Negotiated Decision Notice - Concurrence Agency - EPA [As Published] · 132008.170

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                              Officer:            Glen Conforti
                                              Direct Telephone:   (07) 5449 5379
                                              Response Address:   PO Box 141, Tewantin QLD 4565
                                              Email:              [email protected]
                                              Our Reference:      2008/170
                                              Your Reference:     BNE5690 Vol 16 – AMA 6560
30 September 2008

Environmental Protection Agency
GPO Box 2771
BRISBANE QLD 4001



Dear Sir

                              Negotiated Decision Notice
                                   Integrated Planning Act 1997

Your Department was a referral agency for the above application and provided a response to Council
in a letter dated 26 March 2008. Following representations made by the applicant, Council on 30
September 2008 agreed to issue a Negotiated Decision Notice.
Details of the negotiated decision are as follows:

1        APPLICATION DETAILS

    Application No:           2008/170
    Street address:           8 Egret Street, Peregian Beach
    Real property             Lot 293 P 93112
    description:
    Planning Scheme:          The Noosa Plan

2        DECISION DETAILS
Council on 24 April 2008 decided to issue the following type of approval:-
        Development Permit for Material Change of Use - Multiple Housing Type 2 - Duplex
In relation to representations, Council on 30 September 2008 decided to:
A.       Agree to amend Conditions 5.5, 11, 20 & 24
B.       Agree to delete Condition 37
C.       Amend Condition 25
D.       Refuse to delete Conditions 19 and 45 for the following reasons:
         Condition 19
         The condition is required to ensure that acceptable carparking will continue to be provided on
         site.
         Condition 45
         The condition is required to ensure that suitable protection is provided for Council’s
         infrastructure at the completion of the development.
                                                                                                 1 of 18
Full text of the other 17 pages

Page 2

                                                                                        2008/170




E.   Issue a Negotiated Decision Notice

3    RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4    ASSESSMENT MANAGER CONDITIONS

Land Use
1.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are titled and numbered Site Plan – SK
     1.1, Basement – SK 1.2, Ground Floor – SK 1.3, Upper Floor – SK 1.4, Roof Plan SK 1.5,
     South Elevation – SK 2.1, East Elevation – SK 2.2, North Elevation – SK 2.3, West Elevation –
     SK 2.4, Section A – SK 3.1, Section B – SK 3.2, Section C – SK 3.3 and Height Line Analysis
     – SK 4.1 prepared by Sparks Architects and dated 31.01.08 and as may be amended by these
     conditions.
2.   The development must be undertaken and operated in a manner that causes no detrimental
     effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
     lighting or other emissions.
3.   All fencing shall be setback at least 1 metre from the front property boundary, with at least half
     of the fencing to be setback 2 metres. The area of land between the fence and the front
     property boundary shall be densely landscaped to screen any fencing.
4.   Existing trees on the site and within road reserves are to be retained, except where required to
     be removed due to building operations or the conduct of the approved use.
5.   The open space and setback areas are to be landscaped in accordance with Council’s Policy
     on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to
     be completed prior to the premises being occupied and maintained at all times thereafter. The
     landscape plan shall clearly indicate the planting of:
     5.1.   Screening vegetation in the form of native trees and understorey plantings along a
            portion of the southern property boundary between the fence and building wall to ensure
            the visual amenity and privacy of the public pathway.
     5.2.   Dense screening vegetation in the form of native trees and understorey planting
            adjacent to the eastern facade of each dwelling. This planting shall minimise the visual
            impact of the dwellings upon the Egret Street streetscape.
     5.3.   One significant native tree (minimum 100 litre) adjacent to the south-eastern corner of
            the southern dwelling, to minimise the visual impact of this dwelling on the Egret Street
            streetscape.
     5.4.   Additional vegetation in the road reserve between the eastern boundary of the site and
            Egret Street. Any grass provided shall be couch, free of weeds.
     5.5.   The Hoop Pine located on the north-eastern boundary of the site is to be retained and
            as such, the stormwater pipe shall be relocated away from its root system. Should the
            tree need to be removed due to its condition in the future, an arborist’s report shall be
            submitted to Council demonstrating the hoop pine is unsafe and removal is warranted.
6.   Cleared vegetation is to be suitably processed by one of the following methods and removed
     from the site:-
     6.1.   Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
            loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
            minimum of 10 metres between edges of heaps.

