Revised Stormwater Management Plan

Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.

Attached to the e-mail Response to SEQ Water Third Party Advice - MCU16/0066 & OPW16/0133.

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
am
COVEY

ASSOCIATES PTY LTD

Consulting Engineers

 

STORMWATER MANAGEMENT PLAN
HIGHWAY SERVICE CENTRE
COOROY
FOR
HASS HOLDING ATF THE QUASAR TRUST

DATE: OCTOBER 2016
PROJECT No: 161968
REPORT No: 100415 RPT ISSUE B

Maroochydore | Gladstone | Rockhampton | Tamworth www.covey.com.au

 
Log in to download the original file

Revised Stormwater Management Plan.pdf · 4.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 41 pages

Page 2

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                              Location: Taylor Court, Cooroy


                           DOCUMENT ISSUE APPROVAL

Project No:           161968


Title:                Stormwater Management Plan


Client:               Hass Holdings ATF The Quasar Trust


Date:                 October 2016


Issue:                B


Distribution:         Hass Holdings ATF The Quasar Trust – One (1) copy
                      Noosa Shire Council – One (1) copy
                      Covey Associates Pty Ltd – One (1) copy




© Copyright Covey Associates Pty Ltd (2016).

This document is the property of Covey Associates Pty Ltd. This document and the information
contained in it are solely for the use of the authorised recipient and this document may not be
used, copies of reproduced in whole or part for any purpose other than that for which it was
supplied by Covey Associates Pty Ltd. Covey Associates Pty Ltd makes no representation,
undertakes no duty and accepts no responsibility to any third party who may use or rely upon this
document or the information contained in it.

COPYRIGHT NOTICE:             Parts of this document contain material originally prepared by:

This material is the intellectual property and copyright of Covey Associates Pty Ltd.




Author: Jennifer Mullaney                                 Reviewed: Jade Mohr
MA (Hons), PhD                                            BEng (Civil)




Reviewed: Chris Walker                                    Reviewed: Chris Camp
BEnvSc, BSc (Hons), PhD, CPESC                             BEng(Hons), RPEQ 4944

Page 3

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                 Location: Taylor Court, Cooroy

                                       CONTENTS

1.0 INTRODUCTION                                                                       1

2.0 SITE DESCRIPTION                                                                   1

    2.1    Site Location                                                               1

    2.2    Previous Land-use, Topography and Drainage                                  2

    2.3    Proposed Land-use                                                           2

3.0 WATER QUALITY AND TREATMENT OBJECTIVES                                             2

    3.1    Water Quality Objectives                                                    3

    3.2    Area of Treatment                                                           3

    3.3    Non-treatment Areas                                                         3

4.0 WATER QUALITY MODELLING ASSESSMENT/APPROACH                                        4

    4.1    Scenario Methodology                                                        4

    4.2    MUSIC Model Parameters                                                      5

    4.3    Land Use/Source Node Areas.                                                 5

    4.4    Proposed Stormwater Treatment Train                                         6

    4.5    Pollutant Reduction Results                                                 6

5.0 MAINTENANCE PERIOD                                                                 7

    5.1 Bioretention Basin                                                             7
   5.1.1 Maintenance During ‘Construction Phase’                                       7

6.0 STORMWATER QUANTITY                                                                8

    6.1    Stormwater Quantity Management                                              8

    6.2    Hydrology (XP-RAFTS)                                                        8

    6.3 XP-RAFTS Data                                                                  8
   6.3.1 Model Scenarios                                                               8
   6.3.2    Rainfall Intensities                                                       8
   6.3.3    Existing and Proposed Development Areas                                    9
   6.3.4    Initial and Continuing Losses                                              9
   6.3.5    Pervious and Impervious Areas                                              9
   6.3.6    Manning’s Values                                                          10
   6.3.7    Catchment Slope                                                           10
   6.3.8    Storm Durations                                                           10

Page 4

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                       Location: Taylor Court, Cooroy
    6.4 Calibration                                                                         10
   6.4.1 Rational Method                                                                    10

    6.5 Design Discharges Unmitigated                                                       10
   6.5.1 Peak Durations                                                                     10

    6.6 Stormwater Detention                                                                11
   6.6.1  Detention Tank                                                                    11

7.0 CONCLUSIONS AND RECOMMENDATIONS                                                        12

REFERENCES                                                                                 13

______________________________________________________________________________



                              LIST OF APPENDICES
APPENDIX A     Site Layout Plan by Reddog Architects
APPENDIX B     Stormwater Management Plans by Covey Associates
APPENDIX C     MUSIC Concept Map
APPENDIX D     Stormsack Details
APPENDIX E     Water and Sewage Demand Table
APPENDIX F     Stormwater Quantity Catchment Plans
APPENDIX G     Rainfall Data, Rational Method Data and Results

Page 5

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                            Location: Taylor Court, Cooroy

1.0 INTRODUCTION
This Stormwater Management Plan (SMP) contains information regarding the stormwater
management strategies for a proposed Highway Service Centre, including a fast food outlet at
Taylor Court, Cooroy. This report refers to the stormwater quality and quantity treatment measures
proposed of the site in its entirety.

The site is identified to be located within the catchment area for Lake Macdonald. The application
has previously been assessed against Seqwater Development Guidelines: Development
Guidelines for Water Quality Management in Drinking Water Catchments. Third party advice from
Seqwater (ref CE:DB F.16/3997) requested further detail in relation to the Water Quality
Objectives and the annual rainfall used for water quality modelling.

Noosa Shire Council (NSC) requires that stormwater be appropriately managed prior to discharge
from the site. The Queensland State Planning Policy (2014) and Seqwater Development
Guidelines also requires that urban development projects demonstrate how the potential impacts
to receiving environments are mitigated.

2.0 SITE DESCRIPTION
2.1 Site Location

The site is located at 6 Taylor Court, Cooroy. The real property description is Lot 3 on SP197517
(Figure 1). The site is bounded by vacant land to the west and south, Taylor Court exists to the
east and Holts Road and the Bruce Highway to the north (Figure 2). The site is adjacent to the
newly upgraded section of the Bruce Highway.

A Site Plan is presented in Appendix A for additional information and details of the proposed
development.




                                                       Site
                                                       Area




                                       Figure 1 - Site area




Covey Associates Pty Ltd                    1                                     Project No: 161968
Consulting Engineers                                                                 100415 Rpt Iss B

Page 6

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                   Location: Taylor Court, Cooroy




                                               Site
                                               Area




                 Figure 2 - Site Locality (image accessed from Nearmap on 11 August 2015)

2.2 Previous Land-use, Topography and Drainage

The site is currently vacant land and was previously used as a temporary depot for the machinery
used for the upgrade of the Bruce Highway. The site predominantly drains from north to south, with
an approximate slope of 4%.

2.3 Proposed Land-use

The overall site area is approximately 8243m2, with the area of the proposed new development
utilising the entirety of the site. The proposed development for a highway service centre includes
the service station bowsers, fast food outlet, service station, children’s play area, services, truck
parking and associated carparking and landscaped areas.

A Site Plan is located in Appendix A for further detail.

3.0 WATER QUALITY AND TREATMENT OBJECTIVES
This SMP will demonstrate how the proposed stormwater management strategy complies with the
requirements of the Noosa Shire Council (NSC) and the State Planning Policy (2014), in terms of
demonstrating how the relevant stormwater pollutant reduction objectives will be met. Discharge
from the site must achieve pollutant load reduction targets (Table 1) and be demonstrated through
use of the appropriate modelling software.

                      Table 1 – Pollutant Reduction Targets for South East Queensland
          Pollutant Type                                   Reduction Objective
   Total Suspended Solids (TSS)     80% reduction in average annual load of pollutants
   Total Phosphorus (TP)            60% reduction in average annual load of pollutants
   Total Nitrogen (TN)              45% reduction in average annual load of pollutants
   Gross Pollutants (GP)            90% reduction in average annual load of pollutants



Covey Associates Pty Ltd                        2                                        Project No: 161968
Consulting Engineers                                                                        100415 Rpt Iss B

Page 7

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                              Location: Taylor Court, Cooroy


3.1 Water Quality Objectives

The nearest water course to the site is a tributary of the Six Mile Creek and is located within the
Mary River Basin Catchment Plan. The Environmental Protection Water Policy 2009 South East
Queensland Map Series (Plan WQ1381) identifies the watercourse to be lowland freshwaters.
Table 2 outlines the specific performance criteria required within lowland freshwaters in the Mary
River Basin Environmental Values and Water Quality Objectives – Basin No. 138 (part) including
all tributaries of the Mary River (Department of Environment and Resource Management, 2010).

                                   Table 2 – Site Stormwater Quality Objectives
                                Pollutant                 Water Quality Objectives
                                                           Lowland Freshwater Values
                           Suspended Solids (SS)   <6 mg/L (annual mean concentration)
                           Total Phosphorus        <50 µg/L (annual mean concentration)
                           Total Nitrogen          <500 µg/L (annual mean concentration)
                           Turbidity               <50 NTU
                                                   Aim for no visible oils, petrochemicals, films
                           Hydrocarbons
                                                   or odours
                           Dissolved Oxygen        85 – 110 % saturation
                           Chlorophyll-a           5 µg/l
                           pH                      6.5 – 8.0
                           Litter                  Aim for no anthropogenic material greater
                                                   than 5 mm in any dimension.


3.2 Area of Treatment

The total area of the site to be treated is approximately of 7570 m2. The site has been modelled as
one (1) catchment. The catchment consists of the north exit point, car and truck parking, service
area and food outlets and the landscaped areas. Refer to the Site Plan in Appendix A for further
details.

3.3 Non-treatment Areas

The southern entry/exit point at the site onto Taylor court is unable to be treated due to the site
topography. This area comprises 673 m2 of the site and is not considered likely to cause adverse
impacts to the surrounding environment due to its small area. This area has been included within
the model as untreated road and untreated landscaping area. It is proposed to capture this area of
untreated runoff within a grated channel across the entry/exit driveway. A SPEL Stormsack will be
installed within a chamber at the end of the grated channel to provide some treatment to the runoff
and remove any suspended solids. As this area is not treated by the tertiary treatment devices on
site, it is referred to as untreated. Refer to Figure 3 for details on the untreated area.




Covey Associates Pty Ltd                              3                                             Project No: 161968
Consulting Engineers                                                                                   100415 Rpt Iss B

Page 8

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                            Location: Taylor Court, Cooroy




                           Treated Area

                                                                     Untreated Area




                                          Figure 3 Catchment Areas

4.0 WATER QUALITY MODELLING ASSESSMENT/APPROACH
4.1 Scenario Methodology

The site was modelled using split catchment source nodes, comprised of roof area, road area and
groundcover nodes. The hardstand area of pavement and outdoor dining area has been modelled
as groundcover at 100% impervious. The stormwater treatment proposed for the site consists of
one (1) rainwater tank, nine (9) Stormsacks and one (1) bioretention basin.

