Original source · versioned page text
Attachment 8 - Survey plan
Plans and drawings: the text below has words only, no drawings.
Very large file (32.1 MB): may take a few minutes to open.
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
16.51
16.44
16.40
G (D)
S (D)
16.37
16.41
16.40
)
16.49
(B //
16.46
S
S (D)
)
16.4716.48
16.62
E
C (D
(D
16.54
16.4816.50
(E
D (B)
D (A)
16.64
)
16.43
)
E
16.53
16.40
91
(B
E
)
)
16.39
16.5
(D
W
(B)
16.48
16.51
16.5
16.38
16.39
C
16.38
16.40
16.42
16.42
G (D)
S (D)
16.37
)
)
16.41
16.58
16.58
D (A) (B
(D
C (D
16.28
D (A) W
)
D (A)
E
(D
16.50
E
D (A)
S (D)
16.39
16.51
(B
16.40
S (D)
)
C
D (A)
16.32)
S (D) ) )
16.52
D (A) S (D) (D (D
D (A)
16.62
S (D)
16.45
16.28
S (D) ) S
S
(B
A)
16.56
S (D)
16.20
D (
W S (D)
G (D)
16.36
)
16.50
(D
)
(D
C (D
E
16.19
C
)
(B
S (D)
16.53
E
)
W
(
D (D)
B)
D) Admin
C (
) (D 5
)
Wing
16.32
)
(D
)
16.4
D
)
(B
(D
LEGEND:
16.30
16.50
(B
C
(D G
D) W
C (D
C (
)
E
Road Terrain
16.43
D
E (B)
Kerb Back Driveway
)
(D)
)
16.52
C
(B Kerb Invert Footpath
16.61
)
)
(D
16.5(D2) (D
W Edge of Bitumen Slab Edge
D
D)
C (
)
Edge of Gravel Retaining Wall Base
C
G
(D
(B
16.73
f Road Crown Retaining Wall Top
Entry Roo
)
16.37
E
D
D) )
C (D
C ( (B Traffic Park Meter Change of Grade
Over W Traffic Light Top of Bank
16.58
E (B)
Traffic Pit Toe of Bank
) ) 2(D)
)
)
16.54
16.53
D)
(D
C (
16.51
Traffic Sign Waterline
(D G
D
(D)
C
16.5
Traffic Post Box Garden Edge
16.87
S )
(B
(B
(D)
(D
Structures Creek Toe of Bank
17.04
D
)
C
W
16.57
16.99
16.95 Building Line Creek Top of Bank
E
(D)
C (D
S D)
C ( Special Care Roof Ridgeline Creek See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.