Original source · versioned page text
Attachment 8 - Survey plan
Plans and drawings: the text below has words only, no drawings.
Very large file (32.1 MB): may take a few minutes to open.
Original PDF page 8, section 2. The text section number identifies this passage in the reader.
Base
16.28
Co
(B
16.29
/
) Road Crown Retaining Wall Top
W (B)
D
E
/
)
(D Traffic Park Meter Change of Grade
(D
S 0
)
16.0
)
Traffic Light Top of Bank
16.44
(B
16.04
Traffic Pit Toe of Bank
16.28
E
3 3
16
16.27 16.47
E
16.42
16.20
16.17
16.3
(B
16.22
Traffic Sign Waterline
)
16.26
)
16.27(B
16.39
16.3
16.34
Special Care Traffic Post Box Garden Edge
D
E
Structures Creek Toe of Bank
(D
)
Wing
(D
16.38
/
Creek Top of Bank
)
W (B)
Building Line
)
D (D) D (D) D (D)
(B
16.12
16.22
/
E
S
16.37
Roof Ridgeline Creek Invert
15.76
(B
E
D ) Fence Line Creek Waterline
16.16
)
16.21
16
16.17
(D Tree
(B
// ) E (B)
Gate
D
15.86
E (B)
16.40
Hand Rail Tree Canopy
E
16.18
(D
)
Cattle Grid Control Point/PSM
(D
)
Bollard Drainage
S
W (B)
Sewer Drainage line
16.24
D(*)
)
Open Drain
16.13
Sewer Line
(B
S(*)
16.23
Manhole
16.22
Valve
E
)
Field Inlet
16.23
Inspection Opening
(D
Manhole Downpipe
S
16.52
16.22
U (A)
Electrical Communications
16.38
16.37
Electricity Line C(*) Communication Line
W (B)
E(*)
16.13 D)//
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.