                                                                                         2 of 18

Page 3

                                                                                      2008/170




      6.2.   Disposal for firewood.
      6.3.   Disposal for landscaping purposes.
      6.4.   Transport to alternative site for breaking down materials provided that all necessary
             permits have been obtained to allow the alternate site to be used for this purpose.
      6.5.   The disposal method for clearing works is to be submitted in conjunction with an
             application for a Development Permit for Operational Work. The Applicant is advised
             that other methods may be considered provided full details of the method are submitted.
      6.6.   The Applicant is advised that burning off is an unacceptable method of disposal.
7.    Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
      thus remaining as open structures.
8.    The development shall not exceed a maximum height of 2 storeys and 8 metres above natural
      and finished ground level.
9.    A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of the work confirming compliance with the
      maximum building height above natural surface required by the Planning Scheme.
10.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation rating System as defined by the AS/NZS 6400 (Water
      Efficient Products – Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2). All tap ware and shower roses shall not exceed a maximum flow
      of 9 litres per min. Dishwashers and washing machines are excluded from this requirement.
11.   Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for operational works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
12.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
13.   The Development Permit for a material change of use of premises lapses if the use has not
      happened by 24 April 2012, unless an application to extend the currency is approved by
      Council.
14.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for Building Works.
Land Development
Vehicle Access
15.   A vehicular access driveway to serve the development shall be constructed from the Egret
      Street frontage of the site with a maximum width of 3.0m.
16.   The driveway shall be designed and constructed to Council’s design standards and to grades
      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
      movements along the footpath without any step or level difference. Should any driveways be
      constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
      the driveway be removed and reconstructed to levels that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
      trip or fall.


                                                                                       3 of 18

Page 4

                                                                                        2008/170




17.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
      the driveway and any associated fencing or vegetation near the driveway shall comply with the
      minimum sight line requirements as defined in AS2890.1, section 3.2.4. The applicant shall
      demonstrate compliance by illustrating these sight lines on the plans submitted for both
      Operational Works approval and Building Works approval.
18.   All vehicles shall enter and leave the site in a forward direction.
Car Parking
19.   Carparking shall be provided within the site generally as shown on drawing number SK 1.1
      prepared by Sparks Architects and dated 31 January 2008, except as modified herein.
20.   All nominated visitor parking spaces shall be aligned such that vehicles can access the space
      in a forward gear, reverse out and exit the site in a forward gear in a total of 3 movements.
      The applicant shall demonstrate compliance by illustrating the vehicle paths on the plans
      submitted for both Operational Works approval and Building Works approval.
21.   The landscaping internal to the site adjacent to the driveway shall be designed such that the
      vegetation does not impede sight lines for the vehicles manoeuvring within the site. The
      applicant shall demonstrate compliance by illustrating these sight lines on the plans submitted
      for both Operational Works approval and Building Works approval.
22.   A minimum of 1 uncovered carpark space and 2 covered carpark spaces shall be provided on
      site.
23.   The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
      for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and
      with a minimum head clearance (headroom) at any point of 2.2m.
24.   All “visitor” spaces shall be clearly defined by sign posting each space with appropriate similar
      wording to prevent misuse. The type of sign posting shall be clearly shown on all plans
      submitted for Operational Works approval.
25.   All carparking shall be kept and maintained in a condition fit for use.
Vegetation Protection & Preservation
26.   Vehicular pavements within the drip zone of any of the existing trees on site to be retained
      shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
      allow water that falls on this surface to penetrate to the trees root system. The pavement shall
      be constructed so as not to damage the tree or their root system and in this regard temporary
      fencing shall be provided around the trees during construction to help protect them.
      Plans shall be submitted to the Council for approval that clearly show the type and extent of
      the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
      Operational Works.
Frontage Works
27.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      Egret frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping
      Plants & Guidelines. Grass shall be couch, free of weeds.
28.   All driveways and parking areas shall be designed and constructed to ensure pedestrian
      safety using non-slip materials, to produce an evenly graded surface finish, and to be in
      accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design
      for Access & Mobility.




