                                                                                    Officer:         Tiani Bird
                                                                                    Direct Telephone: 07 5329 6245
                                                                                    Our Reference: RAP21/0043.01
                                                                                    Your Reference: n/a

                 10 June 2025


                 GE Harris
                 C/- GE Harris
                 PO Box 340
                 PADDINGTON QLD 4064

                 [email protected]



                 Dear Sir/Madam,
                                       Referral Agency Response – Minor Change
                                                      Planning Act 2016

                 I refer to your application received on 18 December 2024, requesting a minor change to the
                 referral agency response. Council has decided your requested changes. Details are as
                 follows:
                 1.     APPLICATION DETAILS

                  Application No.               RAP21/0043.01

                  Street Address:               33 Seaview Tce, Sunshine Beach Qld 4567

                  Real Property Description:    Lot 41 RP 81810

                  Planning Scheme:              Noosa Plan 2020 (25 September 2020)

                 2.     DECISION DETAILS

                 A referral agency response was issued on 15 July 2022.
                 In relation to the request to make a minor change to the referral agency response, Council
                 on 6 June 2025, decided to approve the requested changes. The changes are detailed
                 below:
                      A. Approve the change.
                      B. Amend condition 2.
                 1.     CONCURRENCE AGENCY CONDITIONS

                 PLANNING
                        When Conditions must be Complied With
                 1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with
                        prior to the use commencing, and then compliance maintained at all times while the use
                        continues.



                 ABN 97.969.214.121                                                            PO Box 141
                 noosa.qld.gov.au                                                       Tewantin QLD 4565
                 [email protected]                                                       07 5329 6500
                                                                                                      Page 1 of 5
Document Set ID: 23794310
Version: 0, Version Date: 01/01/1900
Full text of the other 4 pages

Page 2

                        Approved Plans
                 2.     Development undertaken in accordance with this approval must generally comply with
                        the approved plans of development. The approved plans are listed in the following table
                        unless otherwise amended by these conditions.

                          Plan No.           Rev.     Plan/Document Name                           Date

                          A.101              BA(p)    Site Plan, prepared by GAIAxDesign           08/11/2024

                          A.201              BA(p)    Floor Plan Lower Ground, prepared by 08/11/2024
                                                      GAIAxDesign

                          A.202              BA(p)    Floor Plan Ground Level, prepared by 08/11/2024
                                                      GAIAxDesign

                          A.203              BA(p)    Floor Plan First Level, prepared by 08/11/2024
                                                      GAIAxDesign

                          A.204              BA(p)    Roof Plan, prepared by GAIAxDesign           08/11/2024

                          A.401              BA(p)    South-East Elevation (Street), prepared 08/11/2024
                                                      by GAIAxDesign

                          A.403              BA(p)    North-West Elevation,       prepared    by 08/11/2024
                                                      GAIAxDesign

                          A.406              BA(p)    West   Elevation,        prepared       by 08/11/2024
                                                      GAIAxDesign

                          A.502              BA(p)    Section B:B, prepared by GAIAxDesign         08/11/2024

                          A.503              BA(p)    Section C:C, prepared by GAIAxDesign         08/11/2024

                          A.506              BA(p)    Section G:G, prepared by GAIAxDesign         08/11/2024

                          A.507              BA(p)    Section H:H, prepared by GAIAxDesign         08/11/2024

                          A.508              BA(p)    Section J:J, prepared by GAIAxDesign         08/11/2024

                        Building Height
                 3.     The maximum height of the development must not exceed 8 metres above the natural
                        level (NGL) and finished ground level except for where indicated on the approved plans.
                 4.     Certification must be submitted to Council from a Licensed Surveyor which certifies that
                        the building does not exceed the maximum height requirement of this Decision Notice.
                 5.     To ensure privacy is protected between adjoining properties, the windows shown on the
                        South West Elevation and as identified by Council in the approved plans are to be fitted
                        with translucent glazing.
                        Sunset Clause for Referral Agency Response
                 6.     This Concurrence Agency response is no longer valid if the use has not commenced
                        within 4 years of the date of this notice, unless otherwise extended in writing by Council.




