Revised Stormwater Management Plan
Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.
Attached to the e-mail Response to SEQ Water Third Party Advice - MCU16/0066 & OPW16/0133.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn • ground floor public lobby;
• a mall;
• the parking, loading and manoeuvring of motor vehicles;
• un-enclosed private balconies whether roofed or not.
Square Metres (sqm) Area in metres.
Water Supply Demand and Sewage Should the proposed development involve a Land Use
Discharge Impact Report Category that provides for a Water Supply Demand and
Sewage Discharge Impact Report, a suitably qualified and
experienced person or organisation must be engaged to
prepare this report for you. The proposed total number of
Equivalent Persons (EP) per Assessment Unit for that
development, the methodology used to determine that rate and
any benchmarking must be in the report.
Page 7 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.