                                                                                          4 of 18

Page 5

                                                                                       2008/170




29.   The full length of the Egret Street frontage of the development site shall be upgraded by
      providing kerb & channel. All associated and ancillary work including pavement correction to
      the existing pavement, drainage works, modification of the footpath, and adjustments to the
      existing infrastructure shall be undertaken to complete the frontage widening.
      In this regard a specifications and plans detailing this work shall be prepared and submitted to
      Council for approval prior to obtaining a Development Permit for Operational Works.
30.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
      footpath paving and landscaping such as trees and grasses in accordance with Council’s
      Standard specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
31.   Roof Water & Stormwater Drainage of the development shall be generally as shown on
      drawing number 1901-2 prepared by Construction Hydraulic and dated 20 March 2008, except
      as modified herein.
32.   The alignment of the drainage line and the location of the proposed connection manhole shall
      be revised such that the direction of flow is consistent with Council’s existing line.
33.   The amount of cover over the new drainage lines and the vertical and horizontal clearances to
      the existing services in Egret Street shall be in accordance with Council standards or the
      relevant authority guidelines. These clearances are to be clearly shown on any plans
      submitted for Operational works approval.
34.   Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
      (minimum storage 3000 litres per dwelling/unit) that is installed to ensure water from the tank
      is used for external uses (such as watering gardens, irrigation, ornamental ponds, water
      features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of toilets
      internal to the dwelling. All rainwater tanks are to be designed and installed in accordance
      with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and shall be part
      of the plumbing application in conjunction with the building approval. The location and
      capacity of the tanks shall be clearly shown on the plans submitted for Building Works /
      Operational Works approval and any overflow shall be directed to the stormwater drainage
      system.
35.   All stormwater drainage (including roof water overflow from the rainwater storage system)
      shall be collected and discharged so there is no net increase in stormwater runoff from the
      site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s
      existing drainage structures in Egret Street. Plans of the drainage design shall be prepared by
      a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
      Development Permit for Operational Works.
36.   The retaining walls and fencing proposed along the western boundary of the site shall be
      designed and constructed such that they do not impede, concentrate or redirect overland flow
      from the adjoining upstream properties onto any adjoining properties or to Council’s pathway.
      The type of wall and fencing shall be clearly shown on the plans submitted for Building Works /
      Operational Works approval.
37.   Deleted.
38.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
39.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.



                                                                                         5 of 18

Page 6

                                                                                         2008/170




40.   The existing sewer main that is located in the adjoining property at the rear, the side and the
      front of the site and the ‘zone of influence’ (taken as the area within a 45-degree angle
      measured from the invert of the sewer main to the finished surface level) shall be accurately
      located and determined by a licensed Surveyor and shown on all plans submitted for
      Operational Works approval.
      To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
      risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
      retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
      ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
      As such the applicant shall amend Operational Works plans including Building plans to ensure
      compliance.
Town Water Supply
41.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
42.   Each individual water connection to the water reticulation system shall extend to the property
      boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
43.   All water meters must be located outside the property boundary and in an easily assessable
      location to facilitate unhindered reading by Council and/or Council’s contracted water meter
      readers, and not behind fences or locked gates. In this regard approval of the water meter
      configuration and location must be obtained from Council’s Water & Sewerage Capital Works
      Manager prior to lodgement and approval of hydraulic drawings.
44.   For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development
      shall be served by:
      44.1. A single Body Corporate water meter to measure the total water consumption (including
            fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
      44.2. Individual water meters to each tenement capable of being separately rated, and
      44.3. A fire service (fully testable single detector check with metered bypass), where
            applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
            reels).
Service Easements (Sewer)
45.   A registered easement shall be created over the zone of influence of all sewers within the
      subject site and over those parts of the subject site that are impacted upon by sewers on any
      adjoining sites. The easements shall generally be parallel to and centred over the sewer main
      and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
      within the allotment (measured from the finished surface) and be no less than 3.0m wide
      overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
      determine the necessary width of the easement, which shall be shown on any plans submitted
      for Operational Works / Building Works approval. To this extent the surveyor shall certify that
      the sewer and the zone of influence is wholly contained within the easement to be created.
      In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
      undertaking in writing that the Title Deed and the easement documents will be lodged at the
      Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
      Council will be attended to promptly.

      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing.

      Any changes required by Council’s Solicitor must be corrected immediately.

                                                                                          6 of 18

Page 7

                                                                                           2008/170




46.   No building or other structure shall be constructed or encroach over an easement.
Earthworks
47.   Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s
      Engineering Design Standards Manual and so as not to cause the additional ponding of water
      on any adjoining lands or the blockage of, or interference with, any natural watercourses.
48.   Earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences and/or structures and/or lands that border the development site. Fences that are
      affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification.
      In this regard any fences to be replaced shall be clearly shown on the plans submitted for
      Operational Works approval.
Site Stability
49.   A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
      determine the soil classification, establish whether any measures are required to protect the
      stability of adjoining buildings and/or structures and/or lands, and make recommendations on
      the type of foundation system(s) best suited for the proposed development. The
      recommendations of this report shall be incorporated into the design and construction of the
      proposed development.
Erosion and Sediment Control
50.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to
      be submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works.
Contributions Towards Council Infrastructure
51.   Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
      only of the contribution amounts under the current Council policies and requirements is
      outlined in the table below:

       Contribution Required For:                                                        Amount:
       PSP12 – Public Open Space Contributions (Park)                                    $3,034
       PSP16 – Sewerage Headworks Contributions                                          $7,460
       PSP17 – Water Supply Headworks Contributions                                      $4,725
       PSP20 – Pathway Trunk Network Contributions                                       $1,364
       TOTAL Contribution Amount =                                                       $16,583
       Please note, that these amounts are all subject to variations in the Consumer Price Index, All
       Groups Brisbane from December 2007 until the date of payment.

      All contributions must be paid prior to the issue of a Development Permit for Operational
      Works.

      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
      contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
      full.

                                                                                             7 of 18

Page 8

                                                                                        2008/170




      Processing of bonds for security where specific Council approval has been given for the
      bonding of contributions will incur an administration fee in accordance with Council’s Land
      Development Commercial & Regulatory Fees at the time of lodgement.

      In the event that the Development Permit for Material Change of Use of Premises lapses or is
      cancelled, the trading bank guarantee will be returned.
General
52.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works that will become Council infrastructure, which shall be
      submitted in conjunction with an application for a Development Permit for Operational Works.
      In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
      submitted in conjunction with any application for Operational Works.
53.   Digital detailed designs including drawings, calculations, specifications etc, shall be submitted
      with any application for a Development Permit for Operational Works in respect of roadworks
      and stormwater drainage works. The design shall be in accordance with Council’s Planning
      Scheme Policy PSP05 – Engineering Design Standards – Roads, Drainage and Earthworks.
      To avoid conflict with underground pipes or services, all existing and proposed services
      required by the development shall be shown on the plans.
54.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).
55.   A construction management plan/strategy to ensure no damage occurs to Council services
      shall be prepared by a suitably qualified Registered Professional Engineer and submitted to
      Council in conjunction with any application for Operational Works.
56.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
57.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
58.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
59.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
      type of all services and structures. All of which shall be submitted to Council for checking and
      for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au).

      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
Environmental Health
60.   The developer must provide a suitably screened imperviously paved area large enough for all
      refuse and recycling containers.



                                                                                          8 of 18

Page 9

                                                                                       2008/170




61.   Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
      located in a manner which prevents a noise nuisance beyond the subject land in accordance
      with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
      fines apply for such offences.
62.   Noise emission from air conditioning equipment shall comply with the following requirements:
      62.1. The equipment shall be installed and located in a manner which prevents noise
            nuisance beyond the subject land in accordance with the nuisance provisions of the
            Environmental Protection Regulation 1998 and Council’s Local Law No. 12 - Control of
            Nuisances. Infringement Notices (on-the-spot fines) may apply for offences.
      62.2. Submission of written certification from a suitably qualified person confirming that the
            noise levels comply when measured at the nearest residential boundary. This is
            required immediately after installation of the equipment and prior to any occupation of
            the building, and in a format approved by Council.
      62.3. A person must not use equipment on any day if it makes or causes noise to be made–
              62.3.1.   Before 7am or after 10pm: More than the lower of either –
                               40 d(B)A
                               3 d(B)A above the background noise level
              62.3.2    From 7am to 7pm: More than the lower of either –
                               50 d(B)A
                               5 d(B)A above the background noise level
              From 7pm to 10pm: More than 3 d(B)A above the background noise level
5     REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger             Referral Status    Referral Agency       Referral Address

 Unexploded Ordnance          Concurrence        Environmental         GPO Box 2771
                                                 Protection Agency     BRISBANE QLD 4001

A copy of any referral agency conditions is attached.