                                                                                                           Page 2 of 5
Document Set ID: 23794310
Version: 0, Version Date: 01/01/1900

Page 3

                        Performance Bond
                 7.     Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
                        must be submitted to Council, to secure performance of all conditions of this approval,
                        prior to the issue of a Development Permit for Building Works. The cash bond or trading
                        bank guarantee will be returned on performance of the conditions of approval less any
                        costs incurred by Council in respect of enforcing performance of this permit. Council
                        reserves the right to call upon the bond or guaranteed sum to effect compliance with
                        conditions.
                        Landscaping
                 8.     A minimum of 20% of the site must be retained as soft landscaping, and in accordance
                        with Council’s Planning Scheme Policy PSP2 - Landscaping.
                 9.     Screening vegetation must be planted along the rear boundary in accordance with
                        Council’s Planning Scheme Policy PSP2 - Landscaping. The planted vegetation must
                        have a minimum pot size of 25 litres and consist of native, endemic species with a
                        mature height of not less than 2.5 metres and a minimum spacing of 2 metre centres.
                 10.    Existing vegetation in the road reserve must be retained, unless written authorisation
                        from Council is granted for the clearing.
                 11.    Trees to be retained must be protected from clearing or construction activities by:
                        a.      clearly marking vegetation to be retained with flagging tape
                        b.      installing protective fencing around the drip line of the vegetation
                        c.      restricting stockpiling, storage and vehicle parking to those areas which are
                                already cleared
                        d.      using low impact construction techniques around vegetation.
                        Site Access and Driveways
                 12.    A sealed access driveway must be provided from Seaview Terrace to all parking and
                        manoeuvring areas of the development. The works must be undertaken in accordance
                        with an Operational Works approval and be generally in accordance with the approved
                        plans.
                        Stormwater Drainage
                 13.    The site must be provided with a stormwater drainage system connecting to a lawful
                        point of discharge. The works must be undertaken generally in accordance with drawing
                        number 31173-SW1.1 prepared by SCG Consulting Engineers dated October 2021
                 14.    Stormwater runoff from the development must not cause scour or damage to the subject
                        site, any adjoining property or the road reserve.
                        Easements
                 15.    Unless otherwise agreed in writing by the relevant service provider, any public or third
                        party infrastructure located on the subject site must be placed within an easement
                        registered against the title of the property.
                 16.    All easements must be designed in accordance with the planning scheme and granted
                        at no cost to the Grantee. Where the Grantee is Council or a service authority, the
                        easement documentation must be in accordance with the Grantee’s standard easement
                        terms. Draft easement documentation must be submitted to Council for endorsement.
                 17.    All works must be kept clear of any existing or proposed easements on the subject land,
                        unless agreed otherwise in writing by the Grantee.