The runoff within the area beneath the service station bowser canopy will be captured by a grated
channel surrounding the area and directed to a holding tank. This will reduce the risk of any
potential runoff containing hydrocarbons entering the stormwater network in the event of a spill.
The holding tank will be monitored and emptied when required, particularly prior to a large rain
event. Roof runoff from the canopy will be directed to the bioretention basin for treatment.

Refer to Stormwater Quality Management Plan in Appendix B.

4.2 Stormwater Reuse

The proposed main use of the site is a service station with associated facilities and parking. The
proposed development consists of the service station bowser area, service and shop area, fast
food restaurant, drive through, outdoor dining area and associated parking and landscaping. The
water reuse at the site has been based upon the recommended rainwater tank demands for a toilet
in a commercial setting stated in Water by Design (2010) guidelines. The water use estimate per
person per day for a toilet with some water saving devices is 40L. The reuse estimated for the
service station and fast food area were based upon the water demand table produced by Gold
Coast City Council (Appendix E). The GCCC guidelines base the water use for the different land
uses upon the gross floor area (GFA) of the land use. Each land use has a different equivalent
person (EP) rate applied. The pedestal usage of 40 L/day has been applied per EP required.
Reuse for landscaping has also been included within the model based upon the guidelines in
Water by Design (2012). A conservative estimate of 600mm per m2 per year was assumed.

The following equation was used to calculate the reuse volume required to size the proposed
rainwater tank.
Covey Associates Pty Ltd                         4                                Project No: 161968
Consulting Engineers                                                                 100415 Rpt Iss B

Page 9

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                               Location: Taylor Court, Cooroy

(1) Fast food area:                             0.14 EP x 40 L/day x number of seats (70)
                                                = 392 L/day
(2) Service Station Shop:                       3.96 EP (per 100 m2/GFA) x 195 m2 (1.95 GFA) x 40 L/day
                                                = 309 L/day
(3) Landscaping                                 1940 m2 x 0.60m (annual irrigation application)
                                                = 1164 KL/year
                                                = 3189 L/day
Total:                                          3890 L/day (3.9 KL/day)
Annual:                                         1420 KL/yr

The reuse estimates for the site is calculated based upon WSUD (2010) and GCCC Water
Demand Guidelines to be 3.9 kL/day which equates to 1420 kL/yr. A rainwater tank of 20,000 L
has been proposed based on the historical requirements of 15L per m2 of roof area. This provides
an additional storage volume of approximately 10,000L. All of the roof area of the service station
(766m2) stormwater is to be directed to the rainwater tank. Roof area from the canopy will not be
directed to the tank.

4.3 MUSIC Model Parameters

The MUSIC Modelling Guidelines – South East Queensland Version 1.0 (2010) was used to
source base and storm flow concentrations and runoff generation. The model was calibrated using
the Bureau of Meteorology (BOM) data from Cooroy Composite, 1973 - 1983, at a 6-minute time
step. The annual rainfall data for this site and timeframe used is in Table 3 below. This is in
accordance with Water by Design’s MUSIC Modelling Guidelines – South East Queensland
Version 1.0 (2010). All source nodes were set up in accordance with this guideline, specifically for
split catchments. The source nodes were set up as ‘commercial’ due to the site characteristics
being similar to those in a commercial area. No routing of drainage links was adopted for the
purpose of taking a conservative approach. This approach assumes that the flow through the
drainage system takes no time, which over estimates the likely pollutant load.
                                                 Table 3 Annual Rainfall
Year                1973     1974      1975       1976       1977    1978      1979     1980     1981      1982     1983
Annual
                    2135.5   2796.1    1178.9     2108.7     950.2   1468.5    1023.7   1232.4   1507.3     1332    2040.8
Rainfall (mm)

4.4 Land Use/Source Node Areas.

The proposed development has been treated as one (1) catchment. The catchment has further
been divided into contributing roof, landscaping, hardstand and road area. Refer to Table 4 for
details. A MUSIC model concept map is located in Appendix C.

                               Table 4 – MUSIC Source Node Attribute Summary
                                                                              Area
                                          Source Node
                                                                               (ha)
                                               Roof                           0.077
                                           Canopy Roof                        0.035
                                              Road                            0.445
                                           Landscaping                        0.182
                                            Hardstand                         0.017
                                         Untreated Road                       0.054
                                      Untreated Landscaping                   0.013
                                              Total                           0.823




Covey Associates Pty Ltd                                 5                                              Project No: 161968
Consulting Engineers                                                                                       100415 Rpt Iss B

Page 10

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                      Location: Taylor Court, Cooroy




                                         Figure 4 MUSIC Model Layout
4.5 Proposed Stormwater Treatment Train
A 20,000 litre rainwater tank is proposed to collect and treat roof stormwater runoff. The remaining
areas of the site will receive primary treatment via SPEL Stormsack’s installed in each stormwater
pit on site – Refer to Appendix D for details. The proposed tertiary treatment to discharge off site is
a Bioretention Basin. Refer to Table 5 for bioretention basin sizing. Filter media is established to a
depth of 0.5 m, with a 0.1 m and 0.2 m transition and drainage layer, respectively. The extended
detention depth is 0.3 m.
                            Table 5 –Type and Size of Stormwater Treatment Device
            Stormwater Treatment Device       Detail
            Catchment 1
            Rainwater Tank                                            20,000 L
            SPEL Stormsacks                                           Nine (9)
            Bioretention basin                          115 m2 Surface Area, 90 m2 Filter Area

4.6 Pollutant Reduction Results
MUSIC modelling of the proposed stormwater treatment strategy for the site was performed to
ensure the identified load based pollutant reduction objectives were achieved. MUSIC version 6.2
has been used to model the effectiveness of the designed stormwater treatment trains.

The target reductions in stormwater pollutants are based on a comparison of an unmitigated
scenario i.e. having no treatment on site, and the mitigated scenario, which has stormwater
treatment measures incorporated into the site. The results of the MUSIC models for the each
catchment and the overall site can be found in Table 6 and demonstrate that compliance has been
met or exceeded for all the required pollutant load reduction objectives stated in the State Planning
Policy (2014) at catchment and site level.

                            Table 6 – MUSIC Results –Treatment Train Effectiveness
                                                           Reduction        Target
                           Unmitigated    Mitigated
         Pollutant                                         Achieved        Reduction      Compliance
                             (kg/yr)       (kg/yr)
                                                              (%)             (%)
            TSS               3410           498                86             80                Y
             TP               6.39           1.16               82             60                Y
             TN               35.1           11.2               69             45                Y
            GP                 234            0                100             90                Y
Covey Associates Pty Ltd                            6                                        Project No: 161968
Consulting Engineers                                                                            100415 Rpt Iss B

Page 11

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                Location: Taylor Court, Cooroy

As the results in Table 6 demonstrates, the stormwater quality management strategies proposed
for the proposed Highway Service Station far exceed the target reduction rates required by the
NSC and the State Planning Policy (2014). The pollutant reduction rates exceed those required by
NSC and SPP to ensure the concentration of pollutants discharging from the site are close to the
WQOs for freshwater within the Lake Macdonald catchment as per Table 2. Table 7 below
indicates the daily concentrations of pollutants determined to potentially leave the site identified
through MUSIC modelling.
                                       Table 7 Daily Pollutant loads

                           Pollutant          WQOs                 MUSIC Model
                             TSS                    6                  18
                             (mg/l)
                              TP                 50                    42.1
                             (µg/l)
                              TN                500                    525
                             (µg/l)


5.0 MAINTENANCE PERIOD
5.1 Bioretention Basin

The proposed bioretention basin will require consideration and management during both the
construction and operational phases of the development. In order to establish vegetation and
treatment functions in the bioretention system, the filter media must be protected from pollutants
commonly generated in the construction phases. During the operational phase, regular
maintenance of bioretention system is required to ensure comprehensive vegetation
establishment, a critical component in stormwater pollutant uptake. Below are details on the
general maintenance periods and requirements for the construction and operational periods.

5.1.1 Maintenance During ‘Construction Phase’

Erosion and sediment control devices will be installed at the commencement of all the staged
works to capture and treat runoff during construction works. The sediment control devices should
be cleaned out as required and at the end of the works. During the construction stage, all sediment
control devices are to be inspected weekly, after runoff generating rain events and prior and after
prolonged site shut downs (e.g. holiday periods).

Following construction of the roadways and buildings on site the basin will be constructed to the
final design and filter media layers and plants will be installed. Leaving the completion of the
bioretention basin until after construction is completed will prevent any potential clogging of the
system during the construction period.

5.2 Rainwater Tank and Stormsacks

Maintenance for the proposed rainwater tank and Stormsacks will follow manufacturers guidelines
and recommendations to maintain the products lifespan.




Covey Associates Pty Ltd                        7                                     Project No: 161968
Consulting Engineers                                                                     100415 Rpt Iss B

Page 12

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                               Location: Taylor Court, Cooroy
6.0 STORMWATER QUANTITY
The proposed stormwater quantity management for this site ensures non-worsening of flows as a
result of the proposed development. Development of the site will result in an increase in
impervious area and a corresponding increase in peak stormwater runoff rates which will be
mitigated through on-site detention. This section of the report encompasses the hydrological and
hydraulic analysis for the proposed development and identifies the stormwater detention measures
required to ensure non-worsening conditions.

6.1 Stormwater Quantity Management

An analysis of the stormwater (quantity) required for the site, involved the following processes:

      Determining the overall catchment areas contributing to flow from the proposed development
       site;
      Calculating the 1%, 10% and 39% Annual Exceedance Probability (AEP) peak discharges
       using XP-RAFTS for existing case;
      Rational method calculations for comparison and calibration of the XP-RAFTS runoff model
       to ensure the accuracy of results; and
      XP-RAFTS detention modelling for the 1%, 10% and 39% AEP design discharges to
       demonstrate that peak discharges are mitigated in the developed case and flows leaving the
       site are ‘non-worsening’.

6.2 Hydrology (XP-RAFTS)

XP-RAFTS was utilised to determine the peak stormwater discharges for the subject site for pre-
development and post-development scenarios.

The proposed development site has an area of 0.824 ha. The site receives a very small upstream
catchment which when combined with the site area gives a total area of 0.924 ha. The majority of
this upstream area is a landscaping buffer between the site and Holts Road.

6.3 XP-RAFTS Data
6.3.1 Model Scenarios

The existing and proposed conditions for the 1%, 10% and 39% AEP events were modelled in XP-
RAFTS to determine the peak stormwater flows for the site.

The three scenarios modelled for this investigation are:

      CSS_E01b - represents the existing characteristics of the subject site (pre-development);
      CSS_D01b - represents the subject site as fully developed (no detention); and
      CSS_M01b - represents the subject site as fully developed and the effects of the proposed
       detention tank.

