Council archive · source document
07/1530 - MCU - Detached House [As Published] · 132007.1530
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Operational work that is tidal work or |9. The application involves operational work that is: ( tick the appicable box/es)
work in coastal management distect | [7] ()_ tidal work" es defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed sal work in Coastal Act) that is not prescribed tidal work - camptete Part M of Form I, Of
tocal government tidal areas refer to Guide 24 (1 (i) tidal work that is prescribed tidal work"' other than in a canal'? -complete Pant P of Form 1;
Unless you answered “none of the above” to G9,
the application requires assessment by the oO
Environmental Protection Agency (EPA). (0 ii) caried out within a coastal management district under the Coastal Act and for - complete
Hf an agency other than EPA is the assessment Part M of Form 1 if any box/es (a) to (7) below are ticked.
Ce ee aa fr he cotcaton in (1@) constructing or installing works in a watercourse between MHWS and HAT (ie
felation to this matter. other than those works in tidal wateg where the development has been determined not
Local government is the assessment manager to be assessable against the Water Act 2000;
{or af prosoribed tal werk, C10) constructing a canal intended to be connected to tidal waters;
[L1(©)_ constructing an artificial waterway;
(1(@)_ reclaiming tand under tidal water;
(Ce) disposing of dredge spoil or other solid waste material in tidal water;
(1 | interfering with quarry material on State coastal land above high-water mark;
(1 (9) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(1 (h) removing or interfering with coastal dunes on tand, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(Q)_ constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
Aw none of the above.
Operational work betow high water 10. The application involves operational work that is: (tick the applicable box/es)
mark (1q@) tidal work’ as defined under the Coastal Protection and Mana\
A , igement Act 1995 (the
Co tee ent eset a workin Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Of
ere Nisssiiihenrred C1 (id tidal work that is prescribed tidal work" - complete Part P of Form 1;0f
ato, the application triggers referral to LD (ii) cared out within a coastal management district'S under the Coastal Act and for -
Gugersiand Tapson (27 Mattie Sate Ce) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager Mot Form r .
for al prescribed tidal werk. (100) reclaiming land under tidal water - complete Part M of Form 1, oF
(©) constructing a canal, if the canal is associated with reconfiguring a lot - compete
Part M of Form T,
aw none of the above.
Coastal management 11. The application involves: (tick the applicatte boxes)
For more information refer to Guide 18 O() a material change of use assessable under a planning scheme invotving operational
anes you orentonrondres es the ant the work carried out completely or partly in a coastal management district
Environmental Protection Agency (EPA). (1 (i) a material change of use assessable under a planning scheme involving building
If an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is ~
cae aye tate sxiiston in + the construction of a new premises with a GFA'S of at least 1000m?
relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m?
Di dill) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
CA (v) reconfiguring a lor” assessable under schedule 8 of the IPA and in connection with
the construction of a canal - complete Part M of Form 1
am none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regufation 2003 and includes certain tidal works completely or party within a tocal government tidal area.
12 Cana means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is definedin sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain Sida works completely or party within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under lhe Coastal Protection and Management Act 1995, other than an area dedared as 2
coasta management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
47 Under 8117 of the Coastal Protection and Management Act 1995, an apglication for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the ariificial waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1530 - MCU - Detached House [As Published]Related documentApplication case desk ↗
0015CEE1.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.