6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.         Rev.   Plan / Document Name                    Date

 SK1.1                              Site Plan – Sparks Architects           31.01.08

 SK1.2                              Basement – Sparks Architects            31.01.08

 SK1.3                              Ground Floor – Sparks Architects        31.01.08

 SK1.4                              Upper Floor – Sparks Architects         31.01.08

 SK1.5                              Roof Plan – Sparks Architects           31.01.08


                                                                                        9 of 18

Page 10

                                                                                        2008/170




 SK2.1                             South Elevation – Sparks Architects       31.01.08

 SK2.2                             East Elevation – Sparks Architects        31.01.08

 SK2.3                             North Elevation – Sparks Architects       31.01.08

 SK2.4                             West Elevation – Sparks Architects        31.01.08

 SK3.1                             Section A – Sparks Architects             31.01.08

 SK3.2                             Section B – Sparks Architects             31.01.08

 SK3.3                             Section C – Sparks Architects             31.01.08

 SK4.1                             Height Line      Analysis   –    Sparks   31.01.08
                                   Architects

 1901-2                            Roof Water & Stormwater Drainage –        20.03.08
                                   Sparks Architects

7    ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.   The applicant is advised that development contributions and infrastructure charges applicable
     to this development approval have been based on the following Uses Class/ Uses and
     applicable quantities:-

                   Existing Development                            Approved Development
          Existing Use Class                            Approved Use Class
                                  Existing Quantity                              Approved Quantity
                 / Use                                        / Use
                                                        Multiple Housing -
         Detached House         Vacant Land                                      2 x 3 Bedroom Units
                                                        Type 2 – Duplex

2.   The applicant is informed that approval of this development application will trigger an
     Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
     Charges Plan for the estimated amount of $3,875 and is subject to variations in the Consumer
     Price Index, All Groups Brisbane from December 2007 until the date of payment. An
     Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
     Planning Act 1997.
3.   The applicant is informed that payment via credit card transaction will not be an acceptable
     method of payment for development contributions conditioned in this permit or for
     infrastructure charge notices issued separately.
4.   The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
     Local Law No. 12, prevents a builder or building contractor carrying out building work on a
     building site in a way that makes or causes audible noise to be made from the building work:-
     4.1.     On a Sunday or public holiday, at any time; or
     4.2.     On a Saturday or a business day, before 7.00am or after 6.30pm.
     A maximum penalty of $1,500 applies to an offence under this legislation.

                                                                                        10 of 18

Page 11

                                                                                            2008/170




5.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
      cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where
      it could reasonably be expected to move into a roadside gutter, stormwater drain or a water
      course. On the spot fines apply for such offences.
6.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
      the cost of operational works exceeds $80,000, then a portable long service leave levy is
      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
      the approved form issued by the Building and Construction Industry (Portable Long Service
      Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
      declaration outlining the cost of the operational works must be submitted to Council with the
      lodgement of any application for operational works over the site.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable

9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable

10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit               Subject of the required Development Permit
 required
 Development Permit for Building          Duplex Dwelling
 Works

 Development Permit for Operational       Landscaping, Carparking & Access, Frontage Works,
 Works                                    Stormwater Drainage & Erosion and Sediment Control.

11    SELF ASSESSABLE CODES

Not applicable
12    SUBMISSIONS

Not applicable

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
                                                                                            11 of 18

Page 12

                                                                                      2008/170




14     RIGHTS OF APPEAL

You have continuing appeal rights in respect of Council’s decision on your application. Refer Section
4.1.27. of the Integrated Planning Act 1997.

15     OTHER DETAILS
Should you wish to obtain more information about Council’s decision, electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

DECISION NOTICE HISTORY
 Original Decision Notice issued 24 April 2008.
 Negotiated Decision Notice issued 30
  September 2008 with amendment to
  Conditions 5.5, 11, 20, 24 & 25.
Yours faithfully,




Denis Wallace
PLANNING OFFICER




                                                                                       12 of 18

Page 13

                                            2008/170




Referral  Agency      Conditions                        –
Environmental Protection Agency
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                             13 of 18

Page 14

2008/170




14 of 18


[OCR of page images]
2008/170

 

IDAS C-6

Defence also recommends that owners or occupiers of potentially affected land and workers and
contractors employed on the land need to be aware of the procedure if a suspect object is found.

As the EPA has no record of the site being further investigated or remediated, it is considered that
there remains a possibility of UXO being found on it.

4 Conditions
The following concurrence agency conditions are to be attached to any approval:

41 Prior to the commencement of any development-related excavation, earthworks or soil
disturbance, that part of the site to be so worked is to be subjected to investigation and,
where necessary, appropriate remedial action.

4.2. Any person employed to work on any part of the site where Condition 4.1 has not been
satisfied is to be forewarned in writing by the applicant.

This warning is to explain that information available to the EPA indicates a potential for
residual UXO exists on the site and work should proceed with due caution. It is to state the
procedure to be followed by any person finding an object suspected of being explosive
ordnance or component thereof:

Do not disturb the object.

Take action, where appropriate, to prevent it being disturbed by another person.
Note its approximate dimensions and general appearance.

Note the route to its location.