6.3.2 Rainfall Intensities

The rainfall intensities used in XP-RAFTS are typical to Cooroy and were generated from the
Bureau of Meteorology’s online IFD data website (accessed 30 May 2016). The rainfall intensity
tables are contained in Appendix G.




Covey Associates Pty Ltd                     8                                       Project No: 161968
Consulting Engineers                                                                    100415 Rpt Iss B

Page 13

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                                Location: Taylor Court, Cooroy

6.3.3 Existing and Proposed Development Areas

The total catchment area has been modelled as one (1) catchment. The existing and proposed
catchment boundaries are the same for each modelling scenario. Refer to Figure 5 for the
stormwater quantity catchment boundary. Refer to Appendix F for a detailed Stormwater Quantity
Catchment Plan.




                               Figure 5 Stormwater Quantity Catchment Boundaries

6.3.4 Initial and Continuing Losses
Initial and Continuing Rainfall Loss parameters were adopted as per Table 8.

                                      Table 8 – Initial and Continuing Losses

                                          Pervious Catchments                     Impervious Catchments

                                      Initial Loss              Cont. Loss      Initial Loss         Cont. Loss
                 Event                   (mm)                    (mm/hr)           (mm)               (mm/hr)
               AEP 1%                     0                        2.5               0                   0
          AEP 10% and 39%                12.5                      2.5               0                   0

6.3.5 Pervious and Impervious Areas

The proposed development site and external catchment in its existing state has a total area of
0.924 ha and is completely pervious.

The proposed development and external catchment has a total area of 0.924 ha and a proposed
impervious area of 0.63 ha for the developed case, equating to 62%. This will increase total
contributing catchment’s percentage impervious from 0% to 62%.

All pervious and impervious areas for the existing and developed scenarios are detailed in Table 9.

                           Table 9 – Existing and Developed Catchment Areas and Slopes
                             Catchment           Area               Pervious     Impervious            Slope
                                                     (ha)                (ha)            (ha)            (%)
        Existing             Site                0.92                    0.92           0                5
        Developed            Site                0.92                    0.29         0.63               5

The stormwater quantity catchment boundaries are shown in Appendix F.
Covey Associates Pty Ltd                                    9                                         Project No: 161968
Consulting Engineers                                                                                     100415 Rpt Iss B

Page 14

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                   Location: Taylor Court, Cooroy

6.3.6 Manning’s Values

Manning’s values varied due to the differing catchment characteristics / land uses and were
applied independently to the catchment. The values were generally adopted as follows:

     Pervious Area, n = 0.032; and
     Impervious Area, n = 0.018.

6.3.7 Catchment Slope

The Equal Area method was used to determine the catchment slope, which is summarised in
Table 8. The catchment slope in the developed case is unchanged from the existing case scenario.

6.3.8 Storm Durations

Standard storm durations of 15, 20, 25, 30, 45 60 and 90 minutes were modelled to estimate the
peak discharge.

6.4 Calibration

6.4.1 Rational Method

Rational Method calculations were undertaken for the site for calibration of the existing case XP-
RAFTS model – Table 10.
Variable         Value        Units
Area:            0.924        ha
Tc               5.9          minutes
C10              0.68         fraction

                                   Table 10 - Rational Method Calculations
                            Variable                1% AEP   10% AEP    39% AEP
                            Freq Factor              1.2       1.0        0.85
                            Intensity (mm/hr)       299.5     205.2      149.1
                            Discharge (m3/s)        0.628     0.358      0.221

The Rational Method Calculations for the 1%, 10% and 39% AEP events generally reflect results
from the XP-RAFTS model. Thus, the XP-RAFTS peak flows have been adopted for hydrological
modelling and detention sizing purposes. A comparison of the results is provided in Table 11.

                           Table 11 - XP-RAFTS and Rational Method Comparison
                                         Rational       XP-RAFTS       Difference
                             AEP          (m3/s)          (m3/s)           (%)
                              1%          0.628           0.630            0.4
                             10%          0.358           0.357            -0.4
                             39%          0.221           0.219            -1.1

6.5 Design Discharges Unmitigated

6.5.1 Peak Durations

Temporal patterns from Australian Rainfall and Runoff, Volume 2, (1987) have been adopted for
each storm duration. A range of storm durations were analysed to determine the peak discharge
for the catchment. Table 12 presents the flows generated using XP-RAFTS from design storms at
the proposed development site for the existing and developed (unmitigated) case scenarios.
Covey Associates Pty Ltd                         10                                      Project No: 161968
Consulting Engineers                                                                        100415 Rpt Iss B

Page 15

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                          Location: Taylor Court, Cooroy



                           Table 12 - XP-RAFTS Design Discharges (Unmitigated)
                                                          Existing                Developed
                                                                  Peak                         Peak
                                               Critical                       Critical
                  Catchment          AEP                          Flow                         Flow
                                              Duration                       Duration
                                                                 (m3/s)                       (m3/s)
                                     1%        25 min            0.630        15 min          0.724
                      Outlet         10%       60 min            0.357        25 min          0.518
                                     39%       60 min            0.219        25 min          0.331

The peak flows discharging from the site have increased in the developed case scenario due to the
resulting increase in impervious area. To reduce the flows to meet non-worsening conditions, a
detention tank is proposed to increase detention capacity on site and reduce the offsite flows.

6.6     Stormwater Detention

The pre-developed and post-developed (mitigated) conditions were modelled in XP-RAFTS to
demonstrate that stormwater flows will not be increased with the inclusion of an appropriately
designed storage device. The increases in peak flows have been mitigated on site through the use
of a detention tank. Detention provided by the bioretention basin to treat water quality will also be
utilised on site.

Refer to Site Plans in Appendix B for the proposed detention tank location and details.

6.6.1 Detention Tank

The flows up to 39% AEP will be directed to and will be detained within the proposed bioretention
basin and flow greater than the 39% AEP will be detained within the detention tank located at the
lowest point of the site in the south western corner. A diversion chamber prior to the bioretention
basin inlet will divert all flow above a 39% AEP event to the detention tank. Refer to Stormwater
Management Plan in Appendix B. The bioretention basin has a storage component 1.25 m deep
with a surface area of 115 m2, providing a storage volume of 143.75m3. The proposed detention
tank dimensions are approximately 5 m wide x 10 m long x 2 m high providing a maximum
detention volume of 100 m3. The combined detention volume provided between the bioretention
basin and the detention basin is 243.75 m3 with a minimum available depth of about 2.7 m. The
required detention is 171m3 peaking at a depth of 2.12 m in the 1% AEP event. The tank will slow
release via one (1) 325 mm orifice plate and a weir 1.5 m high and 0.45 m wide discharging into a
chamber and connecting to an existing stormwater network on site. Refer to the Stormwater
Management Plan in Appendix B for detail.

Table 13 summarises stormwater flows, storage volumes and stage height for the required
detention tank.
                               Table 13 - Post-Development Conditions – XP-RAFTS
                                 Stormwater Flows for proposed detention basin
                                                                 Basin                                  Peak
                                         Basin Inflow                            Peak Depth
       Basin               AEP                                  Outflow                                Storage
                                           (m3/sec)             (m3/sec)               (m)               (m3)
                           1%                0.724                   0.624             2.12              171
      Det_tank             10%               0.518                   0.349             1.78              122
                           39%               0.331                   0.211             1.45              73

XP-RAFTS modelling predicts that the proposed detention tank will reduce the post-development
peak stormwater flows for all critical storm events. Refer to Table 14 below for detail.

Covey Associates Pty Ltd                             11                                            Project No: 161968
Consulting Engineers                                                                                  100415 Rpt Iss B

Page 16

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                             Location: Taylor Court, Cooroy

     Table 14 - Comparison of Pre & Post-Development (mitigated) Stormwater flows in XP-RAFTS

                                                Existing                 Mitigated
          Catchment        AEP         Critical      Peak Flow      Critical   Peak Flow
                                      Duration         (m3/s)      Duration      (m3/s)
                           1%          25 min              0.630    25 min        0.624
            Site Area      10%         25 min              0.357    25 min        0.349
                           39%         60 min              0.219    25 min        0.211

7.0 CONCLUSIONS AND RECOMMENDATIONS
As described in Table 6, the stormwater treatment measures selected for the proposed
development achieve the performance criteria set by the NSC and by the State Planning Policy
(2014). Annual load reductions of TSS, TP and TN between the unmitigated and mitigated MUSIC
model scenarios have been met or exceeded. It is considered that a conservative approach has
been taken as no routing in the drainage links has been adopted.

This site based SWMP has demonstrated that the proposed development, when incorporating the
proposed detention strategies, can be undertaken with non-worsening to the quantity of runoff to
downstream environments.

Sufficient consideration of stormwater controls has been demonstrated by:

      Compliance with QUDM (2013)
      Compliance with the requirements of Noosa Shire Council’s Load Based Objectives
      Compliance with the State Planning Policy (2014)
      Compliance with the EPP (Water) 1997
      Compliance with Seqwater Development Guidelines
      Ecological sustainability in terms of the development’s impact upon receiving waters and the
       viability of the proposed site development.

The measures proposed within this report to manage stormwater quality and quantity achieve the
nominated requirements of the State Planning Policy (2014) and NSC. The proposed measures to
treat water quality at the site have exceeded the required pollutant reduction targets required by
the SPP and NSC to ensure the best possible chance of meeting the WQOs for the nearest
watercourse to the site are met to reduce any potential adverse impacts to Lake Macdonald. The
daily loads estimated in MUSIC for TSS and TN are mean values and are only marginally over the
WDOs for the nearest watercourse and due to the low concentrations of the remnant pollutants,
there is no practical or reasonable way to address the remaining concentration. This preliminary
design of the quality and quantity management measures is based on the current and best-
practice principles, and in terms of stormwater quality management, exceeds current best practice
approaches.




Covey Associates Pty Ltd                     12                                      Project No: 161968
Consulting Engineers                                                                    100415 Rpt Iss B

Page 17

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                           Location: Taylor Court, Cooroy


REFERENCES
Department of Environment and Resource Management (2010) Environmental Protection (Water)
     Policy 2009 – Maroochy River Environmental Values and Water Quality Objectives Basin No,
     141 (part) including all tributaries of the Maroochy River

Department of State Development, Infrastructure and Planning (2014) State Planning Policy,
     Brisbane, Queensland.

Institute of Public Works Engineering Australia, Queensland Division Ltd (2013) Queensland Urban
       Drainage Manual, Third Edition.

Noosa Shire Council (2013) The Noosa Plan

Seqwater (2012) Seqwater Development Guidelines: Development Guidelines for Water Quality
    Management in Drinking Water Catchments.

Water by Design (2010) MUSIC Modelling Guidelines – South East Queensland, Version 1.

Water by Design (2014) Bioretention Technical Design Guidelines, Version 1.1.




