Appendix E- Traffic Impact Assessment.pdf

of 151
MOVEMENT SUMMARY
      Site: I3 [I3 - 2037 Baseline - SAT (Site Folder: 2037 BL)]
Output produced by SIDRA INTERSECTION Version: 9.1.2.202
620.30326-Noosa Civic Expansion
Prepared by: SJ
Reviewed by: BR
Site Category: Existing Design
Roundabout


 Vehicle Movement Performance
 Mov     Turn Mov       Demand         Arrival    Deg.    Aver. Level of         95% Back Of     Prop.     Eff.    Aver.    Aver.
 ID           Class        Flows        Flows     Satn    Delay Service             Queue         Que     Stop    No. of   Speed
                     [ Total HV ] [ Total HV ]                                 [ Veh.   Dist ]            Rate    Cycles
                      veh/h % veh/h %               v/c     sec                  veh      m                                  km/h
 South: Hofmann Drive (S)
 1        L2 All MCs        8 3.0      8 3.0     0.063       4.2   LOS A        0.3       2.2     0.41     0.49     0.41     45.5
 2        T1 All MCs       59 3.0     59 3.0     0.063       4.9   LOS A        0.3       2.2     0.41     0.49     0.41     37.4
 3       R2 All MCs         1 3.0      1 3.0     0.063       9.8   LOS A        0.3       2.2     0.41     0.49     0.41     38.9
 3u       U     All MCs     1 3.0      1 3.0     0.063     10.5    LOS A        0.3       2.2     0.41     0.49     0.41     44.7
 Approach                  69 3.0     69 3.0     0.063       5.0   LOS A        0.3       2.2     0.41     0.49     0.41     38.6

 East: Loading Dock Access (E)
 4        L2 All MCs        1 3.0      1 3.0     0.007       1.5   LOS A        0.0       0.2     0.44     0.23     0.44     40.4
 5        T1 All MCs        1 3.0      1 3.0     0.007       1.5   LOS A        0.0       0.2     0.44     0.23     0.44     42.3
 6       R2 All MCs         5 3.0      5 3.0     0.007       1.5   LOS A        0.0       0.2     0.44     0.23     0.44     33.0
 Approach                   7 3.0      7 3.0     0.007       1.5   LOS A        0.0       0.2     0.44     0.23     0.44     36.1

 North: Hofmann Drive (N)
 7        L2 All MCs        7 3.0      7 3.0     0.210       2.0   LOS A        1.2       8.7     0.10     0.32     0.10     26.3
 8        T1 All MCs       60 3.0     60 3.0     0.210       0.1   LOS A        1.2       8.7     0.10     0.32     0.10     37.5
 9       R2 All MCs       259 3.0    259 3.0     0.210       3.0   LOS A        1.2       8.7     0.10     0.32     0.10     38.1
 9u       U     All MCs     4 3.0      4 3.0     0.210       3.8   LOS A        1.2       8.7     0.10     0.32     0.10     28.5
 Approach                 331 3.0    331 3.0     0.210       2.4   LOS A        1.2       8.7     0.10     0.32     0.10     37.7

 West: Rene Street (W)
 10       L2 All MCs      331 3.0    331 3.0     0.248       3.2   LOS A        1.5      11.0     0.25     0.41     0.25     39.2
 11       T1 All MCs        1 3.0      1 3.0     0.248       6.9   LOS A        1.5      11.0     0.25     0.41     0.25     41.3
 12      R2 All MCs         6 3.0      6 3.0     0.248       7.7   LOS A        1.5      11.0     0.25     0.41     0.25     46.1
 12u      U     All MCs     7 3.0      7 3.0     0.248       9.5   LOS A        1.5      11.0     0.25     0.41     0.25     46.4
 Approach                 345 3.0    345 3.0     0.248       3.4   LOS A        1.5      11.0     0.25     0.41     0.25     39.5

 All Vehicles             753 3.0    753 3.0     0.248       3.1   LOS A        1.5      11.0     0.20     0.38     0.20     38.6

Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Options
tab).
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2022 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: SLR CONSULTING AUSTRALIA | Licence: NETWORK / FLOATING | Processed: Tuesday, 10 October 2023 11:34:43 AM
Project: H:\Projects-SLR\620-BNE\620-BNE\620.30926.00000 Noosa Shopping Centre Expansion\02 Analysis\02. SIDRA\2023 09 18 - Updated
Lot 1 SIDRA\620.30926-Noosa Lot 1 Retail SIDRA-v0.5.sip9

Log in to download the original (Appendix E- Traffic Impact Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.