Advise the Police as soon as possible.

4.3 Following investigation and any remedial action taken to satisfy Condition 4.1 above, the
applicant is to submit a report, prepared in accordance with current guidelines, to the EPA for
assessment. The EPA is to subsequently advise the Noosa Council and the applicant of its
assessment in regard to Condition 4.1 being satisfied.

4.4 No gravel, rock, sand or soil is to be removed from the balance part of site without written
EPA approval.

4.5 The applicant is to advise the owner and any occupier of the site of the above responsibilities.

5 Additional comments or advice

Applicants may contact the EPA’s Contaminated Land Unit on (07) 3224 5644 or visit the Defence
website http:// defence. gov.al o/ for the details of current UXO investigation and remedial
search contractors. The EPA accepts reports based on investigative and remedial work carried out
by these contractors.

    

 

Investigation and remedial action to satisfy Condition 4.1 typically involves sampling/search
programs with detection equipment unless the use of such equipment is:
© considered unwarranted by a UXO contractor due to the extent of any prior excavation or
earthworks or, conversely, of any filling proposed as-part of the development program; or
* prevented or made impracticable by the presence of a structure, stockpile, natural barrier or
metal waste.

VER2

14 of 18

Page 15

2008/170




15 of 18


[OCR of page images]
2008/170

 

IDAS C-6

In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For
example, where the risk of exposure to any UXO that may exist is reduced by the presence of a
structure or natural barrier, issuance of the standard UXO warning (see Condition 4.2) may suffice
while the structure, stockpile or barrier remains in place. Where a structure is to be removed or
reduced as part of the development program, protective precautions, commensurate with any greater
tisk to which workers might then be exposed, may need to be considered. Progressive assessment
will be necessary where such circumstances exist. Unless, at the completion of preliminary works,
there is evidence then available to the UXO contractor that any residual risk is negligible, the use of
detection equipment will typically be required to confirm the site’s status.

Where investigation, along with any subsequent remedial action and assessment, is to be
implemented by stages to satisfy Condition 4.1 and 4.3, a preliminary investigation report should be
submitted by the applicant to the EPA along with a management plan for the proposed work. Staged
investigation/remediation is most likely to be applicable where development of smaller, built-on lots
(which can present circumstances such as those discussed above) or broadhectare sites is proposed. In
such cases, the EPA’s assessment of the report and advice to Council in regard to approval of the
development will be dependent on agreement with the management plan.

Where Condition 4.1 is to be satisfied by a whole lot or broadhectare development stage being
subjected to investigation and any necessary remedial action, the EPA, based on the subsequent
investigation/remediation report’s findings and recommendation/s, may reassess the lot, or that portion
comprising the development stage, as being remediated or not needing remediation, and advise the
applicant and Council accordingly. Otherwise, any balance of land that has not been further
investigated will retain the risk assessment made by Defence. This is unless evidence obtained from
the investigated part/s can be used to refute Defence’s assessment in regard to all or part of the
balance. In the latter case, the EPA may reassess all of the balance or the applicable part/s as being
unaffected by UXO.

6 Additional information

This concurrence response applies only to contaminated land issues and does not remove the need to
obtain any further approval for this development which may be required by this or other legislation,
State and/or Commonwealth. Applicants are advised to check with all relevant statutory authonties.
Applicants should also comply with all relevant legislation.

The EPA has not provided a notification to native title parties for this application. The State’s
Native Title Work Procedures indicate that the responsibility for assessment of native title issues for
an IDAS application rests with the Assessment Manager. It is recommended that the Assessment
Manager determines whether native title notification is required for this application.

*End of response*
IDAS C-6 CLM

VER2

15 of 18

Page 16

2008/170




16 of 18


[OCR of page images]
2008/170

UNEXPLODED ORDNANCE (UXO) CONTRACTORS

Department of Defence accredited UXO investigation and remedial search contractors are listed below.
The Environmental Protection Agency (QLD) accepts reports based on investigative and remedial work carried out by these contractors.