Covey Associates Pty Ltd                   13                                    Project No: 161968
Consulting Engineers                                                                100415 Rpt Iss B

Page 18

APPENDIX A

SITE LAYOUT PLAN

Page 19

                                                                                                                                                                                                                     1
                                                                                                                                                                                                                   DA-05

                                                                                                   H O L T S            R O A D




                                               SITE BOUNDARY                                             122° 10' 50"   75.04m                                                                                                                                                                       120° 48' 20"        28.239m




                                     SITE BO




                                                                                                                                                             5,000
                                                                                                                                                                                        S2                                                                                                                                                          S1
                                                                                                                                                                                                                       LANDSCAPING




                                                                                                                                                                        SETBACK
                                                                                                                                                                         10,000




                                                                                                                                                                                                                                                                                                                                                            210° 48' 40"
                                       UNDAR                                                                                                                                                                                              ONE WAY
                                         Y




                                                                                                                                                                                                                                                                                                                                                             27.134m
                                                                                                                                                                              1                                                                                    13


                                                                                                                                                                                                                                                                                                                                                                              EXIT




                                                                                                                                                                                             6,400
                                                                                                                                                                                                        CARPARK




                                                                                                                           WAITING BAY
                                                                                                                                                                                     2,700
                     L O T       1                                             L O T           3                                                                         14                                                          22




                                                                                                                                                                                                                                                                                                                                                                  SITE BOU
                                                                                                                                                                     9No CYLCLE
                                                                                                                                                                      PARKING                                                                 23                                                                                  4,000
                                                                                                                                                                                                                                                                                                                                        K
                                                                                                                                                                                                                                                                                                                                 SETBAC




                                                                                                                                                                                                                                                                                                                                                                           NDARY
                                                                                                                                                                                             OUTDOOR                                                                                                                                                5,000




                                                                                                                                                                                                                                                                                                                                                                                                        T A Y L
                                                                                                                                                                                             DINING AREA
                               2                                                                                                                                                                75 m2
                                                                                                                                                                                                                                                                                                                                                                                                                                       1
                             DA-07                                                                                                                                                                                                                                                                                                  34                                                                                               DA-07
                                               202° 08




                                                                                                                                                                                                                                                                                                                                                                                           FOOT P
                                                                                                                                                                                                                                                                                                                                     AIR AND
                                                                                                                                                         COLLECT
                                                                                     OVERFLOW
                                                                                                                                                                                       FAST2 FOOD




                                                                                                                                                                                                                                      2,600
                                                                                                                                                                                                                                                                                                                                                         FUEL




                                                                                                                           LANDSCAPING
                                                      '




                                                                                                                                                                                                                                                                                                                                                                               202° 30'
                                                                                      PARKING




                                                                                                                                                                                                                                                                                                                                                                                               ATH
                                                                                                                                                                                                                                                                                                                                                         VENTS
                                                              LANDSC




                                                                                                                                                                                                                                                                                                                                         WATER
                                                                                                                                                                                       330 m




                                                                                                                                                                                                                                                                                                                                                                                                          O R
                                                                                                                                                                                                                                                                                                                 UNDERGROUND




                                                                                                                                                                                                                                                                                                                                                             LANDSC
                                                                                                                                                                                                                                                                            SERVICE STATION
                                                     86.32m


                                                                APING




                                                                                                                                                                                                                                                                                                                  FUEL TANKS
                                                                                                                                                                                                         DINING AREA                                                        BOWSERS (8No)




                                                                                                                                                                                                                                                                                                                                                                  APING
                                                                1,088 m2




                                                                                                                                                                                                                                                                                                                                                                                     37.233m
                                                                                                                                                                                                         180 m2

                                                                                                                                                         PAY




                                                                                                                                                                                                                                                                                                                                                                                                             C O U R
                                                                                                                         125 m2
                                                                                                                                         DRIVE THROUGH
                                                                                                                                                                                                                                                                                                                                                                      133 m2
                                                                                                                                                                                                                                                                                                                                               36
                                                                       5,000
                                                                                                                                                                                                                                                          UNDERGROUND
                                                                                                                                                                                                                                                            FUEL TANK
                                                                                                                                                         ORDER




                                                                                                                                                                                                                                                                                                                                                                                                     ENTRY




                                                                                                                                                                                                                                                                                                                                                                                                                  T
                                                                                                                                                                                                                                                                                                                                                                               9,000
                                                                                                                                                                                                                                                                                                                                                                                                     EXIT
                                                                                                                                                                                       SERVICE
                                                                                                                                                                                       STATION
                                                                                                                                                                                          2
                                                                                                                                                                                                                                              33
                                                                                                                                                                                        195 m
                                                                                                                                                                                                         SALES AREA
                                                                                                                                                         PURUSE




                                                                                                                                                                                                         120 m2
                                                                                                                                                                                                                              1         4
                                                                                                                                                                       SERVICE                                               MOTORCYLCLE




                                                                                                                                                                                                                                                                                                                                                                                              5"
                                                                                                                                                                        80 m2                                                   PARKING
                                                                                                                                                                                                     SERVICE BAY




                                                                                                                                                                                                                                                                                                                                                                                          0' 2
                                                                                                                                                                                                                                                                                                                                                                                        °2
                                                                                                                                                                                                                                                                                                                                                                                     242
                                                                                                                                                                                                                                                                   UNDERGROUND




                                                                                                                                                                                                                                                                                                                                                                                 m
                                                                                                                                                                                                                                                                                                                                                                              048
                                                                                                                                                                                                                                                                   DETENTION TANK




                                                                                                                                                                                                                                                                                                                                                                           14.
                                                                                                                                                                                                     ONE WAY                                                                                                            CAPING
                                                                               WATER                                                                                                                                                                                                                           LANDS




                                                                                                                                                                                                                                                                                                      5,000
                                                                               TANK                                                                                                                                                                                                                            434 m2

                                                                                                                                                                                                                                                   BIO RETENTION
                                                                                                                                                                                                                                                        BASIN                                        44.312m
                                                                                                                                                                                                                                                                                            ' 10"
                                                                                       WATER                                                                                                                                                                                         291° 20
                                                                                       TANK           PUMP


                                                                                                                                                 300° 48' 40"              46.768m
                                                                                                                                                                                                                                                                                          (LOT 1)
                                                                                                     BOOSTER
                                                                                                                                                                                                                                                                                     MENT
                                                                                                                                                                                                                                                                               S EASE
                                                                                                                                                                                                                                                                          ACCES
                                                                                                                                                                                                                     1
                                                                                                                                                                                                                   DA-06



                 1   SITE PLAN
                     SCALE - 1:250                                               -




                                                                                                     PRELIMINARY                                                                                                                                                                                                                                                                                                       HIGHWAY SERVICE
                                                                                                                                                                                                                                                         ISSUE          DATE                BY      DESCRIPTION                                     CHKD

                                                                                                                                                                                                                                                         P1             23.05.2016          RP      PRELIMINARY                                     PW



reddogarchitects.com
                                                                                                                                                                                                                                                         P2

                                                                                                                                                                                                                                                         P3
                                                                                                                                                                                                                                                                        25.05.2016

                                                                                                                                                                                                                                                                        31.05.2016
                                                                                                                                                                                                                                                                                            RP

                                                                                                                                                                                                                                                                                            RP
                                                                                                                                                                                                                                                                                                    PRELIMINARY

                                                                                                                                                                                                                                                                                                    PRELIMINARY
                                                                                                                                                                                                                                                                                                                                                    PW

                                                                                                                                                                                                                                                                                                                                                    PW
                                                                                                                                                                                                                                                                                                                                                                                                                       STATION, COOROY
P 07 3252 8912 F 07 3252 8914                                                                                                                                                                                                                            P4             31.05.2016          RP      PRELIMINARY                                     PW                                                                 PROJECT NO.           DRAWING NO.   ISSUE
[email protected]
                                                                                                                                                                                                                                                                                                                                                                                                                       2480-276              DA-02         P4

Page 20

APPENDIX B

STORMWATER QUALITY MANAGEMENT PLANS
BY COVEY ASSOCIATES

Page 21

 

 

FSL 123.60

Se

al

PUMP

   

 

 

 

 
    
   

20KL UNDER GROUND RAINWATER REUSE
TANK (ROCLA ECORAIN20 OR EQUIVALENT)

 

O

LANDSCAPING

 

121)

ie

 

  

BOOSTER

 

 

 

 

 

INDICATIVE BIO—RETENTION

qj Ke
ie <hs
LY -

i

—

 

 
  
      
     

rs. vass7| a

|
OQ.
g
.

CANOPY ROOFWATER DIRECTED
TO BIO-RETENTION BASIN

RUNOFF FROM BOWSER AREA
DIRECTED TO HOLDING TANK

FSL 123.25

FSL 123.18
annscrP NS

 
 
  

 

OO

a

INDICATIVE UNDERGROUND
DETENTION TANK.

      

FSL 124.05

EXIT

FSL_123.75

TRAFFICABLE GRATED DRAIN

   
  

FSL 122.47 @

 

  

 

IT_IS THE RESPONSIBILITY OF THE CONTRACTOR
TO CONTACT THE RELEVANT AUTHORITIES TO
CONFIRM THE LOCATION OF ALL EXISTING SERVICES
PRIOR TO THE COMMENCEMENT OF EXCAVATION

 

 

 

 

     

 

PROPOSED FINISHED
SURFACE LEVEL

PROPOSED STORMWATER INLET STRUCTURE
WITH STORMSACK OR ENVIROPOD

PROPOSED STORMWATER

 

 

 

FSL 123.30

ENTRY
EXIT

FSL 122.00

 

PROPOSED STORMWATER PIPE TO CONNECT
TO EXISTING STORMWATER MAINTENANCE,
HOLE. EXISTING INVERT LEVEL 118.413

Check all dimensions before commencement of work.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BASIN LOCATION Check Site boundary dimensions from the Tile plans
Check Building Boundary clearances by set out.
1:400 (A3) Notwithstanding the information supplied on this drawing,
1:200 (Al) the location, depth and extent of underground or overhecd
“ services are to be confirmed and protected on site by the}
contractor prior to commencement of works.
‘Approved + a
Checked - SR s Consulting Civil & UA Lp Drawing title ~ Project - PROPOSED SERVICE Site - Project 161968 Sheet No. SWMPO1
Design - JM Drawn -_ AS A Structural Engineers | KEVIN COVEY Béng,cPEng.MicAust MSPEPNG,RPEC-1823| STORMWATER CENTRE TAYLOR COURT, Digital Ret ; SIMEOL SOMITE osu: B
Y . CHRIS. CAMP Eng(Hons) MEAust,RPEQ—4944 uvent
Scales - 1:400(A3) Date - JUN 16 | toshtwenwenTS aS coves Project Management] 124 pUPORTH AVENUE Ph (07) 5443 7777 MANAGEMENT LAYOUT PLAN | Client - HASS HOLDINGS ATF, COOROY, QUEENSLAND This Document is copyright and shall not be copied
7108-06-16] APPROVAL ESUE as] ASSOCIATES PTY LTD 3 pignniny PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage - APPROVAL ‘ABN 59 137 305 992 9 MAROOCHYDORE QLD 4558 THE QUASAR TRUST for the Development and the Site Specie.)

