Original source · versioned page text
Operational Works Application - OPW19/0006 - 81 Hastings Street, Noosa Heads
Subject: 190110- Operational Works Application - 81 Hastings Street Noosa Heads. From: Jono Medhurst Date: 2019-01-09T21:34:39+00:00 To: Mailbox Council Mail Please find attached Operational Works Application for proposed works to the Footpath at the entry of 81 Hastings Street. Noosa Heads Jono Medhurst Director Architect FAIA B. Arch (QIT) [Medhurst Architects]<https://apac01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.medhurstarchitects.com.au%2F&data=02%7C01%7C[email protected]%7Cfb1afccf51c741c53daa08d6767a5571%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C1%7C636826666610217177&sdata=I3B6gWQiqgPTQcR3RLGOPsi%2FDe8amiBqwR8g67NdfnE%3D&reserved=0> 92 Petrie Tce Brisbane Qld 4000 07 3368 2318 0410 600 014 jono@ medhurst architects .com.au [http://www.medhurstarchitects.com.au/esigAssets/Symbol.jpg]<https://apac01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.medhurstarchitects.com.au%2F&data=02%7C01%7C[email protected]%7Cfb1afccf51c741c53daa08d6767a5571%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C1%7C636826666610227186&sdata=AZP3tiKzJo%2BLRK4Xdbhl%2BeuuVx0xmiJZkv6wbWNV5SU%3D&reserved=0> [Attachment: 190110-Operational Works Application.pdf] Memo Date 10/01/19 Project Hastings Park, Noosa Heads Project No. 811044 To Noosa Shire Council Attn Infrastructure and planning Copy Client Subject Operational Works Application - Footpath Work Noosa Shire Council We advise that the Hastings Park Body Corporate propose to undertake footpath access works at the entrance to the existing development at 81 Hastings Street Noosa Heads (Hastings Park). Following discussions with the NSC, and on behalf of the Hastings Park Body Corporate we submit an Operational Works application for these proposed works. Please refer attached a copy of the Form 1 Application and a copy of drawings with works proposed. Due to the nature of the works can you please advise on an application fee to reflect the extent of work proposed. Due to the arrangement of the existing footpath it is proposed that the access path is upgraded and widened to allow easier access to the development rather that up the driveway which it is intended to closed off with a vehicle barrier. It is proposed to commence these works in the first week of February 2019. We confirm that the Hastings Park Body Corporate will be funding these works. The contractor proposed to undertake these works is Carrier Constructions from Sunshine Beach. Please contact me to discuss. Thanks. Jono Medhurst Medhurst Architects 0410 6000 14 PF 29 Memo PF 29 Memo.Docx No 1 Page 1 of 1 Issue 6 25/01/18
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.