 

 

BACTEC South East Asia Pty Ltd

Managing Director:
Timothy Pippett

Unit 1, 43 Stanley Street
PEAKHURST NSW 2210

Tel: (02) 9584 7500
Mobile: 0412 663 541
Fax: (02) 9584 7599
Email:

 

Manager, Explosive Ordnance Services:
Mark Latimer

Tel/Fax: (07) 5526 0881
Mobile: 0438 443 283
Email!: [email protected]

 

 

G-tek Australia Pty Ltd

Chief Operating Officer:
Greg Guthrie

25 Applecross Avenue
CASTLE HILL NSW 2154

Tel: (02) 9680 7268
Mobile: 0418 977 424
Fax: (02) 9680 7403
Emai'

 

Website:

http://www.g-tek.biz/

 

UXO Projects Manager:
Max Verrier

Tel: (07) 5493 8577
Mobile: 0418 776 203
Fax: (07) 5493 7405

 

 

Milsearch Pty Ltd

Managing Director:
David Halmarick

Unit 5, Level |

30 Mawson Place
MAWSON ACT 2607
Mailing Address:

PO Box 687
MAWSON ACT 2607

Tel: (02) 6286 8299

Mobile: 0419 944 397

Fax: (02) 6286 8266

Email: [email protected]

Website: http://www.milsearch.com.au/

Queensland Operations Manager:
Paul Ingerton

Tel: (07) 3824 1669
Mobile: 0413 452698
Email: [email protected]

 

 

CSG Demining Consultants

(Offers all Consultancy & Investigation
services but does not undertake
Remediation)

Managing Director:

Carl Chirgwin

151 Golf Links Road
MAIDEN GULLY Vic 3551

Tel: (03) 54462408
Mobile: 0417-527264
Fax: (03) 54462481
Email: chirgwins:
Website:
http://www.csgdemining.com.au

   

 

  

 

 

 

This list is drawn from the Department of Defence National UXO Office's panel of UXO investigation and remedial search companies that can be found on

 

http://www.defence.goy.au/uxo/
Version — 21/08/2007

16 of 18

Page 17

                                                                                                  2008/170




                                                Appeal Rights
                                               INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                     (5) If an application is processed under section
Planning Act (Chapter 4).                                     6.1.28(2), appeal rights for submitters for the
Division 8 - Appeals to court relating to                     application are available only for the aspects of the
development applications                                      development that would have required public
                                                              notification under the repealed Act.
Appeals by applicants
                                                                    (6) If an application involves assessment against a
4.1.27.(1) An applicant for a development application         concurrence agency code, appeal rights for
may appeal to the court against any of the following-         submitters for the application are not available against
(a) the refusal, or the refusal in part, of a development     the part of the approval that represents the
    application;                                              concurrence agency’s response for the code.
(b) a matter stated in a development approval,                Appeals by advice agency submitters
    including any condition applying to the                   4.1.29.(1) An advice agency may, within the limits of
    development, and the identification of a code             its jurisdiction, appeal to the court about the giving of
                          1
    under section 3.1.6;                                      a development approval for a development application
(c) the decision to give a preliminary approval when a        if-
    development permit was applied for;                       (a) the development application involves impact
(d) the length of a currency period;                                assessment; and
(e) a deemed refusal.                                         (b) the advice agency told the applicant and the
    (2) An appeal under subsection (1)(a) to (d) must               assessment manager to treat its response to the
be started within 20 business days (the “applicant’s                application as a submission for an appeal.
appeal period”) after the day the decision notice or                (2) The appeal must be started within 20 business
negotiated decision notice is given to the applicant.         days after the day the decision notice or negotiated
    (3) An appeal under subsection (1)(e) may be              decision notice is given to the advice agency as a
started at any time after the last day a decision on the      submitter.
matter should have been made.                                 Appeals for matters arising after approval given
Appeals by submitters                                         (co-respondents)
4.1.28.(1) A submitter for a development application          4.1.30.(1) For a development approval given for a
may appeal to the court about-                                development application, a person to whom any of the
                                                              following notices have been given may appeal to the
(a) the giving of a development approval, including           court against the decision in the notice-
    any conditions (or lack of conditions) or other
    provisions of the approval; or                            (a) a notice giving a decision on a request for
                                                                    extension of the currency period for an approval;
(b) the length of a currency period for the approval.
                                                              (b) a notice giving a decision on a request to make a
    (2) The appeal must be started within 20 business               minor change to an approval.
days (the “submitters appeal period”) after the day
the decision notice or negotiated decision notice is                (2) The appeal must be started within 20 business
given to the submitter.                                       days after the day the notice of the decision is given
                                                              to the person.
    (3) If a person withdraws a submission before the
application is decided, the person may not appeal the               (3) Subsection (1)(a) does not apply if the
decision.                                                     approval resulted from a development application
                                                              (superseded planning scheme) that was assessed as
    (4) If an application involves both impact                if it were an application under a superseded planning
assessment and code assessment, appeal rights for             scheme.
submitters are available only for the part of the
application involving impact assessment.                            (4) Also, a person who has made a request
                                                              mentioned in subsection (1) may appeal to the court
                                                              against a deemed refusal of the request.
                                                                    (5) An appeal under subsection (4) may be started
                                                              at any time after the last day the decision on the
                                                              matter should have been made.
1
   Section 3.1.6 (Preliminary approval may override local
planning instrument)
                                                                                                   17 of 18