 

 

 

issue Date Description

 

E-MAIL: [email protected]

 

 

 

 

By
T:\QIOBS\T6\ FSTUBB\DUG Covey\\Stormwater Management Plans\Uncontroled\SWMPOT STORMWATER WANEGEMENT LAYOUT PLAN-dwa

Page 22

 

 
     
   
 
  
      
    
 
 
 
 
    
  
  
  
 
 
  
 
 
   
 
 

INDICATIVE BALUSTRADE
FENCE/HANDRAIL

CLEAN OUT POINTS
AT END OF THE LINE

STANDARD FIELD
INLET PIT 900x600

/ INLET PIPE

  
 

INDICATIVE,
RETAINING WALL

  
 

SLOTTED [email protected]% — TYP.

 
 

RAISED CONCRETE BARRIER
AROUND FOREBAY — REFER DETAIL B

CONCRETE FOREBAY

INDICATIVE GATE FOR
SKIDSTEER MAINTENANCE ACCESS

9600 CAST IRON LID

005 1
1:150

(a3) \
1:75
(a1)

 

 

IT_IS THE RESPONSIBILITY OF THE CONTRACTOR
TO CONTACT THE RELEVANT AUTHORITIES TO
CONFIRM THE LOCATION OF ALL EXISTING SERVICES
PRIOR TO THE COMMENCEMENT OF EXCAVATION

 

 

LEGEND

 

 

PROPOSED FINISHED
SURFACE LEVEL

PROPOSED STORMWATER INLET STRUCTURE
WITH STORMSACK OR ENVIROPOD

PROPOSED STORMWATER

PROPOSED TOP OF BATTER

 

 

 

STANDARD FIELD
INLET PIT 1200x1200

INDICATIVE GATE FOR
BASIN STAIRWELL ACCESS

SKIDSTEER MAINTENANCE ACCESS

OVERFLOW WEIR

    

Check all dimensions before commencement of work.
Check Site boundary dimensions from the Title plans
Check Building Boundary clearances by set out.
Notwithstanding the information supplied on this drawing,
the location, depth and extent of underground or overhead!
services are to be confirmed and protected on site by the
contractor prior to commencement of works.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Checked - SR Consutingcwia [PP Drawing title — Project - PROPOSED SERVICE Site -

Design - JM Drawn - AS a Structural Engineers kevin covey (Sn PereAeN USPENGPED-102 CONCEPT BIO-BASIN AND CENTRE TAYLOR COURT,

Scales - 1:150 (A3) Date - JUN 16 | toehwenwenTS aS COVEY Project Management] 124 DupoRTH AVENUE Ph (07) 8443. 7777 DETENTION TANK LAYOUT Client - HASS HOLDINGS ATF, COOROY, QUEENSLAND
0 ~ 7 [06-05-16 APPROVAL ISSUE fs] ASSOCIATES PTY LTO. planning PO BOK 18 ip asap FOE (07) BAAS 7577 PLAN
ocument Stoge - APPROVAL | 3. Dessriptn ‘ABN 59 137 305 992 YAROOCHYDORE, OUP 4558 ou THE QUASAR TRUST

Project 161968 Sheet No. SWMPO2

 

Digital Ref BOLBASN AND. DETENTON | B
gta! Net TaN DETALS PLAN ssue

 

 

This Document is copyright and shall not be copied
without written approval, nor shall it be used except
for the Development and the Site Specie.)

 

 

By
O:\QJOBS\16\161968\DWG Covey\Stormwater Management Plans\Uncontrolled\SWMPO3 CONCEPT BIO-BASIN AND DETENTION TANK DETAILS PLAN.dwq

Page 23

NOMINAL TOP OF

!

va

INDICATIVE RETAINING WALL

INDICATIVE BALUSTRADE FENCE/HANDRAIL ————>y

RETAINING WALL RL122.80

 

INDICATIVE.
EXISTING SURFACE

BARRIER KERB [

__KERB_RL_123.20

 

INDICATIVE RETAINING WALL NG

2.6m_BASIN FILTER BASE

 

 
     

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/\ PROPOSED ROAD SURFACE RL_123.05

INDICATIVE.

BASIN PLANTING

  

 

 

IT_IS THE RESPONSIBILITY OF THE CONTRACTOR
TO CONTACT THE RELEVANT AUTHORITIES TO
CONFIRM THE LOCATION OF ALL EXISTING SERVICES
PRIOR TO THE COMMENCEMENT OF EXCAVATION

 

 

 

COMPACTED FILL

 
 
   
 

GEOTEXTILE TO BE KEYED
INTO BATTER 300mm MIN.

 

NOTES

1. BIO-RETENTION BASIN DETAILS
a) BASIN FILTER AREA AT BASE:

90 sq.m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STANDARD TYPE 1 INDICATIVE BASIN
LOT 3 FIELD INLET GRATE
x $P197517 PLANTING __
8
# BASIN CONCRETE _FOREBAY
B
| z
—— = FILTER MEDIA 150 25mm CHAMFER
| 3 (PARTICLE SIZE 0.5mm) INDICATIVE BASIN. PLANTING mm
\ TOP_OF FILTER MEDIA RL_122.00 2
EMT H J — 10P_OF FILTER MEDIA RL_122,00_
srers7 | ‘\ STANDARD FIELD eines | |
\ 3 aw B
| \ INLET PIT 900x600 LE anna _— 4 Bl 0.5% FALL
| f \ 8 TRANSITION LAYER (0.7-1.0mm SAND) -t-
oe — +- _——
: COMPACTED FILL °
gS DRAINAGE LAYER (1.0-5.0mm)
{ EE __ BOTTOM OF DRAINAGE LAYER RL 121.00 (VARIES) _ RR
[ GEOTEXTILE DETAIL A DETAIL B
EXISTING RETAINING — FILTER MEDIA — REFER DETAIL A (A24 BIDIM) SCALE 1:10 (At), 1:20 (A3) SCALE 1:10 (A1),1:20 (A3)
WALL TO. BE REMOVED ; nn
SUBSOIL DRAINAGE 0 01 02 03 0.5m O01 0,2 03 0.5m
1:20
6375 OUTLET PIPE IL 120.64 SECTION A-A 00.2 04 06 im 1:20 (A3)
SCALE: 1:20 (Al), 1:40 (A3) a0 (A3) 1:10
Y 1:10 (A1)
(A3) (A1)
4:20
(A1)
INDICATIVE PLANTING
+= INDICATIVE BALUSTRADE GATE
STANDARD TYPE 2 FIELD INLET GRATE
INDICATIVE PLANTING \ [
9600 CAST IRON LID \ WWW
| [ STANDARD TYPE 2 FIELD INLET GRATE . r .
W WE WE WW NWJINV NIN NNN NN 1 5 [
SKIDSTEER r
MAINTENANCE ‘ INDICATIVE DETENTION
AOCESS TANK ROOF SLAB A 4
Lb]
oveRFLOw | §
WEIR 3
| WEIR RL 122.00
INDICATIVE DETENTION TANK ROOF SLAB a
WEIR RL 122.00
= STANDARD FIELD
INLET PIT 1200x1200 STANDARD FIELD
INLET PIT 1200x1200
& UNDER GROUND INDICATIVE DETENTION TANK WALLS ——
DETENTION TANK
ORIFICE PLATE
Pi as enn C) ORE PAE
PROPOSED 375. PIPE oe
eres
TANK FLOOR RL 12050 | PROPOSED #450 PIPE
‘ IL 120.40
a 5 SECTION C-C
SCALE:1:20 (A1), 1:40 (A3)
| 20.4 0, m
SECTION B-B 0 02 04 06 1
SCALE:1:20 (A1), 1:40 (A3)
1:40
00.2 04 06 im (A3) Check all dimensions before commencement of work.
1:20 Check Site ‘boundary dimensions from the Title plans
1:40 (A1) Check Building Boundary clearances by set out.
(A3) Notwithstanding the information supplied on this drawing,
1:20 the location, depth ond extent of underground or overhead
(a1) services are to be confirmed and protected on site by the
contractor prior to commencement of works.
Approved - .
Checked - SR 2 Consulting Civil & Drawing title — Project - PROPOSED SERVICE Site - Project 161968 Sheet No. SWMPO3
Design - JM Drawn - AS A Structural Engineers KEVIN COVEY Bachna iEhst MSPEPAGPED- 125 CONCEPT BIO-BASIN AND CENTRE TAYLOR COURT, Digital Ref : go-go sue: B
, ng( Hons) MEAust,RPEQ-
Seas AS SHOWN pote — aww 16 [oT s| COVEY reiecrorcgeren te nam nie i) s47m7 | DETENTION TANK DETAILS | oe - HASS HOLDINGS ATF, COOROY, QUEENSLAND Tis Document oprah ond sal ak Te capa
7 [os=nee| PROWL BSE fs] ASSOCIATES PTY LTD 3 plannin ax without written approval, nor shall it be used except
- 9 MAROOCHYDORE QLD 4558 t ‘fi
Docunent Stage - APPROVAL [a = by | _AN 52 7 5 52 YAROOCHYDORE OLD 4558 PLAN THE QUASAR TRUST for the Development and the Site Spesfed /)
mwater Managernent Plans\Uncontrolled\SWMPO3 CONCEPT BIO—BASIN AND DETENTION TANK DETAILS PLAN.dwg

O:\OJOBS\16\161968\DWG Covey’

 

Page 24

APPENDIX C
MUSIC CONCEPT MAP

Page 25

Hardstand [M

Untreated Landscaping

Roof [Mix
£0) treated road

Stormsacks (8)

SPEL Stormsacks (1

Rainwater Tank

Receiving Node

 

Page 26

APPENDIX D

SPEL STORMSACK DETAILS

Page 27

SPEL Stormsack
       At-source Gross Pollutant Trap




             www.spel.com.au


[OCR of page images]
 

 

EL Stormsack

At-source Gross Pollutant Trap

www.spel.com.au

INTEGRATED WATER SOLUTIONS

 

Page 28

Stormwater
Treatment
An all too common issue with today’s highly impervious
landscape is how to meet stormwater regulations with
limited budgets and tight space constraints.
SPEL StormSack filtration solutions are highly engineered
water quality devices that are deployed directly in the
stormwater system to capture contaminants close the
surface for ease of maintenance. Easily retrofitted into new
or existing structures, SPEL StormSack filtration technology
is a decentralized approach to stormwater treatment that
essentially repurposes traditional site infrastructure and
customizes it to meet specific site water quality goals. In
this way, it satisfies important objectives of today’s LID
(Low Impact Development) criteria.
From an operations perspective, catch basins with SPEL
Stormsack filters are also easier and quicker to clean out
because pollutants are trapped just under the grate.


