency for the application.
IDAS Assessment Checklist, Version 20, 2 April 2007
2. The application involves: (tick appticable boxes)
(1) devetopment on land contiguous" to a State controlled road and for -
(1 (a) material change of use assessable against the planning scheme;
(0) reconfiguring a lot unless -
+ the total number of lots is not increasad; and
« the total number of lots abutting the State-controlled road is not increased;
[1 ©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)-
« associated with access to a State-controlled road; or
«for filling or excavation; or
involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm: that directs stormwater to a
State-controlled road.
D2 @i) devetopment on land not contiguous to a State-controlled road and -
(0 @) material change of use -
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the iP Regulation and exceeding the thresholds set by
that schedule;
(0 (®) reconfiguring a lot for a purpose mentioned in schedule 5 of the {P regulation
and exceeding the thresholds set by that schedule;
(© operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)-
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the iP Regulation and exceeding the thresholds set by
that schedule.
mi none of the above
Ciearing vegetation
For more information refer to Guide 12.
Unless you answered ‘none of the above" to Q3,
‘the application requires assessment by the
Department of Natural Resources and Water
(NRW).
It an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in ratation
to this matter.
it you teked Q3(i) or (ii). your apptication requires
referral to NRW for assessment regardess of
whether vegetation clearing is proposed oF not.
The application involves: (tick appticate boxes)
O(i) material change of use -
(a) assessable against the planning scheme;
(b) ona lot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot-
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Fom 1
aw none of the above.
Oi)
(b)
Diiii
Strategic port land
For more information refer to Guide 1},
If you ticked (i) - the rdevant Port Authority is the
assessment manager for the application.
Wi you ticked (@) Queensland Transport is a
concurrence agency for the application.
4. The application involves:
C1 @ development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
Act) - complete Part lof Form 1
U1 (i) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part t of Form 1
iii none of the above
4 Land contiguous to a State-contraled road is defined in schedule 14 of the IP Regulafion to meantand - if part of thetandis within 100m of the State-contrdled road, or that is part of a future State-
contrdled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1530 - MCU - Detached House [As Published]Related documentApplication case desk ↗
0015CEE1.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.