Page 18

                                                                                             2008/170

Division 9 - Appeals to court about other matters          4.2.9(1) An applicant for a development application
Appeals for matters arising after approval given           may appeal to the Building and Development Tribunal
(no co-respondents)                                        against any of the following-
4.1.31.(1) A person to whom any of the following           (a) the refusal, or the refusal in part, of a development
notices have been given may appeal to the court                application;
against the decision in the notice-
(a) a notice giving a decision on a request to change      (b) a matter stated in a development approval,
    or cancel a condition of a development approval.           including any condition applying to the
                                   2                           development, and the identification of a code
(b) a notice under section 6.1.44 giving a decision to         under section 3.1.6;
                                                                                    3
    change or cancel a condition of a development
    approval.                                              (c) the decision to give a preliminary approval when a
                                                               development permit was applied for;
    (2) The appeal must be started within 20 business
        days after the day the notice of the decision is   (d) the length of a period mentioned in section 3.5.21
        given to the person.                                   currency period;
    (3) Also, a person who has made a request              (e) a deemed refusal.
        mentioned in subsection (1)(a) may appeal to           (2) An appeal under subsection (1)(a) to (d) must
        the court against a deemed refusal of the          be started within 20 business days (the “applicant’s
        request.                                           appeal period”) after the day the decision notice or
    (4) An appeal under subsection (3) may be started      negotiated decision notice is given to the applicant.
        at any time after the last day the decision on         (3) An appeal under subsection (1)(e) may be
        the matter should have been made.                  started at any time after the last day a decision on the
Appeals against decisions to change approval               matter should have been made.
conditions under the repealed Act                          The Registrar for the Building and Development
4.1.33A.(1) A person who is dissatisfied with a            Tribunal may be contacted at the website
decision made on an application to change the              http://www.localgovernment.qld.gov.au/
conditions attached to an approval given under             For Infrastructure Charges Only
section 2.19(3)or section 4.4 of the repealed Act may      4.1.36 Appeals about particular infrastructure
appeal to the court against-                               charges
(a) the decision; or                                       (1) This section applies to a person who has been
(b) a deemed refusal of the application.                   given, and is dissatisfied with, an infrastructure
    (2) An appeal under subsection (1)(a) must be          charges notice or a regulated State infrastructure
started within 20 business days after the day notice of    charges notice.
the decision is to be given to the person.                 (2) The person may appeal to the court against the
    (3) An appeal under subsection (1)(b) may be           notice.
started at any time after the last day a decision on the   (3) The appeal must be started within 20 business
matter should have been made.                              days after-
Appeals against local laws                                 (a) if the notice is given because of a development
4.1.33B.(1) An applicant who is dissatisfied with a             approval or master plan approval-the day the
decision of a local government or the conditions                applicant is given notice of the decision about the
applied under a local law about the use of premises or          approval; or
the erection of a building or other structure permitted    (b) otherwise-the day the notice is given to the
by the planning scheme may appeal to the court                  person.
against the decision or the conditions applied.            (4) An appeal under this section may only be about-
    (2) The appeal must be started within 20 business      (a) whether a charge in the notice is so
days after the day notice of the decision is given to           unreasonable that no reasonable relevant local
the applicant.                                                  government, State infrastructure provider or
For Building Works Only                                         coordinating agency could have imposed it; or
Rights of appeal conferred by Section 4.2.9 of the         (b) an error in the calculation of the charge.
Integrated Planning Act 1997 as follows:                   (5) To remove any doubt, it is declared that an
Division 3 – Appeals to tribunals relating to              appeal under this section can not be about the
development applications                                   methodology used to establish the charge in the
Appeals by applicants                                      relevant infrastructure charges schedule or regulated
                                                           State infrastructure charges schedule.
2
  Section 6.1.44 (Conditions may be changed or cancelled   3
by assessment manager or concurrence agency in certain        Section 3.1.6 (Preliminary approval may override local
circumstances)                                             planning instrument)
                                                                                               18 of 18

Used in these records

About this file

File size
306 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice - Concurrence Agency - EPA [As Published].pdf · 306 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.