StormSack
The SPEL StormSack is specifically designed for the
capture of gross pollutants: sediment, litter, and oil and
grease. Ideally suited for municipal storm drain retrofits,
the SPEL StormSack’s unique design allows maintenance
to be performed using conventional vacuum suction
equipment.




    Application                                               Regulatory Issue                                   Target Pollutants
    Council Storm Drain Retrofits                             At-source litter capture                           Sediment, Litter, O&G
    Commercial/Retail/Residential                             Stormwater Compliance                              Sediment, Litter, O&G
    Litter Prone Urban Areas                                  Cost effective litter control                      Litter ≥ 5 mm
    Scrap Metal/Solid Waste/Oil Storage/Etc                   Industrial Multi-Sector General Permit             Gross Pollutants, O&G
    Part of Treatment Train                                   Council Stormwater Quality Improvement Targets     Sediment, Litter, O&G
    Construction Sediment/Erosion                             Sediment Control Plan                              Sediment/Erosion Control


                                                                            [ 1]                        [6]    [ 5]
    Features                                                                                                                                 Standard SPEL
                                                                                                                                             Stormsack to suit
    1.   Durable, aluminum frame construction      [2]                                                                                       Pit Sizes
         Integral oil boom effectively captures                                                                                              450x450mm
    2.                                                  [3]
         oil and grease from spills
                                                                                                                                             600x600mm
         Patented dovetailed flange – allows
    3.
         12cm of length/width field adjustment
                                                  [4]                                                                                        900x600mm

                                                                                                                                             900x900mm
         Polypropylene netting protects sack
    4.
         from suction hose during maintenance

         Steel clip with locking tab holds                                                                                                  Custom sizes (i.e.
    5.                                                                                                                                      1200x900mm) can
         replaceable filter sack in place

    6.   Baffled bypass traps floatables
                                                                                                                                            be manufactured on
                                                                                                                                            short lead times




2

Page 29

Specifications & Details
General Description
This technology is a post developed stormwater treatment
system. The SPEL StormSack provides effective filtration
of solid pollutants and debris typical of urban runoff, while
utilising the existing or new storm drain infrastructure.
The StormSack is designed to rest on the flanges of
conventional catch basin frames and is engineered for
most hydraulic and cold climate conditions.


Installation And Maintenance
Installation procedures shall include removing the storm
grate, cleaning the ledge of debris and solids, measuring
catch basin clear opening and adjusting flanges to rest on
grate support ledge. Install SPEL StormSack with splash
guard under curb opening so the adjustable flanges are
resting on the grate support ledge. Install corner filler
pieces. Reinstall storm grate directly on support flanges
[rise shall be no more than 1/8 inch (3 mm)].
Maintenance: Typically the SPEL StormSack is serviceable
from the street level, and therefore maintenance does not
require confined space entry into the catch basin structure.
The unit is designed to be maintained in place with a
vacuum hose attached to a sweeper or a vactor truck. The
oil boom is also designed to easily be replaced from the
street level. Use only SPEL replaceable parts.


Products
Material and Design
  A. Adjustable Flange and Deflector: Aluminum Alloy
      6063-T6
  B. Splash Guard: neoprene rubber
                                                                Benefits
  C. Stormsack: woven polypropylene geotextile with US
      Mesh 20                                                   t-PXDPTUHSPTTQPMMVUBOUDBQUVSF
  D. Corner Filler: Aluminum Allow 5052-H32                     t2VJDLFBTZJOTUBMMBUJPO
  E. Lifting Tabs: Aluminum Allow 5052-H32
                                                                t4JNQMFNBJOUFOBODF
  F. Replaceable Oil Boom: polypropylene 3 inch
     (76 mm) diameter                                           t"UTPVSDFDBQUVSF
  G. Mesh Liner: HDPE, diamond configuration                    t"EKVTUTUPDVTUPNQJUTJ[FT
  H. Support Hardware: CRES 300 Series

Typical Performance Characteristics                             Field Performance
   A. Debris capacity: 8.5cu. ft. (0.24 m3)                     The SPEL Stormsack was introduced to the Australian
   B. Filtered flow rate: 7.3 cfs (207 lps)                     market in 2012 and field testing is underway at several
   C. Primary baffled bypass flow rate: 4.2cfs (119 lps)        locations in South-east Queensland. Laboratory testing
   D. Secondary bypass flow rate: 0.4 cfs (10 lps)              has shown capture of 99.99% of gross pollutants up to the
                                                                bypass flow rate.* Further results will be provided as they
   E. Total bypass flow rate: 4.6 cfs (130 lps)
                                                                become available.
   F. Oil boom sorption capacity: 376 oz (11 L)

Recommended minimum clearance from bottom of SPEL
StormSack to inside bottom of vault is 2 inches (50 mm)
Typical frame adjustability range of 5 inches (127 mm) in
each direction.




                                                                                                                          3


[OCR of page images]
Specifications & Details
General Description

This technology is a post developed stormwater treatment
system. The SPEL StormSack provides effective filtration
of solid pollutants and debris typical of urban runoff, while
utilising the existing or new storm drain infrastructure.
The StormSack is designed to rest on the flanges of
conventional catch basin frames and is engineered for
most hydraulic and cold climate conditions.

Installation And Maintenance

Installation procedures shall include removing the storm
grate, cleaning the ledge of debris and solids, measuring
catch basin clear opening and adjusting flanges to rest on
grate support ledge. Install SPEL StormSack with splash
guard under curb opening so the adjustable flanges are
resting on the grate support ledge. Install corner filler
pieces. Reinstall storm grate directly on support flanges
{rise shall be no more than 1/8 inch (3 mm)].

Maintenance: Typically the SPEL StormSack is serviceable
from the street level, and therefore maintenance does not
require confined space entry into the catch basin structure.
The unit is designed to be maintained in place with a
vacuum hose attached to a sweeper or a vactor truck. The
oil boom is also designed to easily be replaced from the
street level. Use only SPEL replaceable parts.

Products

Material and Design
A. Adjustable Flange and Deflector: Aluminum Alloy
6063-T6

B. Splash Guard: neoprene rubber

C. Stormsack: woven polypropylene geotextile with US
Mesh 20

D. Corner Filler: Aluminum Allow 5052-H32
E. Lifting Tabs: Aluminum Allow 5052-H32

F. Replaceable Oil Boom: polypropylene 3 inch
(76 mm) diameter

G. Mesh Liner: HDPE, diamond configuration
H. Support Hardware: CRES 300 Series

Typical Performance Characteristics
A. Debris capacity: 8.5cu. ft. (0.24 m3)
B. Filtered flow rate: 7.3 cfs (207 Ips)
C. Primary baffled bypass flow rate: 4.2cfs (119 lps)
D. Secondary bypass flow rate: 0.4 cfs (10 lps)
E. Total bypass flow rate: 4.6 cfs (130 lps)
F. Oil boom sorption capacity: 376 oz (11 L)

Recommended minimum clearance from bottom of SPEL
StormSack to inside bottom of vault is 2 inches (60 mm)
Typical frame adjustability range of 5 inches (127 mm) in
each direction.

    
 

Benefits

e Low cost gross pollutant capture
© Quick & easy installation

¢ Simple maintenance

e At source capture

e Adjusts to custom pit sizes

Field Performance

The SPEL Stormsack was introduced to the Australian
market in 2012 and field testing is underway at several
locations in South-east Queensland. Laboratory testing
has shown capture of 99.99% of gross pollutants up to the
bypass flow rate.* Further results will be provided as they
become available.

 

Page 30

HEAD OFFICE
PO Box 6144
Silverwater NSW 1811

100 Silverwater Rd
Silverwater NSW 2128

Phone: +61 2 8705 0255
Fax: +61 2 8014 8699

DESIGN OFFICES
New South Wales 61 2 8705 0255
Canberra            61 2 6128 1000
Queensland          61 7 3271 6960
Victoria & Tasmania 61 3 5274 1336
South Australia     61 8 8275 8000
West Australia      61 8 9350 1000
Northern Territory  61 2 8705 0255
New Zealand         64 9 276 9045

www.spel.com.au
SPEL Environmental accepts no responsibility for any loss or damage resulting
from any person acting on this information. The details and dimensions contained
in this document may change, please check with SPEL Environmental for
confirmation of current specifications.
                                                                                   0033 SPEL StormSack 2.0

Page 31

APPENDIX E

WATER AND SEWAGE LAND USE CATEGORY
DEMAND TABLE
(GOLD COAST COUNCIL)

Page 32

Water and sewage demand table
Water and sewage demand conversion rates are to be used to calculate water supply demand and sewage
discharge loads for different land use categories.

This data is used in network capacity assessments and detailed infrastructure planning investigations.



 Land Use Category                           Water and Sewage
                                            Conversion Rate                     Assessment Unit
 Adult Entertainment                        7.7 EP/ 100 sqm GFA                 100 sqm Gross Floor Area
 Aged Persons Accommodation - Self-         1.28 EP/ 1 Bedroom Dwelling         1 Bedroom Dwelling
 contained Dwelling                         1.72 EP/ 2 Bedroom Dwelling         2 Bedroom Dwelling
                                            2.46 EP/ 3 Bedroom Dwelling         3 Bedroom Dwelling
                                            2.46 EP/ 4 Bedroom Dwelling         4 Bedroom Dwelling
                                            2.46 EP/ 5 + Bedroom Dwelling       5+ Bedroom Dwelling
 Aged Persons Accommodation - Hostel        0.93 EP/ Bed                        Bed
 Units
 Aged Persons Accommodation - Nursing       0.16 EP/ Bed                        Bed
 Home Beds
 Agriculture                                Water Supply Demand and Sewage Discharge Impact Report

 Amusement Parlour                          5.46 EP/ 100 sqm GFA                100 sqm Gross Floor Area
 Animal Husbandry                           Water Supply Demand and Sewage Discharge Impact Report

 Apartments                                 1.28 EP/ 1 Bedroom Dwelling         1 Bedroom Dwelling
                                            1.72 EP/ 2 Bedroom Dwelling         2 Bedroom Dwelling
                                            2.46 EP/ 3 Bedroom Dwelling         3 Bedroom Dwelling
                                            2.46 EP/ 4 Bedroom Dwelling         4 Bedroom Dwelling
                                            2.46 EP/ 5 + Bedroom Dwelling       5+ Bedroom Dwelling
 Aquaculture                                Water Supply Demand and Sewage Discharge Impact Report