                                                                                                         Page 3 of 5
Document Set ID: 23794310
Version: 0, Version Date: 01/01/1900

Page 4

                        Geotechnical Stability
                 18.    All works must be carried out in accordance with the recommendations, including the
                        preparation of a Dilapidation Report, contained in:
                        a.      The Slope Stability Assessment – Report No. 31173 (SL) prepared by SCG
                                Consulting Engineers dated 24 February 2022, and
                        b.      The Soil Test and Footing Report - Report No. 31173 (S).Rev A prepared by SCG
                                Consulting Engineers dated 24 February 2022.
                 19.    At the completion of the works certification must be submitted to Council from a qualified
                        person* which certifies that the development has been constructed in accordance with
                        the conditions of this approval and that the development has a minimum factor of safety
                        against landslip of 1.5 in the long term.
                        *(Refer to advisory Note)
                        Earthworks and Retaining Walls
                 20.    All earthworks and associated retaining structures/batters must be contained entirely
                        within the subject site unless written permission from the respective landowner(s) is
                        provided to Council. All earthworks must be undertaken in accordance with the
                        provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial
                        and Residential Developments.
                 21.    Where the development involves excavation or filling over, or adjacent to, drainage,
                        water supply or sewerage infrastructure, all access chamber surface levels must be
                        adjusted to provide a freeboard of 100mm above the finished ground surface level.
                 22.    All retaining walls must be designed and constructed in accordance with the planning
                        scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
                        walls that are publicly accessible and exceed 1.0m in height must be fitted with a
                        commercial grade safety fence.
                        Damage to Services and Assets
                 23.    Any damage caused to existing services and assets as a result of the development
                        works must be repaired at no cost to the asset owner at the following times:
                        a.      where the damage would cause a hazard to pedestrian or vehicle safety,
                                immediately; or
                        b.      where otherwise, upon completion of the works associated with the development.
                        Any repair work which proposes to alter the alignment or level of existing services and
                        assets must first be referred to the relevant service authority for approval.
                 2.     REASONS FOR INCLUSION OF CONDITIONS

                 The proposal is subject to specific built form parameters outlined in The Noosa Plan.
                 3.     ADVISORY NOTES

                 The following notes are included for guidance and information purposes only and do not form
                 part of the referral agency conditions:
                        Building and Construction Industry (Portable Long Service Leave) Levy
                 1.     The QLeave levy must be paid prior to the issue of a development permit where it is
                        required. Council will not be able to issue a Decision Notice without receipt of details
                        that the Levy has been paid.




                                                                                                          Page 4 of 5
Document Set ID: 23794310
Version: 0, Version Date: 01/01/1900

Page 5

                        Co-ordination of Operational Works Assessment
                 2.     Additional application fees apply to Operational Work applications where the different
                        aspects of the works are lodged separately. Significant savings in application fees will
                        result if all works are lodged in a single application.
                        Qualified Person
                 3.     For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
                        stability for the development, a qualified person is considered to be a person who:
                        a)      is a Registered Professional Engineer of Queensland (RPEQ); and
                        b)      has a degree in civil engineering or engineering geology; and
                        c)      has a minimum of 5 years experience in the field of geotechnical engineering or
                                engineering geology.
                        Preparation of a Preliminary Construction Management Plan
                 4.     A preliminary Construction Management Plan must be submitted with the Operational
                        Works application and must address the following:
                        a)      appropriate traffic signage in accordance with the Manual of Uniform Traffic
                                Control Devices (MUTCD)
                        b)      provision for safe vehicle and pedestrian access across the frontage of the site
                                both during daily construction and after daily construction has ceased.
                        c)      it is acknowledged that the preliminary Construction Management Plan will be a
                                draft document requiring finalisation upon appointment of the Principal Contractor
                                employed to construct the works and a final document will be required to be
                                submitted at the Pre-Start Meeting for the project.
                        Private Infrastructure
                 5.     All private infrastructure for the development must be designed to meet the planning
                        scheme requirements unless otherwise agreed by the relevant authority.
                        Infrastructure Charges
                 6.     All developments and/or changes to existing developments may require payment of
                        “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
                        Resolution” made pursuant to the planning legislation and regulations current at the time
                        of issue.
                 4.     REPRESENTATIONS ABOUT REFERRAL AGENCY RESPONSE

                 The applicant may make representations to Council about this referral agency response at
                 any time before the application is decided pursuant to section 30 of the Development
                 Assessment Rules.


                 Yours faithfully,


                 Tiani Bird
                 Development Planner


                 Enc:   Approved Plans/Documents




                                                                                                          Page 5 of 5
Document Set ID: 23794310
Version: 0, Version Date: 01/01/1900

Used in these records

About this file

File size
107 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Referral Agency Response - Minor Change - Planning RAP21 0043.01 (As Published).pdf · 107 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.