Site: I2 [I2 - 2037 Baseline - PM (Site Folder: 2037 BL)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
620.30926-Noosa Civic Expansion
Prepared by: SJ
Reviewed by: BR
Site Category: Existing Design
Roundabout
Vehicle Movement Performance
Mov Turn Mov Demand Arrival Deg. Aver. Level of 95% Back Of Prop. Eff. Aver. Aver.
ID Class Flows Flows Satn Delay Service Queue Que Stop No. of Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ] Rate Cycles
veh/h % veh/h % v/c sec veh m km/h
South: Hofmann Drive (S)
2 T1 All MCs 423 3.0 423 3.0 0.494 1.8 LOS A 3.9 28.0 0.61 0.52 0.61 26.2
3 R2 All MCs 120 3.0 120 3.0 0.494 14.0 LOS A 3.9 28.0 0.61 0.52 0.61 12.6
3u U All MCs 1 3.0 1 3.0 0.494 6.0 LOS A 3.9 28.0 0.61 0.52 0.61 27.2
Approach 544 3.0 544 3.0 0.494 4.5 LOS A 3.9 28.0 0.61 0.52 0.61 18.4
East: Noosa Civic Loop Road (E)
4 L2 All MCs 121 3.0 121 3.0 0.366 2.4 LOS A 2.4 17.2 0.61 0.41 0.61 12.3
6 R2 All MCs 235 3.0 235 3.0 0.366 2.4 LOS A 2.4 17.2 0.61 0.41 0.61 10.6
6u U All MCs 3 3.0 3 3.0 0.366 2.4 LOS A 2.4 17.2 0.61 0.41 0.61 9.9
Approach 359 3.0 359 3.0 0.366 2.4 LOS A 2.4 17.2 0.61 0.41 0.61 11.2
North: Hofmann Drive (N)
7 L2 All MCs 141 3.0 141 3.0 0.383 5.8 LOS A 2.8 20.3 0.41 0.32 0.41 11.0
8 T1 All MCs 341 3.0 341 3.0 0.383 0.8 LOS A 2.8 20.3 0.41 0.32 0.41 27.6
9u U All MCs 1 3.0 1 3.0 0.383 5.0 LOS A 2.8 20.3 0.41 0.32 0.41 2.9
Approach 483 3.0 483 3.0 0.383 2.3 LOS A 2.8 20.3 0.41 0.32 0.41 16.6
All Vehicles 1386 3.0 1386 3.0 0.494 3.2 LOS A 3.9 28.0 0.54 0.42 0.54 14.6
Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Options
tab).
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.
SIDRA INTERSECTION 9.1 | Copyright © 2000-2022 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: SLR CONSULTING AUSTRALIA | Licence: NETWORK / FLOATING | Processed: Friday, 29 September 2023 1:49:50 PM
Project: H:\Projects-SLR\620-BNE\620-BNE\620.30926.00000 Noosa Shopping Centre Expansion\02 Analysis\02. SIDRA\2023 09 18 - Updated
Lot 1 SIDRA\620.30926-Noosa Lot 1 Retail SIDRA-v0.5.sip9
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E- Traffic Impact Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.