 Attached Dwelling                          1.28 EP/ 1 Bedroom Dwelling         1 Bedroom Dwelling
                                            1.72 EP/ 2 Bedroom Dwelling         2 Bedroom Dwelling
                                            2.46 EP/ 3 Bedroom Dwelling         3 Bedroom Dwelling
                                            2.46 EP/ 4 Bedroom Dwelling         4 Bedroom Dwelling
                                            2.46 EP/ 5 + Bedroom Dwelling       5+ Bedroom Dwelling
 Bed and Breakfast                          1.09 EP/ Bedroom                    Bedroom
 Brothel                                    Water Supply Demand and Sewage Discharge Impact Report

 Bulk Garden Supplies                       1.64 EP/ 100 sqm GFA                100 sqm Gross Floor Area
 Café                                       4.2 EP/ 100 sqm GFA                 100 sqm Gross Floor Area
 Camping Ground                             1.09 EP/Site                        Site
 Car Park                                   Water Supply Demand and Sewage Discharge Impact Report

 Car Wash                                   2.73 EP/ Lane                       Lane



                                                                                                  Page 1 of 7

Page 33

Caravan Park                             1.09 EP/ Site                   Site
Caretakers Residence - Attached          1.28 EP/ 1 Bedroom Dwelling     1 Bedroom Dwelling
                                         1.72 EP/ 2 Bedroom Dwelling     2 Bedroom Dwelling
                                         2.46 EP/ 3 Bedroom Dwelling     3 Bedroom Dwelling
                                         2.46 EP/ 4 Bedroom Dwelling     4 Bedroom Dwelling
                                         2.46 EP/ 5 + Bedroom Dwelling   5+ Bedroom Dwelling
Caretakers Residence - Detached          2.73 EP/ Dwelling               Dwelling
Cemetery                                 Water Supply Demand and Sewage Discharge Impact Report

Child Care Centre                        0.14 EP/ Pupil + Staff Member   Pupil/ Staff Member
Cinema                                   5.46 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Commercial Groundwater Extraction        Water Supply Demand and Sewage Discharge Impact Report

Commercial Services                      1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Community Care Centre                    Water Supply Demand and Sewage Discharge Impact Report

Community Purposes                       Water Supply Demand and Sewage Discharge Impact Report

Conference / Meeting Centre              4.37 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Conservation (Natural Area               Water Supply Demand and Sewage Discharge Impact Report
Management)
Convenience Shop                         1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Department Store                         1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Detached Dwelling                        2.73 EP/ Dwelling               Dwelling
Display Home                             2.73 EP/ Dwelling               Dwelling
Ecotourism Facility                      Water Supply Demand and Sewage Discharge Impact Report

Eco-Village                              Water Supply Demand and Sewage Discharge Impact Report

Educational Establishment-Primary        0.08 EP/ Pupil + Staff Member   Pupil/ Staff Member
Educational Establishment-Secondary      0.08 EP/ Pupil + Staff Member   Pupil/ Staff Member
Educational Establishment -              0.27 EP/ Pupil + Staff Member   Pupil/ Staff Member
Tertiary/Further with accommodation
Educational Establishment -              0.03 EP/ Pupil + Staff Member   Pupil/ Staff Member
Tertiary/Further without accommodation
Estate Sales Office                      1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Extractive Industry                      Water Supply Demand and Sewage Discharge Impact Report

Family Accommodation                     0.76 EP/ Additional Dwelling    Additional Dwelling
Family Day Care Home                     0.14 EP/ Pupil + Staff Member   Pupil/ Staff Member
Farm Forestry                            Water Supply Demand and Sewage Discharge Impact Report

Farmstay                                 1.64 EP/ Bedroom                Bedroom
Fast Food Premises                       3.96 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Freight Depot                            Water Supply Demand and Sewage Discharge Impact Report

Fuel Depot                               Water Supply Demand and Sewage Discharge Impact Report




                                                                                           Page 2 of 7

Page 34

Funeral Business                            Water Supply Demand and Sewage Discharge Impact Report

Funeral Parlour                             Water Supply Demand and Sewage Discharge Impact Report

Gaming Premises                             7.7 EP /100 sqm GFA             100 sqm Gross Floor Area
Helipad                                     Water Supply Demand and Sewage Discharge Impact Report

High Impact Telecommunications              Water Supply Demand and Sewage Discharge Impact Report
Facility
Home Occupation-additional to Dwelling      1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Home Office-additional to Dwelling          1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Hospital                                    1.37 EP/ Bed                    Bed
Hostel Accommodation                        0.82 EP/ Bed                    Bed
Hotel/ Clubs                                7.7 EP /100 sqm GFA             100 sqm Gross Floor Area
Indoor Sport and Recreation -               5.46 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Amusement Arcade
Indoor Sport and Recreation - Gaming        5.46 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Machine Areas
Indoor Sport and Recreation -               5.46 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Gymnasium
Indoor Sport and Recreation - Library Art   1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Gallery
Indoor Sport and Recreation - Meeting       4.37 EP/ 100 sqm GFA            100 sqm Gross Floor Area
place/Public hall
Indoor Sport and Recreation - Pinball       5.46 EP/ 100 sqm GFA            100 sqm Gross Floor Area
parlour
Indoor Sport and Recreation - Poker         5.46 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Machine Areas
Indoor Sport and Recreation - Squash or     5.46 EP/ 100 sqm GFA            100 sqm Gross Floor Area
other court
Indoor Sport and Recreation -               5.46 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Theatre/Cinema
Industry (Heavy/Manufacturing)              0.98 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Integrated Housing-Attached                 1.28 EP/ 1 Bedroom Dwelling     1 Bedroom Dwelling
                                            1.72 EP/ 2 Bedroom Dwelling     2 Bedroom Dwelling
                                            2.46 EP/ 3 Bedroom Dwelling     3 Bedroom Dwelling
                                            2.46 EP/ 4 Bedroom Dwelling     4 Bedroom Dwelling
                                            2.46 EP/ 5 + Bedroom Dwelling   5+ Bedroom Dwelling
Integrated Housing-Detached                 2.73 EP/ Dwelling               Dwelling
Kennel                                      Water Supply Demand and Sewage Discharge Impact Report

Kiosk                                       1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Laundromat                                  1.09 EP/ Washing Machine        Washing Machine
Low Impact Telecommunications Facility      Water Supply Demand and Sewage Discharge Impact Report

Manufacturer's Shop - Retail Area           1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Manufacturer's Shop - Manufacturing         0.98 EP/ 100 sqm GFA            100 sqm Gross Floor Area


                                                                                              Page 3 of 7

Page 35

Area
Marina - Ancillary Activities             Water Supply Demand and Sewage Discharge Impact Report

Marina - Dry Berth or Swing Mooring       0.55 EP/ Berth                  Berth
Marina - Shop                             1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Marina - Transient Moorage                1.09 EP/ Berth                  Berth
Marina - Wet Berths for boats less than   2.18 EP/ Berth                  Berth
10m
Marina - Wet Berths for boats 10-15m      2.18 EP/ Berth                  Berth
Marina - Wet Berths for boats greater     2.18 EP/ Berth                  Berth
than 15m
Market                                    Water Supply Demand and Sewage Discharge Impact Report

Medical Centre                            1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Milk Depot                                Water Supply Demand and Sewage Discharge Impact Report

Mini Warehouse or Self Storage Facility   Water Supply Demand and Sewage Discharge Impact Report

Minor Aquaculture                         Water Supply Demand and Sewage Discharge Impact Report

Minor Tourist Facility                    Water Supply Demand and Sewage Discharge Impact Report

Motel-Manager's Unit                      1.28 EP/ 1 Bedroom Dwelling     1 Bedroom Dwelling
                                          1.72 EP/ 2 Bedroom Dwelling     2 Bedroom Dwelling
                                          2.46 EP/ 3 Bedroom Dwelling     3 Bedroom Dwelling
                                          2.46 EP/ 4 Bedroom Dwelling     4 Bedroom Dwelling
                                          2.46 EP/ 5 + Bedroom Dwelling   5+ Bedroom Dwelling
Motel - Motel Rooms                       1.28 EP/ Bedroom                Bedroom
Motel - Restaurant                        5.11 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Motor Vehicle Repairs                     0.98 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Night Club                                7.7 EP/ 100 sqm GFA             100 sqm Gross Floor Area
Office                                    1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Outdoor Sport and Recreation -            Water Supply Demand and Sewage Discharge Impact Report
Clubhouse
Outdoor Sport and Recreation - Tennis     Water Supply Demand and Sewage Discharge Impact Report
or other Court
Outdoor Sport and Recreation - Golf       Water Supply Demand and Sewage Discharge Impact Report
Course
Outdoor Sport and Recreation - Golf       Water Supply Demand and Sewage Discharge Impact Report
Course Clubhouse
Outdoor Sport and Recreation - Lawn       Water Supply Demand and Sewage Discharge Impact Report
Bowls
Outdoor Sport and Recreation -            Water Supply Demand and Sewage Discharge Impact Report
Racecourse
Outdoor Sport and Recreation - Skating    Water Supply Demand and Sewage Discharge Impact Report
Rinks




                                                                                          Page 4 of 7

Page 36

Outdoor Sport and Recreation - Sporting    Water Supply Demand and Sewage Discharge Impact Report
Arena
Outdoor Sport and Recreation -             Water Supply Demand and Sewage Discharge Impact Report
Swimming Pools
Outdoor Storage Area                       Water Supply Demand and Sewage Discharge Impact Report

Place of Worship                           Water Supply Demand and Sewage Discharge Impact Report

Private Recreation                         Water Supply Demand and Sewage Discharge Impact Report

Public Utility                             Water Supply Demand and Sewage Discharge Impact Report

Reception Room                             4.37 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Relocatable Home Park                      1.28 EP/ 1 Bedroom Dwelling     1 Bedroom Dwelling
                                           1.72 EP/ 2 Bedroom Dwelling     2 Bedroom Dwelling
                                           2.46 EP/ 3 Bedroom Dwelling     3 Bedroom Dwelling
                                           2.46 EP/ 4 Bedroom Dwelling     4 Bedroom Dwelling
                                           2.46 EP/ 5 + Bedroom Dwelling   5+ Bedroom Dwelling
Residential Hotel - Ancillary Uses         Water Supply Demand and Sewage Discharge Impact Report

Residential Hotel-Bedroom                  1.28 EP/ Bedroom                Bedroom
Resort Hotel - Ancillary Uses              Water Supply Demand and Sewage Discharge Impact Report

Resort Hotel-Bedroom                       1.99 EP/ Bedroom                Bedroom
Restaurant                                 5.11 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Restricted Club                            7.7 EP/ 100 sqm GFA             100 sqm Gross Floor Area
Retail - Commercial Development            1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Retail Plant Nursery                       Water Supply Demand and Sewage Discharge Impact Report

Rural Industry                             Water Supply Demand and Sewage Discharge Impact Report

Salvage Yard                               Water Supply Demand and Sewage Discharge Impact Report

Service Industry                           0.98 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Service Station - Fuel Pumps               0.98 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Service Station - Service Bays             0.98 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Service Station - Restaurant/ Cafe/ Fast   0.14 EP/ Seat                   Seat
Food
Service Station - Shop                     3.96 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Serviced Apartment                         1.64 EP/ Bedroom                Bedroom
Shop                                       1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Shopping Centre Development < 20,000       Water Supply Demand and Sewage Discharge Impact Report
sqm GFA
Shopping Centre Development >=             Water Supply Demand and Sewage Discharge Impact Report
20,000 sqm GFA
Showroom                                   1.64 EP/ 100 sqm GFA            100 sqm Gross Floor Area
Special Accommodation                      0.82 EP/ Bed                    Bed




                                                                                           Page 5 of 7

Page 37

Stall                                     Water Supply Demand and Sewage Discharge Impact Report

Storage                                   Water Supply Demand and Sewage Discharge Impact Report

Substantial Structure                     Water Supply Demand and Sewage Discharge Impact Report

Surf Life Saving Club                     3.14 EP/ 100 sqm GFA                100 sqm Gross Floor Area
Surgery - additional to Dwelling          1.64 EP/ 100 sqm GFA                100 sqm Gross Floor Area
Take Away Food Premises                   3.96 EP/ 100 sqm GFA                100 sqm Gross Floor Area
Tavern - Liquor Retail Sales Areas        1.64 EP/ 100 sqm GFA                100 sqm Gross Floor Area
Tavern - Lounge, Bar, Beer Garden, etc.   7.7 EP/ 100 sqm GFA                 100 sqm Gross Floor Area
Telecommunications Facility               Water Supply Demand and Sewage Discharge Impact Report

Tourist Cabins                            1.64 EP/ Bedroom                    Bedroom
Tourist Facilities                        Water Supply Demand and Sewage Discharge Impact Report

Tourist Shop                              1.64 EP/ 100 sqm GFA                100 sqm Gross Floor Area
Toxic or Dangerous Goods Store            0.98 EP/ 100 sqm GFA                100 sqm Gross Floor Area
Transit Centre                            Water Supply Demand and Sewage Discharge Impact Report

Transport Terminal                        Water Supply Demand and Sewage Discharge Impact Report

Vehicle Hire Office                       1.64 EP/ 100 sqm GFA                100 sqm Gross Floor Area
Vehicle Hire Premises                     0.82 EP/ 100 sqm GFA                100 sqm Gross Floor Area
Vehicle Sales Premises - Office Areas     1.64 EP/ 100 sqm GFA                100 sqm Gross Floor Area
Vehicle Sales Premises - Display Areas    0.35 EP/ 100 sqm GFA                100 sqm Gross Floor Area
Veterinary Clinic                         0.82 EP/ Consultation Room          Consultation Room
Veterinary Hospital                       Water Supply Demand and Sewage Discharge Impact Report

Warehouse                                 0.98 EP/ 100 sqm GFA                100 sqm Gross Floor Area
Waterfront (or Marine) Industry           Water Supply Demand and Sewage Discharge Impact Report

Definitions:

Equivalent Persons (EP)                   Basic unit used to equate an equivalent service demand to that
                                          of an average occupant of an average detached residential
                                          dwelling. For the Gold Coast, the Citywide average conversion
                                          from ET to EP is 2.73.
Equivalent Tenement (ET)                  Property based unit of measurement used to indicate
                                          infrastructure demand for the property. The demand from each
                                          property is related to the type of development allowed on the
                                          property with a detached dwelling on a standard residential lot
                                          being 1 ET. Other residential developments such as
                                          flats/units/villas are usually rated at lower ET per dwelling.
Gross Floor Area (GFA)                    The total floor area of all storeys of a building (measured from
                                          the outside of the external walls or the centre of a common
                                          wall), other than areas used for the following:

                                          •   building services, plant and equipment;
                                          •   access between levels;


                                                                                                 Page 6 of 7

Page 38

                                 •   ground floor public lobby;
                                 •   a mall;
                                 •   the parking, loading and manoeuvring of motor vehicles;
                                 •   un-enclosed private balconies whether roofed or not.

Square Metres (sqm)              Area in metres.

Water Supply Demand and Sewage   Should the proposed development involve a Land Use
Discharge Impact Report          Category that provides for a Water Supply Demand and
                                 Sewage Discharge Impact Report, a suitably qualified and
                                 experienced person or organisation must be engaged to
                                 prepare this report for you. The proposed total number of
                                 Equivalent Persons (EP) per Assessment Unit for that
                                 development, the methodology used to determine that rate and
                                 any benchmarking must be in the report.




                                                                                     Page 7 of 7

Page 39

APPENDIX F

STORMWATER QUANTITY CATCHMENT PLANS

Page 40

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

| Cooroy Service Centre
Appendix D
| Catchment Boundary
Plan
mY Ye
SMM 0 25 _*

 

 

 

 

 

 

 

 

O:\0JOBS\16\161968\GIS\MapIinfo\Maps\PDF\161968-0001A_CatchmentBoundaries.wor

 

Page 41

APPENDIX G

RAINFALL DATA, RATIONAL METHOD DATA
AND RESULTS

Page 42

Rational Method Data
Location:   Cooroy

Australian Rainfall & Runoff IFD Coefficents

   2I        2I        2I        50I     50I     50I     F2     F50      G
     1         12        72         1       12      72

 50.33      10.62     3.48      91.03   24.96    8.8     4.39   17.57   0.13


Rainfall Intensity (mm/hr)

   DURATION                             AVERAGE RECURRENCE INTERVAL (years)
 hours  minutes         1         2        5    10    20     50    100      200    500
 0.08       5         124       158      195   217   247    286    317      347    389
 0.10       6         116       148      184   204   232    269    298      327    366
 0.17      10          96       122      151   168   191    222    246      270    303
 0.25      15          80       102      127   141   161    187    207      228    255
 0.33      20          70        89      111   124   141    164    182      200    224
 0.42      25          63        80      100   111   127    147    163      180    202
  0.5      30          57        73       91   101   116    135    149      164    184
 0.75      45         45.9       59       73    82    94    109    121      133    150
   1       60         39.1       50       63    70    80     93    103      114    128
  1.5      90         30.3      39.0     49.7   56    65     76     85       94    106
   2      120         25.2      32.6     42.0 47.7    55     66     74       82     93
   3      180         19.4      25.2     33.1 38.0   44.4    53     60       67     77
  4.5     270         14.9      19.5     26.1 30.2   35.6   43.0  48.8       55     63
   6      360         12.3      16.3     22.0 25.7   30.4   37.0  42.2      47.6    55
   9      540         9.50      12.6     17.4 20.4   24.4   29.9  34.4      39.0   45.6
  12      720         7.89      10.5     14.7 17.4   20.9   25.8  29.7      33.9   39.8
  18     1080         6.20      8.29     11.6 13.9   16.7   20.7  23.9      27.3   32.1
  24     1440         5.23      6.99     9.87 11.8   14.2   17.6  20.4      23.4   27.6
  30     1800         4.56      6.11     8.66 10.3   12.5   15.6  18.0      20.7   24.4
  36     2160         4.07      5.46     7.76 9.28   11.2   14.0  16.2      18.6   22.1
  48     2880         3.38      4.54     6.49 7.79   9.46   11.8  13.7      15.8   18.7
  72     4320         2.55      3.44     4.95 5.97   7.27   9.12  10.6      12.2   14.5

Catchment Data

Variable    Value      Unit
 Area       0.9241      ha
  C10        0.68    fraction
   tc        5.9     minutes


Rational Results

                              AVERAGE RECURRENCE INTERVAL (years)
     Variable          1          2     5     10    20     50      100
    Freq Factor      0.544      0.578 0.646  0.68 0.714  0.782    0.816
 Intensity (mm/hr)   117.1      149.1 184.6 205.2 233.6  270.9    299.5
 Discharge (m3/s)    0.164      0.221 0.306 0.358 0.428  0.544    0.628


[OCR of page images]
Rational Method Data

Location: Cooroy

Australian Rainfall & Runoff IFD Coefficents

 

 

ah 2h 2l72 50], 5012 50172 F2 F50 G

 

50.33 10.62 3.48 | 91.03 | 24.96 8.8 4.39 17.57 0.13

 

 

 

 

 

 

 

 

 

Rainfall Intensity (mm/hr

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DURATION AVERAGE RECURRENCE INTERVAL (years)
hours minutes 1 2 5 10 20 50 100 200 500
0.08 5 124 158 195 217 247 286 317 347 389
0.10 6 116 148 184 204 232 269 298 327 366
0.17 10 96 122 151 168 191 222 246 270 303
0.25 15 80 102 127 141 161 187 207 228 255
0.33 20 70 89 111 124 141 164 182 200 224
0.42 25 63 80 100 111 127 147 163 180 202
0.5 30 57 73 91 101 116 135 149 164 184
0.75 45 45.9 59 73 82 94 109 121 133 150
1 60 39.1 50 63 70 80 93 103 114 128
1.5 90 30.3 39.0 | 49.7 56 65 76 85 94 106
2 120 25.2 32.6 | 42.0 47.7 55 66 74 82 93
3 180 19.4 25.2 | 33.1 38.0 44.4 53 60 67 77
45 270 14.9 19.5 | 26.1 30.2 35.6 43.0 48.8 55 63
6 360 12.3 16.3 | 22.0 25.7 30.4 37.0 42.2 47.6 55
9 540 9.50 12.6 17.4 20.4 24.4 29.9 34.4 39.0 45.6
12 720 7.89 10.5 14.7 17.4 20.9 25.8 29.7 33.9 39.8
18 1080 6.20 8.29 11.6 13.9 16.7 20.7 23.9 27.3 32.1
24 1440 5.23 6.99 | 9.87 11.8 14.2 17.6 20.4 23.4 27.6
30 1800 4.56 6.11 8.66 10.3 12.5 15.6 18.0 20.7 24.4
36 2160 4.07 5.46 | 7.76 9.28 11.2 14.0 16.2 18.6 22.1
48 2880 3.38 4.54 | 6.49 7.79 9.46 11.8 13.7 15.8 18.7
72 4320 2.55 3.44 | 4.95 5.97 7.27 9.12 10.6 12.2 14.5
Catchment Data
Variable | Value Unit
Area 0.9241 ha
Cio 0.68 fraction
te 5.9 minutes

 

 

 

Rational Results

 

AVERAGE RECURRENCE INTERVAL (years
Variable 1 2 5 10 20 50 100

 

 

Freq Factor 0.544 | 0.578 | 0.646 | 0.68 0.714 | 0.782 | 0.816

 

Intensity (mm/hr) 117.1 | 149.1 | 184.6 | 205.2 | 233.6 | 270.9 | 299.5

 

 

 

 

 

 

 

 

 

 

Discharge (m°/s) 0.164 | 0.221 | 0.306 | 0.358 | 0.428 | 0.544 | 0.628

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.